Algonquin Gas Transmission Critical Notices
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| Type | Posted | Effective | End | Identifier | Status | Subject | Response |
|---|---|---|---|---|---|---|---|
| Capacity Constraint | 12/30/25 | 12/31/25 | 01/01/26 | 172024 | AGT Pipeline Conditions for 12/31/2025 | ||
| Operational Flow Order | 12/30/25 | 01/01/26 | 03/30/26 | 171984 | AGT Operational Flow Order -- UPDATE | ||
| Capacity Constraint | 12/29/25 | 12/30/25 | 12/31/25 | 171970 | AGT Pipeline Conditions for 12/30/2025 | ||
| Capacity Constraint | 12/28/25 | 12/29/25 | 12/30/25 | 171930 | AGT Pipeline Conditions for 12/29/2025 | ||
| Capacity Constraint | 12/27/25 | 12/28/25 | 12/29/25 | 171895 | AGT Pipeline Conditions for 12/28/2025 | ||
| Capacity Constraint | 12/26/25 | 12/27/25 | 12/28/25 | 171861 | AGT Pipeline Conditions for 12/27/2025 | ||
| Capacity Constraint | 12/25/25 | 12/26/25 | 12/27/25 | 171817 | AGT Pipeline Conditions for 12/26/2025 | ||
| Capacity Constraint | 12/24/25 | 12/25/25 | 12/26/25 | 171783 | AGT Pipeline Conditions for 12/25/2025 | ||
| Capacity Constraint | 12/23/25 | 12/24/25 | 12/25/25 | 171725 | AGT Pipeline Conditions for 12/24/2025 | ||
| Operational Flow Order | 12/23/25 | 12/29/25 | 03/23/26 | 171710 | AGT Operational Flow Order -- UPDATE | ||
| Operational Flow Order | 12/23/25 | 12/23/25 | 03/23/26 | 171709 | AGT Operational Flow Order -- EFF 12/29 -- UPDATE | ||
| Operational Flow Order | 12/23/25 | 12/29/25 | 03/23/26 | 171706 | AGT Operational Flow Order -- UPDATE EFF 12/29 | ||
| Capacity Constraint | 12/22/25 | 12/23/25 | 12/24/25 | 171683 | AGT Pipeline Conditions for 12/23/2025 | ||
| Operational Flow Order | 12/22/25 | 12/24/25 | 03/22/26 | 171663 | AGT Customer Specific Operational Flow Order -- EFF 12-24 | ||
| Capacity Constraint | 12/21/25 | 12/22/25 | 12/23/25 | 171652 | AGT Pipeline Conditions for 12/22/2025 | ||
| Capacity Constraint | 12/20/25 | 12/21/25 | 12/22/25 | 171618 | AGT Pipeline Conditions for 12/21/2025 | ||
| Capacity Constraint | 12/19/25 | 12/20/25 | 12/21/25 | 171583 | AGT Pipeline Conditions for 12/20/2025 | ||
| Operational Flow Order | 12/19/25 | 12/20/25 | 03/19/26 | 171541 | AGT Operational Flow Order -- EFF 12/20 | ||
| Capacity Constraint | 12/18/25 | 12/19/25 | 12/20/25 | 171532 | AGT Pipeline Conditions for 12/19/2025 | ||
| Capacity Constraint | 12/17/25 | 12/18/25 | 12/19/25 | 171494 | AGT Pipeline Conditions for 12/18/2025 | ||
| Capacity Constraint | 12/17/25 | 12/18/25 | 12/19/25 | 171491 | TE Pipeline Conditions for 12/18/2025 | ||
| Operational Flow Order | 12/17/25 | 12/19/25 | 03/17/26 | 171462 | AGT Operational Flow Order -- EFF 12/19 | ||
| Operational Flow Order | 12/17/25 | 12/18/25 | 03/17/26 | 171459 | AGT Operational Flow Order -- LIFTED EFF 12/18 | ||
| Capacity Constraint | 12/16/25 | 12/17/25 | 12/18/25 | 171446 | AGT Pipeline Conditions for 12/17/2025 | ||
| Operational Flow Order | 12/16/25 | 12/17/25 | 03/16/26 | 171412 | AGT Operational Flow Order -- Tolerance Change EFF 12/17 | ||
