TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 04/29/2026
Notice Eff Time: 14:34:00 CDT
Notice End Date:
Notice End Time:
Notice ID: 16815505
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 04/29/2026
Post Time: 14:34:00 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 80-100 MLD Tool Runs (Job 1211799) 2026 Planned Outage and Maintenance Summary

Transco will be performing pipeline integrity assessments on Mainline D between Station 80 and Station 100 associated with Job#1211799 on its 2026 Planned Outage and Maintenance Summary. Operating Conditions resulting from this work may require Transco to restrict scheduled quantities for transportation priorities moving south to north through the location indicated below. Based on historical scheduled quantities, Transco does not anticipate impacts to primary firm services, and impacts to non-primary firm services are expected to be minimal. However, unforeseen issues including, but not limited to nominations, weather, or other factors impacting system operating conditions may result in more significant scheduling reductions than expected.

 

Pig Runs

Dates

Gauge/Cleaner Tool

June 9

MFL Tool

June 11

 

 

The location Throughput Section Boundary (“TSB”) listed below will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSB and the available quantity of all transportation priorities during the indicated period.

 

TSB Name - Location

Location ID

Flow Direction

Sta 84 MP 784.01 S to N

9012383

South to North

 

 

Estimated Outage

Location ID

Design Capacity (Dt/d)

Total Quantity

Available (Dt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*

June 9 & 11

9012383

4,131,111

3,200,000

77%

0%

 

*% Cuts (Primary) is an estimate of the impact to primary firm shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity. 

 

 