NEXUS Gas Transmission Notice 182185

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Critical Notice Description: Critical Notices

Notice Effective Date / Time: 08/27/2026 09:00:00 AM

Notice End Date / Time: 08/28/2026 09:00:00 AM

Notice Identifier: 182185

Notice Status Description: Initiate

Notice Type: Capacity Constraint

Posting Date / Time: 08/26/2026 01:54:27 PM

Prior Notice Identifier: None

Required Response Indicator Description: No response required

Response Date / Time: None

Subject: NEXUS Pipeline Conditions for 8/27/2026

Notice Text:
For Gas Day August 27, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity.  The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:












Restricted Locations Scheduled and Sealed   Priority % Restricted Notes
TABS IT 4B 4A 3B 3A 2 1
All Vector Meters Downstream of Milford Junction N4MJ1   N/A 100% 100% 100% 100% 100% 100% 100% Due to DTE Posted Outage
Belle River   N/A 100% 100% 100% 100% 100% 100% 56% Due to DTE Posted Outage
Ypsilanti   N/A 100% 100% 100% 100% 100% 100% 55% Due to DTE Posted Outage












OFO / Imbalance Notice










OFO ---









Customer Specific OFO No DP - issued 8/20/2026.  2% / 500 Dth/d Tolerance


Imbalances Warnings Stay Balanced





















Gas Quality:










NEXUS has been informed by TETCO of ongoing gas quality issues at meters N4714, N4733, N4915. TE/NEXUS will require a partial reduction of flow beginning as soon as September 9, 2026, if gas quality issues are not corrected by that date. These meter operators will remain at a reduced flow, and will be subject to further reductions, until the gas entering TE's system is compliant with TE's gas quality standards in its GT&C.  The upstream point operators are required to ensure nominations are commensurate with the physical flow, or non-performance confirmation reductions may be required.












Systemwide Notes:










Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.













Please contact your Operations Account Representative should you have any questions.


Critical Notice Description: Critical Notices

Notice Effective Date / Time: 08/27/2026 09:00:00 AM

Notice End Date / Time: 08/28/2026 09:00:00 AM

Notice Identifier: 182185

Notice Status Description: Initiate

Notice Type: Capacity Constraint

Posting Date / Time: 08/26/2026 01:54:27 PM

Prior Notice Identifier: None

Required Response Indicator Description: No response required

Response Date / Time: None

Subject: NEXUS Pipeline Conditions for 8/27/2026

Notice Text:
For Gas Day August 27, 2026, Nexus Gas Transmission, LLC (NEXUS) has approved and scheduled nominations at each pipeline segment and meter station up to NEXUS's operational capacity.  The following locations have been restricted due to requested nominations exceeding NEXUS's operational capacity:












Restricted Locations Scheduled and Sealed   Priority % Restricted Notes
TABS IT 4B 4A 3B 3A 2 1
All Vector Meters Downstream of Milford Junction N4MJ1   N/A 100% 100% 100% 100% 100% 100% 100% Due to DTE Posted Outage
Belle River   N/A 100% 100% 100% 100% 100% 100% 56% Due to DTE Posted Outage
Ypsilanti   N/A 100% 100% 100% 100% 100% 100% 55% Due to DTE Posted Outage












OFO / Imbalance Notice










OFO ---









Customer Specific OFO No DP - issued 8/20/2026.  2% / 500 Dth/d Tolerance


Imbalances Warnings Stay Balanced





















Gas Quality:










NEXUS has been informed by TETCO of ongoing gas quality issues at meters N4714, N4733, N4915. TE/NEXUS will require a partial reduction of flow beginning as soon as September 9, 2026, if gas quality issues are not corrected by that date. These meter operators will remain at a reduced flow, and will be subject to further reductions, until the gas entering TE's system is compliant with TE's gas quality standards in its GT&C.  The upstream point operators are required to ensure nominations are commensurate with the physical flow, or non-performance confirmation reductions may be required.












Systemwide Notes:










Customers are advised that capacity may become available as the nomination and confirmation process continues throughout the day.













Please contact your Operations Account Representative should you have any questions.