Equitrans Notice 136846

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

11-13-2025 12:45:00

Page 1 of 1

System Wide Notice Detail

TSP Name:

EQUITRANS, L.P.

TSP:

189569585

Post Date/Time:

Thu Nov 13 12:45:00 GMT 2025

Subject:

H-152 Pipeline ILI Tool Run (Bradford Woods IC to Clever Road IC) 11-18-25

Notice Type:

OPERATIONAL FLOW ORDER/PLANNED SERVICE OUTAGE

Notice ID:

136846

Notice Status Desc:

Initiate

Critical Desc:

Critical Notice

Notice Eff Date:

11-13-2025

Notice Eff Time:

12:45:00

Notice End Date:

02-18-2026

Notice End Time:

00:00:00

Required Response Indicator Description:

NO RESPONSE REQUIRED

Notice Text:

Equitrans L.P. will be conducting an ILI Tool Run on its’ H-152 pipeline in Mainline Operational Area 1 beginning at 7:00 AM ET on November 18, 2025,
and is issuing an OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.

Equitrans L.P is hereby providing notice that due to the high possibility of fluids during the pig run all People’s Natural Gas Delivery/Receipt points between
coordinates Bradford Woods IC (40.632672 / -80.093410) and Clever Road IC (40.467330 / -80.114228) must be shut in on the H-152 Pipeline by 7:00 AM
ET on November 18, 2025, and remain shut in during pigging operations.
Additionally, in conjunction with this pig run, Meters # 11501 (DTI-Mars Crider) and # M5353173 (CPA Spartan IC) must be shut in by 7:00 AM ET on
November 18, 2025, and remain shut in during pigging operations.

If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.

Estimated duration of the pigging is 8 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when
they can turn back in-line.

Customers should monitor Equitrans’ Informational Postings website for updates to this notice.

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.


System Wide Notice Detail
TSP Name:
EQUITRANS, L.P.
TSP:
189569585
Post Date/Time:
Thu Nov 13 12:45:00 GMT 2025
Subject:
H-152 Pipeline ILI Tool Run (Bradford Woods IC to Clever Road IC) 11-18-25
Notice Type:
OPERATIONAL FLOW ORDER/PLANNED SERVICE OUTAGE
Notice ID:
136846
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
11-13-2025
Notice Eff Time:
12:45:00
Notice End Date:
02-18-2026
Notice End Time:
00:00:00
Required Response Indicator Description:
NO RESPONSE REQUIRED
Equitrans L.P. will be conducting an ILI Tool Run on its’ H-152 pipeline in Mainline Operational Area 1 beginning at 7:00 AM ET on November 18, 2025,
and is issuing an OFO in accordance with Section 6.11 of the General Terms and Conditions of its FERC Gas Tariff.
Equitrans L.P is hereby providing notice that due to the high possibility of fluids during the pig run all People’s Natural Gas Delivery/Receipt points between
coordinates Bradford Woods IC (40.632672 / -80.093410) and Clever Road IC (40.467330 / -80.114228) must be shut in on the H-152 Pipeline by 7:00 AM
ET on November 18, 2025, and remain shut in during pigging operations.
Additionally, in conjunction with this pig run, Meters # 11501 (DTI-Mars Crider) and # M5353173 (CPA Spartan IC) must be shut in by 7:00 AM ET on
November 18, 2025, and remain shut in during pigging operations.
Notice Text:
If Customer and/or Customer’s operator fails to comply with the terms of this OFO, such Customer shall be subject to (1) liability for any damages including,
but not limited to, direct, consequential, exemplary, or punitive damages incurred by Equitrans or any other party as a result of such failure, (2) a penalty of
$25 per Dth times the quantity of gas by which the Customer deviated from the requirements of this OFO, (3) flow control, and/or (4) a reduction in
scheduled quantities to match flowing gas. In addition, Equitrans will not permit post-cycle adjustments to avoid an OFO penalty.
Estimated duration of the pigging is 8 hours. Upon completion of the maintenance the OFO will expire and Equitrans L.P. will notify impacted parties when
they can turn back in-line.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
11-13-2025 12:45:00
Page 1 of 1