Transco Pipeline Notice 16316463

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 12/05/2025
Notice Eff Time: 11:45:12 CST
Notice End Date:
Notice End Time:
Notice ID: 16316463
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 12/05/2025
Post Time: 11:45:12 CST
Prior Notice: 16308798
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update - Unplanned Maintenance Station 60 Outage 2025

Progress has been made with the integrity assessments between the 60B10 and 65B0 valves. It is currently projected that all work will be completed by Tuesday, December 9, 2025. Effective Timely, December 9, 2025, Transco will lift the below constraint through the TSB and location restriction and they will return to the previously posted available capacities prior to this outage.

Please see the Market and Constraint posting on Transco’s Informational Postings site for available priority capacities.

Estimated Outage

Design Capacity (Mdt/d)

Total Qty Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization)   

December 3 – December 8

2,133

1,300

64%

15-33%

 

 

Previously posted information:

Due to findings from the integrity assessment associated with Job #1071388 performed on Mainline B between Stations 60 & 65 in July 2025. Transco must immediately isolate and reduce pressure on a portion of Transco’s mainline B between the 60B10 and 65B0 valves (MP 602.90 - MP 626.51). This work will impact the availability of transportation services moving south to north between those valve settings. Transco must begin work effective immediately to address these findings. The below constraint will be effective ID1, December 3rd, 2025. The duration of this outage is anticipated to be between 7-10 days. An updated posting with the completion date will be provided as soon as possible. Transco is taking all necessary measures to ensure this work is completed as quickly as possible.

Operating Conditions resulting from this work will require Transco to restrict scheduled quantities for all transportation priorities moving south to north through the location indicated below.

The receipt-based Throughput Section Boundary (TSB) at mainline MP 588.62 (Station 60) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.

TSB Name Location

Location ID

Flow Direction

Compressor Station 60 MP 588.62

9000000

South to North

 

 

Estimated Outage

Design Capacity (Mdt/d)

Total Qty Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization)   

December 3 – TBD

2,133

1,300

64%

15-33%

 

 

During this unplanned maintenance, the following location will not be available for scheduling and flow:

Location ID

Location Name

Flow Direction

1006831

CLINTON MIDLA M4399

Delivery

 

If you have any questions, please contact your Transportation Services Representative.