Equitrans Notice 136848
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
11-13-2025 15:50:00
Page 1 of 1
System Wide Notice Detail
TSP Name:
EQUITRANS, L.P.
TSP:
189569585
Post Date/Time:
Thu Nov 13 15:50:00 GMT 2025
Subject:
TP-7215 Pipeline Pigging 12-03-25
Notice Type:
OPERATIONAL FLOW ORDER/PLANNED SERVICE OUTAGE
Notice ID:
136848
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
11-13-2025
Notice Eff Time:
15:50:00
Notice End Date:
03-31-2026
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Equitrans L.P. will be performing pipeline pigging on its TP-7215 Pipeline in AVC Operational Area 1 from Radebaugh valve set to Himsel IC beginning at
7:00 AM ET on December 03, 2025, and is issuing an OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.
Equitrans L.P is hereby providing notice that due to the high possibility of fluids during this pigging, all People’s Natural Delivery/Receipt points between the
Radebaugh Valve Set (Coordinates 40.31301 / - 79.58300) and Himsel IC Valve Set (Coordinates 40.39689 / -79.54912)must be shut in on the TP-7215
pipeline by 7:00 AM ET on December 03, 2025, and remain shut in for the duration of the pigging.
In addition, Customer Delivery/Receipt Meter: M5427187 (PA Turnpike Greensburg Maintenance) must be shut in on the TP-7215 pipeline by 7:00 AM ET
on December 03, 2025, and remain shut in for the duration of the pigging.
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice.
Estimated duration of the pigging is 8 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when
they can turn back in-line.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name:
EQUITRANS, L.P.
TSP:
189569585
Post Date/Time:
Thu Nov 13 15:50:00 GMT 2025
Subject:
TP-7215 Pipeline Pigging 12-03-25
Notice Type:
OPERATIONAL FLOW ORDER/PLANNED SERVICE OUTAGE
Notice ID:
136848
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
11-13-2025
Notice Eff Time:
15:50:00
Notice End Date:
03-31-2026
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Equitrans L.P. will be performing pipeline pigging on its TP-7215 Pipeline in AVC Operational Area 1 from Radebaugh valve set to Himsel IC beginning at
7:00 AM ET on December 03, 2025, and is issuing an OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.
Equitrans L.P is hereby providing notice that due to the high possibility of fluids during this pigging, all People’s Natural Delivery/Receipt points between the
Radebaugh Valve Set (Coordinates 40.31301 / - 79.58300) and Himsel IC Valve Set (Coordinates 40.39689 / -79.54912)must be shut in on the TP-7215
pipeline by 7:00 AM ET on December 03, 2025, and remain shut in for the duration of the pigging.
In addition, Customer Delivery/Receipt Meter: M5427187 (PA Turnpike Greensburg Maintenance) must be shut in on the TP-7215 pipeline by 7:00 AM ET
on December 03, 2025, and remain shut in for the duration of the pigging.
Notice Text:
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice.
Estimated duration of the pigging is 8 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when
they can turn back in-line.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
11-13-2025 15:50:00
Page 1 of 1