| Capacity Constraint | 12/15/25 | 12/16/25 | 12/17/25 | 171399 | AGT Pipeline Conditions for 12/16/2025 | ||
| Capacity Constraint | 12/14/25 | 12/15/25 | 12/16/25 | 171354 | AGT Pipeline Conditions for 12/15/2025 | ||
| Capacity Constraint | 12/13/25 | 12/14/25 | 12/15/25 | 171320 | AGT Pipeline Conditions for 12/14/2025 | ||
| Capacity Constraint | 12/12/25 | 12/13/25 | 12/14/25 | 171276 | AGT Pipeline Conditions for 12/13/2025 | ||
| Capacity Constraint | 12/11/25 | 12/12/25 | 12/13/25 | 171232 | AGT Pipeline Conditions for 12/12/2025 | ||
| Capacity Constraint | 12/10/25 | 12/11/25 | 12/12/25 | 171177 | AGT Pipeline Conditions for 12/11/2025 | ||
| Capacity Constraint | 12/09/25 | 12/09/25 | 03/09/26 | 171142 | Stony Point Unplanned Outage -- COMPLETE | ||
| Capacity Constraint | 12/09/25 | 12/10/25 | 12/11/25 | 171138 | AGT Pipeline Conditions for 12/10/2025 | ||
| Capacity Constraint | 12/09/25 | 12/09/25 | 03/09/26 | 171109 | Stony Point Unplanned Outage -- UPDATE | ||
| Capacity Constraint | 12/09/25 | 12/09/25 | 03/09/26 | 171102 | Stony Point Unplanned Outage | ||
| Capacity Constraint | 12/08/25 | 12/08/25 | 03/08/26 | 171100 | AGT Unplanned Outage -- COMPLETE | ||
| Capacity Constraint | 12/08/25 | 12/09/25 | 12/10/25 | 171095 | AGT Pipeline Conditions for 12/9/2025 | ||
| Capacity Constraint | 12/08/25 | 12/08/25 | 03/08/26 | 171066 | AGT Unplanned Outage | ||
| Capacity Constraint | 12/07/25 | 12/08/25 | 12/09/25 | 171056 | AGT Pipeline Conditions for 12/8/2025 | ||
| Capacity Constraint | 12/06/25 | 12/07/25 | 12/08/25 | 171011 | AGT Pipeline Conditions for 12/7/2025 | ||
| Capacity Constraint | 12/05/25 | 12/06/25 | 12/07/25 | 170976 | AGT Pipeline Conditions for 12/6/2025 | ||
| Capacity Constraint | 12/04/25 | 12/05/25 | 12/06/25 | 170938 | AGT Pipeline Conditions for 12/5/2025 | ||
| Capacity Constraint | 12/04/25 | 12/04/25 | 12/05/25 | 170907 | AGT Pipeline Conditions for 12/4/2025 -- INTRADAY | ||
| Capacity Constraint | 12/03/25 | 12/04/25 | 12/05/25 | 170895 | AGT Pipeline Conditions for 12/4/2025 | ||
| Capacity Constraint | 12/02/25 | 12/03/25 | 12/04/25 | 170807 | AGT Pipeline Conditions for 12/3/2025 | ||
| Capacity Constraint | 12/01/25 | 12/02/25 | 12/03/25 | 170753 | AGT Pipeline Conditions for 12/02/2025 | ||
| Operational Flow Order | 12/01/25 | 12/03/25 | 03/01/26 | 170727 | AGT Operational Flow Order -- Tolerance Change EFF 12/3 | ||
| Capacity Constraint | 11/30/25 | 12/01/25 | 12/02/25 | 170715 | AGT Pipeline Conditions for 12/01/2025 | ||
| Capacity Constraint | 11/29/25 | 11/30/25 | 12/01/25 | 170684 | AGT Pipeline Conditions for 11/30/2025 | ||
| Capacity Constraint | 11/28/25 | 11/29/25 | 11/30/25 | 170651 | AGT Pipeline Conditions for 11/29/2025 | ||
| Capacity Constraint | 11/27/25 | 11/28/25 | 11/29/25 | 170618 | AGT Pipeline Conditions for 11/28/2025 | ||
| Other | 11/26/25 | 11/26/25 | 02/24/26 | 170563 | Link Outage - Wednesday, November 26th Resolved | ||
| Capacity Constraint | 11/26/25 | 11/27/25 | 11/28/25 | 170561 | AGT Pipeline Conditions for 11/27/2025 -- UPDATE | ||
