Transco Pipeline Notice 16815505
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| Critical: | Y |
| Notice Eff Date: | 04/29/2026 |
| Notice Eff Time: | 14:34:00 CDT |
| Notice End Date: | |
| Notice End Time: | |
| Notice ID: | 16815505 |
| Notice Stat Desc: | Initiate |
| Notice Type Desc: | Maint |
| Post Date: | 04/29/2026 |
| Post Time: | 14:34:00 CDT |
| Prior Notice: | 0 |
| Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
| Rsp Date: | |
| Rsp Time: | |
| TSP: | 007933021 |
| TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Station 80-100 MLD Tool Runs (Job 1211799) 2026 Planned Outage and Maintenance Summary
Transco will be performing pipeline integrity assessments on Mainline D between Station 80 and Station 100 associated with Job#1211799 on its 2026 Planned Outage and Maintenance Summary. Operating Conditions resulting from this work may require Transco to restrict scheduled quantities for transportation priorities moving south to north through the location indicated below. Based on historical scheduled quantities, Transco does not anticipate impacts to primary firm services, and impacts to non-primary firm services are expected to be minimal. However, unforeseen issues including, but not limited to nominations, weather, or other factors impacting system operating conditions may result in more significant scheduling reductions than expected.
|
Pig Runs |
Dates |
|
Gauge/Cleaner Tool |
June 9 |
|
MFL Tool |
June 11 |
The location Throughput Section Boundary (“TSB”) listed below will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSB and the available quantity of all transportation priorities during the indicated period.
|
TSB Name - Location |
Location ID |
Flow Direction |
|
Sta 84 MP 784.01 S to N |
9012383 |
South to North |
|
Estimated Outage |
Location ID |
Design Capacity (Dt/d) |
Total Quantity Available (Dt/d) |
% Available Total Primary-Firm vs Design Capacity |
% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)* |
|
June 9 & 11 |
9012383 |
4,131,111 |
3,200,000 |
77% |
0% |
*% Cuts (Primary) is an estimate of the impact to primary firm shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.