Equitrans Notice 137041

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

01-06-2026 00:00:00

Page 1 of 2

System Wide Notice Detail

TSP Name:

EQUITRANS, L.P.

TSP:

189569585

Post Date/Time:

Tue Jan 06 00:00:00 GMT 2026

Subject:

H-128 and H-129 Pipeline Pigging 02-03-26

Notice Type:

CRITICAL

Notice ID:

137041

Notice Status Desc:

Initiate

Critical Desc:

Critical Notice

Notice Eff Date:

01-06-2026

Notice Eff Time:

00:00:00

Notice End Date:

05-31-2026

Notice End Time:

00:00:00

Required Response Indicator Description:

NO RESPONSE REQUIRED

Notice Text:

Equitrans L.P. will be conducting pipeline pigging on its H-128 and H-129 Pipelines in Mainline Operational Area 2 beginning at 10:00 AM ET on February
03, 2026, and is issuing an OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.

Equitrans L.P is hereby providing notice that due to the high possibility of fluids during this pigging all People’s Natural Gas Delivery/Receipt Meters
between Tepe M&R Station (Coordinates 40.280580/ -79.916810) and Belle Vernon Valve Set (Coordinates 40.110804 / -79.929126) on the H-128 and
H-129 pipelines must be shut in by 10:00 AM ET on February 03, 2026 and remain shut in for the duration of the pigging, which has an estimated duration of
48 hours.

Lastly, in conjunction with this pigging, Operational Capacity at Meter #M5397896 (Redd) will be reduced to 0 Dths for February 03, 2026, and February 04,
2026, Gas Days.

Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. Intraday nomination
changes may be accepted should the actual outage timeframe or level of impact differ from the estimates stated in this notification.

If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.

Estimated duration of outage is 48 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when they
can turn back in-line.

Customers should monitor Equitrans’ Informational Postings website for updates to this notice

01-06-2026 00:00:00

Page 2 of 2

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.


System Wide Notice Detail
TSP Name:
EQUITRANS, L.P.
TSP:
189569585
Post Date/Time:
Tue Jan 06 00:00:00 GMT 2026
Subject:
H-128 and H-129 Pipeline Pigging 02-03-26
Notice Type:
CRITICAL
Notice ID:
137041
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
01-06-2026
Notice Eff Time:
00:00:00
Notice End Date:
05-31-2026
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Equitrans L.P. will be conducting pipeline pigging on its H-128 and H-129 Pipelines in Mainline Operational Area 2 beginning at 10:00 AM ET on February
03, 2026, and is issuing an OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.
Equitrans L.P is hereby providing notice that due to the high possibility of fluids during this pigging all People’s Natural Gas Delivery/Receipt Meters
between Tepe M&R Station (Coordinates 40.280580/ -79.916810) and Belle Vernon Valve Set (Coordinates 40.110804 / -79.929126) on the H-128 and
H-129 pipelines must be shut in by 10:00 AM ET on February 03, 2026 and remain shut in for the duration of the pigging, which has an estimated duration of
48 hours.
Lastly, in conjunction with this pigging, Operational Capacity at Meter #M5397896 (Redd) will be reduced to 0 Dths for February 03, 2026, and February 04,
2026, Gas Days.
Notice Text:
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. Intraday nomination
changes may be accepted should the actual outage timeframe or level of impact differ from the estimates stated in this notification.
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Estimated duration of outage is 48 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when they
can turn back in-line.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice
01-06-2026 00:00:00
Page 1 of 2

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
01-06-2026 00:00:00
Page 2 of 2