| Operational Flow Order | 11/26/25 | 11/26/25 | 02/24/26 | 170560 | AGT Operational Flow Order -- UPDATE -- EFF 11/28 | ||
| Capacity Constraint | 11/26/25 | 11/27/25 | 11/28/25 | 170558 | AGT Pipeline Conditions for 11/27/2025 | ||
| Capacity Constraint | 11/26/25 | 11/26/25 | 02/24/26 | 170527 | AGT Operational Advisory | ||
| Capacity Constraint | 11/25/25 | 11/26/25 | 11/27/25 | 170501 | AGT Pipeline Conditions for 11/26/2025 | ||
| Operational Flow Order | 11/25/25 | 11/27/25 | 02/23/26 | 170463 | AGT Operational Flow Order -- CORRECTION | ||
| Operational Flow Order | 11/25/25 | 11/27/25 | 02/23/26 | 170460 | AGT Operational Flow Order -- EFF 11/27 | ||
| Capacity Constraint | 11/24/25 | 11/25/25 | 11/26/25 | 170434 | AGT Pipeline Conditions for 11/25/2025 | ||
| Operational Flow Order | 11/24/25 | 11/25/25 | 02/22/26 | 170415 | AGT Customer Specific Operational Flow Order -- LIFT EFF 11-25 | ||
| Capacity Constraint | 11/23/25 | 11/24/25 | 11/25/25 | 170410 | AGT Pipeline Conditions for 11/24/2025 | ||
| Capacity Constraint | 11/22/25 | 11/23/25 | 11/24/25 | 170365 | AGT Pipeline Conditions for 11/23/2025 | ||
| Operational Flow Order | 11/21/25 | 11/21/25 | 02/19/26 | 170346 | AGT Customer Specific Operational Flow Order | ||
| Capacity Constraint | 11/21/25 | 11/22/25 | 11/23/25 | 170330 | AGT Pipeline Conditions for 11/22/2025 | ||
| Capacity Constraint | 11/20/25 | 11/21/25 | 11/22/25 | 170282 | AGT Pipeline Conditions for 11/21/2025 | ||
| Capacity Constraint | 11/19/25 | 11/20/25 | 11/21/25 | 170234 | AGT Pipeline Conditions for 11/20/2025 | ||
| Capacity Constraint | 11/18/25 | 11/19/25 | 11/20/25 | 170186 | AGT Pipeline Conditions for 11/19/2025 | ||
| Capacity Constraint | 11/17/25 | 11/18/25 | 11/19/25 | 170133 | AGT Pipeline Conditions for 11/18/2025 | ||
| Operational Flow Order | 11/17/25 | 11/18/25 | 02/15/26 | 170109 | AGT Operational Flow Order -- LIFTED | ||
| Capacity Constraint | 11/16/25 | 11/17/25 | 11/18/25 | 170096 | AGT Pipeline Conditions for 11/17/2025 | ||
| Capacity Constraint | 11/15/25 | 11/16/25 | 11/17/25 | 170059 | AGT Pipeline Conditions for 11/16/2025 | ||
| Capacity Constraint | 11/14/25 | 11/15/25 | 11/16/25 | 170022 | AGT Pipeline Conditions for 11/15/2025 | ||
| Operational Flow Order | 11/13/25 | 11/17/25 | 02/11/26 | 169954 | AGT Operational Flow Order | ||
| Capacity Constraint | 11/13/25 | 11/14/25 | 11/15/25 | 169971 | AGT Pipeline Conditions for 11/14/2025 | ||
| Capacity Constraint | 11/12/25 | 11/13/25 | 11/14/25 | 169929 | AGT Pipeline Conditions for 11/13/2025 | ||
| Capacity Constraint | 11/11/25 | 11/12/25 | 11/13/25 | 169898 | AGT Pipeline Conditions for 11/12/2025 | ||
| Capacity Constraint | 11/10/25 | 11/11/25 | 11/12/25 | 169870 | AGT Pipeline Conditions for 11/11/2025 | ||
| Operational Flow Order | 11/10/25 | 11/11/25 | 11/12/25 | 169816 | AGT Operational Flow Order -- EFF 11/11 | ||
| Capacity Constraint | 11/09/25 | 11/10/25 | 11/11/25 | 169810 | AGT Pipeline Conditions for 11/10/2025 | ||
