A number of updates have been happening behind the scenes. There have been five pipelines that changed or updated their informational postings sites.
The following pipelines have been updated and should be pulling from the new sites:
- Critical Notice Tracking: 195
- Capacity Connection (display): 105
- Capacity Tracking (saving to db, notifications): 20
- Non-Critical Notice Tracking: 2
Cheyenne Connector
- Added Cheyenne Connector Informational Postings overview to the system.
East Cheyenne Gas Storage
- Added East Cheyenne Gas Storage Informational Postings overview to the system.
Rockies Express Pipeline
- Added Rockies Express Pipeline Informational Postings overview to the system.
Ruby Pipeline
- Added Ruby Pipeline Informational Postings overview to the system.
Tallgrass Interstate Gas Transmission
- Added Tallgrass Interstate Gas Transmission Informational Postings overview to the system.
Trailblazer Pipeline Company
- Added Trailblazer Pipeline Company Informational Postings overview to the system.