TransCanada Canadian Mainline Notice 3374724800

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Notice Type
Maintenance

Effective Start Date Time
06/27/2026 5:00 am

Subject
UPDATED: TC Energy Planned Maintenance June 27-July 6, 2026

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning June 27, 2026.
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
June 274830346025302445855
June 284830346025302445855
June 294830346025302445855
June 304830346025302445855
July 14770343024902395850
July 24770343024902395850
July 34770343024902395850
July 44770343024902395850
July 54770343024902395850
July 64705343024902365850
 

Forecast system capabilities converted to energy at 38.5 MJ/m3.
Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.
The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
3Northern Ontario Line represents the flow east from Station 41.
4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions. If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.

Notice Type
Maintenance

Effective Start Date Time
06/27/2026 5:00 am

Subject
UPDATED: TC Energy Planned Maintenance June 27-July 6, 2026

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning June 27, 2026.
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
June 274830346025302445855
June 284830346025302445855
June 294830346025302445855
June 304830346025302445855
July 14770343024902395850
July 24770343024902395850
July 34770343024902395850
July 44770343024902395850
July 54770343024902395850
July 64705343024902365850
 

Forecast system capabilities converted to energy at 38.5 MJ/m3.
Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.
The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
3Northern Ontario Line represents the flow east from Station 41.
4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions. If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.