| Capacity Constraint | 11/08/25 | 11/08/25 | 02/06/26 | 169777 | AGT Operational Advisory | ||
| Capacity Constraint | 11/08/25 | 11/09/25 | 11/10/25 | 169771 | AGT Pipeline Conditions for 11/09/2025 | ||
| Capacity Constraint | 11/07/25 | 11/08/25 | 11/09/25 | 169724 | AGT Pipeline Conditions for 11/8/2025 | ||
| Operational Flow Order | 11/07/25 | 11/08/25 | 11/10/25 | 169687 | AGT Operational Flow Order -- EFF 11/08 | ||
| Capacity Constraint | 11/06/25 | 11/07/25 | 11/08/25 | 169681 | AGT Pipeline Conditions for 11/07/2025 | ||
| Capacity Constraint | 11/05/25 | 11/06/25 | 11/07/25 | 169623 | AGT Pipeline Conditions for 11/6/2025 | ||
| Capacity Constraint | 11/04/25 | 11/05/25 | 11/06/25 | 169596 | AGT Pipeline Conditions for 11/5/2025 | ||
| Capacity Constraint | 11/03/25 | 11/04/25 | 11/05/25 | 169548 | AGT Pipeline Conditions for 11/4/2025 | ||
| Capacity Constraint | 11/02/25 | 11/03/25 | 11/04/25 | 169491 | AGT Pipeline Conditions for 11/3/2025 | ||
| Capacity Constraint | 11/01/25 | 11/02/25 | 11/03/25 | 169457 | AGT Pipeline Conditions for 11/2/2025 | ||
| Capacity Constraint | 10/31/25 | 11/01/25 | 11/02/25 | 169433 | AGT Pipeline Conditions for 11/01/2025 | ||
| Capacity Constraint | 10/30/25 | 10/31/25 | 11/01/25 | 169372 | AGT Pipeline Conditions for 10/31/2025 | ||
| Capacity Constraint | 10/29/25 | 10/30/25 | 10/31/25 | 169326 | AGT Pipeline Conditions for 10/30/2025 | ||
| Computer System Status | 10/29/25 | 10/29/25 | 01/27/26 | 169289 | LINK System Update Gas Day 10/30/2025 | ||
| Capacity Constraint | 10/28/25 | 10/29/25 | 10/30/25 | 169252 | AGT Pipeline Conditions for 10/29/2025 | ||
| Operational Flow Order | 10/28/25 | 10/28/25 | 01/26/26 | 169236 | AGT Customer Specific Hourly Operational Flow Order -- LIFT EFF 10/28 | ||
| Capacity Constraint | 10/27/25 | 10/28/25 | 10/29/25 | 169203 | AGT Pipeline Conditions for 10/28/2025 | ||
| Capacity Constraint | 10/27/25 | 10/27/25 | 01/25/26 | 169193 | Burrilville to EOLN Digs -- COMPLETE -- CORRECTION | ||
| Capacity Constraint | 10/27/25 | 10/27/25 | 01/25/26 | 169192 | Burrilville to EOLN Digs -- COMPLETE | ||
| Operational Flow Order | 10/27/25 | 10/27/25 | 01/25/26 | 169191 | AGT Customer Specific Hourly Operational Flow Order -- EFF 10/27 -- Correction | ||
| Operational Flow Order | 10/27/25 | 10/27/25 | 01/25/26 | 169190 | AGT Customer Specific Hourly Operational Flow Order -- EFF 10/27 | ||
| Capacity Constraint | 10/27/25 | 10/27/25 | 01/25/26 | 169185 | G System Operational Advisory | ||
| Capacity Constraint | 10/26/25 | 10/27/25 | 10/28/25 | 169163 | AGT Pipeline Conditions for 10/27/2025 | ||
| Capacity Constraint | 10/25/25 | 10/26/25 | 10/27/25 | 169130 | AGT Pipeline Conditions for 10/26/2025 | ||
| Capacity Constraint | 10/24/25 | 10/25/25 | 10/26/25 | 169096 | AGT Pipeline Conditions for 10/25/2025 | ||
| Capacity Constraint | 10/23/25 | 10/24/25 | 10/25/25 | 169046 | AGT Pipeline Conditions for 10/24/2025 | ||
| Capacity Constraint | 10/22/25 | 10/23/25 | 10/24/25 | 169003 | AGT Pipeline Conditions for 10/23/2025 | ||
