Eastern Gas Transmission and Storage Notice 1009286
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Page 1
TSP
N
ame / TSP: EASTERN GAS TRANSMISSION AND STORAGE INC (116025180)
C
ritical: Y
P
osting Date/Time: 12/15/2025 08:38 AM
N
otice Stat Desc: Supersede
N
otice Eff Date/Time: 12/15/2025 08:38 AM
N
otice ID: 1009286
P
rior Notice: 1009137
R
eqrd Rsp Desc: No response required
R
esponse Date/Time:
N
otice Type Desc: OFO / Over-Under Performance
S
ubject: OFO – Under Performance
N
otice Text:
E
ective with the
start of Gas Day Monday, December 15, 2025, and continuing until further notice, the following OFO shall be in effect on
the EGTS system:
C
ustomers Affected:
A
ll Rate Schedule FT, FTNN, IT, MCS, TTT, and GSS Customers, including Replacement Customers under Capacity Release transactions.
B
asis for OFO:
GT
&C S
ection 11.B.4.A. Balancing Transportation Service.
D
uring cold weather events, receipt points on EGTS’ system may experience operational issues that could result in a failure to flow scheduled
quantities. EGTS will not allow under performance at any receipt point that EGTS reasonably concludes may affect system integrity, the
operations of the EGTS system or its ability to meet firm service obligations to customers that are not underperforming.
C
ustomer Action Required:
E
ach affected Customer is expected to take whatever action it may deem appropriate, including, without limitation, timely notification of its
upstream suppliers or downstream markets to comply with this OFO. Receipt Point Operators will be required to maintain physical flow rates
equal to or greater than their scheduled quantities. Failure to maintain rate will result in cuts to scheduled nominations at the Receipt Point
O
perator’s meter location, and absent alternatives such as no-notice storage service entitlements, will result in cuts to scheduled nominations
at corresponding Delivery Points.
R
eceipt Point Operators are encouraged to contact EGTS directly if the Receipt Point Operator anticipates or is experiencing problems in real
time. To the extent possible, Receipt Point Operators will be given notice of a non-performance event prior to EGTS issuance of cuts. After a
reasonable amount of time to cure the Receipt Point Operator’s non-performance, EGTS will issue cuts.
A
dditionally, in order to ensure TTT services do not interfere with Pipeline’s ability to protect the integrity of its system and performance of its
fi
rm service obligations to its customers, EGTS cannot tolerate insufficient supplies in its Title Transfer Tracking Pools (TPools) at Eastern Gas,
S
outh (EGTSP) and Eastern Gas, North (EGTNP). In order to ensure TTT services do not interfere with the Pipeline's performance of its firm
transportation service obligations to its customers, EGTS
will reduce market nominations to balance Title Transfer Tracking pools with
insufficient supply (i.e. short) starting in the Evening cycle for Gas Day Tuesday, December 16, 2025, and continuing until further
notice.
T
itle Transfer Tracking (TTT) Pool Customers are required to equalize receipts and deliveries to eliminate TTT pool daily imbalances on EGTS's
system. The nomination of all services related to Title Transfer Tracking and its balancing are the responsibility of the customer.
T
itle Transfer Tracking (TTT) Pool Customers are reminded that pool activity can be monitored and ranked in Dekaflow’s Confirmation – TPool
screen.
I
f market nomination reductions are necessary, EGTS will use customer provided rankings to the extent available, and if not, pursuant to
S
ection 7.6, Tariff Record 20.40, of the TTT Rate Schedule of EGTS’s FERC Gas Tariff, the Pipeline will unilaterally determine the allocation.
C
onsequences of noncompliance: Failure to comply may result in the issuance of additional OFOs, penalties, service reductions, liability for
damages, in accordance with EGTS’ FERC Gas Tariff.
D
irect any inquiries to your Marketing Manager.
Critical: Y
Posting Date/Time: 12/15/2025 08:38 AM
Notice Stat Desc: Supersede
Notice Eff Date/Time: 12/15/2025 08:38 AM
Notice ID: 1009286
Prior Notice: 1009137
Reqrd Rsp Desc: No response required
Response Date/Time:
Notice Type Desc: OFO / Over-Under Performance
Subject: OFO – Under Performance
Notice Text:
Effective with the start of Gas Day Monday, December 15, 2025, and continuing until further notice, the following OFO shall be in effect on
the EGTS system:
Customers Affected:
All Rate Schedule FT, FTNN, IT, MCS, TTT, and GSS Customers, including Replacement Customers under Capacity Release transactions.
Basis for OFO:
GT&C Section 11.B.4.A. Balancing Transportation Service.
During cold weather events, receipt points on EGTS’ system may experience operational issues that could result in a failure to flow scheduled
quantities. EGTS will not allow under performance at any receipt point that EGTS reasonably concludes may affect system integrity, the
operations of the EGTS system or its ability to meet firm service obligations to customers that are not underperforming.
Customer Action Required:
Each affected Customer is expected to take whatever action it may deem appropriate, including, without limitation, timely notification of its
upstream suppliers or downstream markets to comply with this OFO. Receipt Point Operators will be required to maintain physical flow rates
equal to or greater than their scheduled quantities. Failure to maintain rate will result in cuts to scheduled nominations at the Receipt Point
Operator’s meter location, and absent alternatives such as no-notice storage service entitlements, will result in cuts to scheduled nominations
at corresponding Delivery Points.
Receipt Point Operators are encouraged to contact EGTS directly if the Receipt Point Operator anticipates or is experiencing problems in real
time. To the extent possible, Receipt Point Operators will be given notice of a non-performance event prior to EGTS issuance of cuts. After a
reasonable amount of time to cure the Receipt Point Operator’s non-performance, EGTS will issue cuts.
Additionally, in order to ensure TTT services do not interfere with Pipeline’s ability to protect the integrity of its system and performance of its
firm service obligations to its customers, EGTS cannot tolerate insufficient supplies in its Title Transfer Tracking Pools (TPools) at Eastern Gas,
South (EGTSP) and Eastern Gas, North (EGTNP). In order to ensure TTT services do not interfere with the Pipeline's performance of its firm
transportation service obligations to its customers, EGTS will reduce market nominations to balance Title Transfer Tracking pools with
insufficient supply (i.e. short) starting in the Evening cycle for Gas Day Tuesday, December 16, 2025, and continuing until further
notice.
Title Transfer Tracking (TTT) Pool Customers are required to equalize receipts and deliveries to eliminate TTT pool daily imbalances on EGTS's
system. The nomination of all services related to Title Transfer Tracking and its balancing are the responsibility of the customer.
Title Transfer Tracking (TTT) Pool Customers are reminded that pool activity can be monitored and ranked in Dekaflow’s Confirmation – TPool
screen.
If market nomination reductions are necessary, EGTS will use customer provided rankings to the extent available, and if not, pursuant to
Section 7.6, Tariff Record 20.40, of the TTT Rate Schedule of EGTS’s FERC Gas Tariff, the Pipeline will unilaterally determine the allocation.
Consequences of noncompliance: Failure to comply may result in the issuance of additional OFOs, penalties, service reductions, liability for
damages, in accordance with EGTS’ FERC Gas Tariff.
Direct any inquiries to your Marketing Manager.
Page 1