Iroquois Gas Transmission System Notice 6992
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Capacity Constraint
Effective Timely Cycle, Gas
Day November 11, 2025, nominations are sealed from all increases
through the following locations:
-
MLV-14
-
Brookfield Interconnect with Algonquin Gas Transmission.
In addition, the following
capacity has been reduced:
-
MLV-14 – IT and ER/ED nominations forward-haul through mainline valve
14 are reduced by 100% and Secondary Out of Path (SOP) nominations forward-haul
through mainline valve 14 are reduced by 75%.
- Brookfield Interconnect – IT receipt
nominations at the Brookfield Interconnect are reduced by 100% and Secondary
receipt nominations at the Brookfield Interconnect are reduced by 87%.
If you have any further
questions, please contact the Iroquois Scheduling or Gas Control Group.
End date 11/12/2025 09:00 AM CCT
Capacity Constraint
Effective Timely Cycle, Gas
Day November 11, 2025, nominations are sealed from all increases
through the following locations:
-
MLV-14
-
Brookfield Interconnect with Algonquin Gas Transmission.
In addition, the following
capacity has been reduced:
-
MLV-14 – IT and ER/ED nominations forward-haul through mainline valve
14 are reduced by 100% and Secondary Out of Path (SOP) nominations forward-haul
through mainline valve 14 are reduced by 75%.
- Brookfield Interconnect – IT receipt
nominations at the Brookfield Interconnect are reduced by 100% and Secondary
receipt nominations at the Brookfield Interconnect are reduced by 87%.
If you have any further
questions, please contact the Iroquois Scheduling or Gas Control Group.
End date 11/12/2025 09:00 AM CCT