TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
06/05/2026
01:18:14 PM
09/03/2026
01:18:14 PM
178786
Initiate
Capacity Constraint
06/05/2026
01:18:14 PM


No response required


TE Meter Underperformance


Notice Text:

Texas Eastern Transmission's (TE) system has limited ability to absorb due pipeline imbalances from receipt and/or delivery point operators. TE is requiring the following meter operator to perform to scheduled quantities or confirmation restrictions will be made commensurate with anticipated physical deliveries:

 

 

Loc

Loc Name

County

Loc St

Zone

74528

DTM LEAP CAMERON EXTENSION AL CORMIER ROAD BEAUREGARD PARISH LA

Beauregard

LA

79503

 

If action is not taken by Intraday Cycle 2 by the meter operator, reductions of scheduled volumes may be required.

 

TE will continue to monitor performance for future gas days.

 

Please contact your Operations Account Representative should you have any questions.

 



TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
06/05/2026
01:18:14 PM
09/03/2026
01:18:14 PM
178786
Initiate
Capacity Constraint
06/05/2026
01:18:14 PM


No response required


TE Meter Underperformance


Notice Text:

Texas Eastern Transmission's (TE) system has limited ability to absorb due pipeline imbalances from receipt and/or delivery point operators. TE is requiring the following meter operator to perform to scheduled quantities or confirmation restrictions will be made commensurate with anticipated physical deliveries:

 

 

Loc

Loc Name

County

Loc St

Zone

74528

DTM LEAP CAMERON EXTENSION AL CORMIER ROAD BEAUREGARD PARISH LA

Beauregard

LA

79503

 

If action is not taken by Intraday Cycle 2 by the meter operator, reductions of scheduled volumes may be required.

 

TE will continue to monitor performance for future gas days.

 