TransCanada Canadian Mainline Notice 3374724948

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Notice Type
Maintenance

Effective Start Date Time
09/11/2026 5:00 am

Subject
TC Energy Planned Maintenance Sept 11-Sept 21, 2026

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning September 11, 2026.            
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
  September 115025343024252485990
  September 1250253430242524851045
  September 1350253430242524851045
  September 1450253430242524851045
  September 1550253430238524851045
  September 1650253430238524851045
  September 1750253430238524851045
  September 1850253430238524851045
  September 1950503430238524851045
  September 2050503430238524851045
  September 2149803430238524851045
     

Forecast system capabilities converted to energy at 38.5 MJ/m3.
  Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
  Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.
  The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

  1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
  2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
  3Northern Ontario Line represents the flow east from Station 41.
  4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
  5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions. If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.            

Notice Type
Maintenance

Effective Start Date Time
09/11/2026 5:00 am

Subject
TC Energy Planned Maintenance Sept 11-Sept 21, 2026

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning September 11, 2026.            
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
  September 115025343024252485990
  September 1250253430242524851045
  September 1350253430242524851045
  September 1450253430242524851045
  September 1550253430238524851045
  September 1650253430238524851045
  September 1750253430238524851045
  September 1850253430238524851045
  September 1950503430238524851045
  September 2050503430238524851045
  September 2149803430238524851045
     

Forecast system capabilities converted to energy at 38.5 MJ/m3.
  Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
  Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.
  The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

  1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
  2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
  3Northern Ontario Line represents the flow east from Station 41.
  4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
  5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions. If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.