| Capacity Constraint | 10/21/25 | 10/22/25 | 10/23/25 | 168963 | AGT Pipeline Conditions for 10/22/2025 | ||
| Capacity Constraint | 10/20/25 | 10/21/25 | 10/22/25 | 168903 | AGT Pipeline Conditions for 10/21/2025 | ||
| Capacity Constraint | 10/19/25 | 10/20/25 | 10/21/25 | 168875 | AGT Pipeline Conditions for 10/20/2025 | ||
| Capacity Constraint | 10/18/25 | 10/19/25 | 10/20/25 | 168828 | AGT Pipeline Conditions for 10/19/2025 | ||
| Capacity Constraint | 10/17/25 | 10/18/25 | 10/19/25 | 168804 | AGT Pipeline Conditions for 10/18/2025 | ||
| Capacity Constraint | 10/16/25 | 10/17/25 | 10/18/25 | 168740 | AGT Pipeline Conditions for 10/17/2025 | ||
| Operational Flow Order | 10/16/25 | 10/18/25 | 10/20/25 | 168712 | AGT Operational Flow Order -- EFF 10/18 | ||
| Capacity Constraint | 10/15/25 | 10/16/25 | 10/17/25 | 168691 | AGT Pipeline Conditions for 10/16/2025 | ||
| Capacity Constraint | 10/14/25 | 10/15/25 | 10/16/25 | 168642 | AGT Pipeline Conditions for 10/15/2025 | ||
| Capacity Constraint | 10/13/25 | 10/14/25 | 10/15/25 | 168607 | AGT Pipeline Conditions for 10/14/2025 | ||
| Capacity Constraint | 10/12/25 | 10/13/25 | 10/14/25 | 168589 | AGT Pipeline Conditions for 10/13/2025 | ||
| Capacity Constraint | 10/11/25 | 10/11/25 | 10/12/25 | 168557 | AGT Pipeline Conditions for 10/11/2025 -- INTRADAY | ||
| Capacity Constraint | 10/11/25 | 10/12/25 | 10/13/25 | 168555 | AGT Pipeline Conditions for 10/12/2025 | ||
| Capacity Constraint | 10/10/25 | 10/11/25 | 10/12/25 | 168487 | AGT Pipeline Conditions for 10/11/2025 | ||
| Capacity Constraint | 10/10/25 | 10/10/25 | 10/11/25 | 168474 | AGT Pipeline Conditions for 10/10/2025 -- INTRADAY | ||
| Capacity Constraint | 10/09/25 | 10/09/25 | 10/10/25 | 168457 | Hanover TE Compressor Station -- COMPLETE | ||
| Operational Flow Order | 10/09/25 | 10/11/25 | 10/14/25 | 168418 | AGT Operational Flow Order -- EFF 10/11 | ||
| Capacity Constraint | 10/09/25 | 10/10/25 | 10/11/25 | 168432 | AGT Pipeline Conditions for 10/10/2025 | ||
| Capacity Constraint | 10/08/25 | 10/09/25 | 10/10/25 | 168396 | AGT Pipeline Conditions for 10/9/2025 | ||
| Capacity Constraint | 10/07/25 | 10/08/25 | 10/09/25 | 168370 | AGT Pipeline Conditions for 10/8/2025 | ||
| Capacity Constraint | 10/06/25 | 10/07/25 | 10/08/25 | 168324 | AGT Pipeline Conditions for 10/7/2025 | ||
| Capacity Constraint | 10/05/25 | 10/06/25 | 10/07/25 | 168269 | AGT Pipeline Conditions for 10/6/2025 | ||
| Capacity Constraint | 10/04/25 | 10/05/25 | 10/06/25 | 168236 | AGT Pipeline Conditions for 10/5/2025 | ||
| Capacity Constraint | 10/03/25 | 10/04/25 | 10/05/25 | 168202 | AGT Pipeline Conditions for 10/4/2025 | ||
| Capacity Constraint | 10/02/25 | 10/03/25 | 10/04/25 | 168169 | AGT Pipeline Conditions for 10/3/2025 | ||
| Capacity Constraint | 10/02/25 | 10/02/25 | 12/31/25 | 168152 | Southeast Compressor Station Outage -- COMPLETE | ||
| Operational Flow Order | 10/02/25 | 10/04/25 | 10/06/25 | 168133 | AGT Operational Flow Order -- EFF 10/4 |