Tennessee Gas Pipeline Notice 400068

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  03/19/2026 3:01:12PM Notice End Date/Time:  03/20/2026 9:00:00am
Post Date/Time:  3/19/2026 3:01:12 PM Notice ID: 400068
Reqrd Rsp:  1 Rsp Date:  03/19/2026
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

 

TGP - Outage Impact Report

 

 

 

-Major impact restrictions may be necessary

 

 

Seven Day Forecast (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(3/23)

Tuesday

(3/24)

Wednesday

(3/25)

Thursday

(3/26)

Friday

(3/27)

Saturday

(3/28)

Sunday

(3/29)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409

(Donna Line) (segment 490 FH)

 

585

 

585

 

585

 

585

 

585

 

585

 

585

 

585

 

Station 1

(segment 101 BH)

 

438

 

438

 

438

 

438

 

438

 

438

 

438

 

438

 

Station 9

(segment 109 FH)

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

Station 25

(segment 125 FH)

 

1,101

1090

(11)

1090

(11)

1090

(11)

1090

(11)

1090

(11)

 

1,101

 

1,101

MLV 24-1BR1 TO MLV 24-1A: Anomaly Remediation (3/23/2026 - 3/27/2026)

Station 32 South

(segment 132 FH)

 

1,297

 

1180

(117)

 

1180

(117)

 

1180

(117)

 

1180

(117)

 

1180

(117)

 

1,297

 

1,297

MLV 32-1D to MLV 33-1: Anomaly Remediation (3/16/2026 - 3/27/2026) MLV 33-3D to MLV 34-3S: Anomaly Remediation (3/23/2026 - 3/27/2026)

Station 40 KN South (segment 501

FH)

 

285

 

285

 

170

(115)

 

285

 

285

 

285

 

285

 

285

Sta 500-1 to Sta 823 (MLV 507-1): Pig Run - Maintenance (M) (3/24/2026)

Station 40 North

(segment 140 FH)

 

1,348

1330

(18)

1330

(18)

1330

(18)

1330

(18)

1330

(18)

1330

(18)

1330

(18)

MLV 41-2 to MLV 41-2A: Anomaly Remediation (3/23/2026 - 4/10/2026)

Station 47

(segment 143 FH)

 

1,354

 

1095

(259)

 

1095

(259)

 

1240

(114)

 

1291

(63)

 

1291

(63)

 

1291

(63)

 

1291

(63)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 3/25/2026)

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta. 47: Unit 1D/2D - D Building - Unit Valve Install (3/23/2026 - 3/24/2026) Sta. 47: Unit 1E - E Building - Unit Valve Install (3/25/2026)

Station 63

(segment 163 FH)

 

1,287

1162

(125)

1162

(125)

1162

(125)

1162

(125)

1162

(125)

1162

(125)

1162

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)

Station 823

(segment 823 BH)

 

759

725

(34)

725

(34)

725

(34)

725

(34)

725

(34)

725

(34)

725

(34)

Sta 823: Unit 11A - Jacket Water Pump (1/6/2026 - 4/9/2026)

Station 834

(segment 834 BH)

 

733

720

(13)

720

(13)

720

(13)

720

(13)

720

(13)

720

(13)

720

(13)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/3/2026)

Station 523

(segment 523 FH)

 

442

 

442

 

442

 

442

340

(102)

340

(102)

 

442

 

442

Sta 523: Unit 2B - 4k Maintenance (3/26/2026 - 3/27/2026)

 

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,632

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026) Sta 530: Unit 2A - Bearings (8/26/2025 - 3/31/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 530: Unit 6A - Bearings (10/6/2025 - 3/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/4/2026)

Sta 534: Unit 7A - Piston / Liner (5/20/2025 - 3/27/2026)

MLV 548

(segment 542 BH)

 

1,771

1705

(66)

1705

(66)

1705

(66)

1705

(66)

1705

(66)

1705

(66)

1705

(66)

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 4/17/2026) Sta 546: Unit 3A - Engine Maintenance (1/22/2026 - 3/31/2026)

Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 3/27/2026)

Station 860

(segment 548 BH)

 

1,697

1680

(17)

1680

(17)

1680

(17)

1680

(17)

1680

(17)

1680

(17)

1680

(17)

Sta 550: Unit 3A - Turbocharger Exchange (3/16/2026 - 4/3/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 5/22/2026)

Station 860 North (Segment 860

BH)

 

2,028

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

2,775

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 106: Unit 1C - Replace Power Cylinder Bearing #9 (11/24/2025 - 3/30/2026)

Sta 87: Unit 2E Overhaul (2/20/2026 - 4/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)

Sta 96: Unit 1D - Compressor Valves (3/16/2026 - 4/3/2026)

Station 114

(segment 114 BH)

 

948

 

948

 

948

 

948

 

948

 

948

 

948

 

948

 

Station 204

(Segment 204 BH)

 

1,895

1650

(245)

1650

(245)

1650

(245)

1650

(245)

1650

(245)

1650

(245)

1650

(245)

Sta 214: Annual ESD Test & Maintenance (3/23/2026 - 4/17/2026)

Station 245

(segment 245 FH)

 

1,053

1035

(18)

1035

(18)

1035

(18)

1035

(18)

1035

(18)

1035

(18)

1035

(18)

Sta 245: Unit 1A & 2A - Automation Upgrade (3/23/2026 - 4/17/2026)

Station 254

(segment 256 FH)

 

1,271

1269

(2)

1269

(2)

1269

(2)

1269

(2)

1269

(2)

1151

(120)

1151

(120)

MLV 257-1 to MLV 258-1: Anomaly Remediation (3/23/2026 - 3/27/2026) MLV 258-1 to MLV 259-1: Anomaly Remediation (3/28/2026 - 4/6/2026)

Station 261 Discharge East (segment 261

FH)

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

Station 307

(segment 307 BH)

 

1,202

1075

(127)

1075

(127)

1075

(127)

1075

(127)

1075

(127)

 

1,202

 

1,202

Sta 307: Units 1A to 4A - Replace JW Pipe (2/9/2026 - 3/27/2026)

Station 315

(segment 315 BH)

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

MLV 324

(segment 324 FH)

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

Station 405 HC Line (segment 299

FH)

 

817

 

817

 

817

 

817

 

817

 

817

 

817

 

817

 


 

 

 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

 

TGP - Outage Impact Report

 

 

 

-Major impact restrictions may be necessary

 

 

Seven Day Forecast (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(3/23)

Tuesday

(3/24)

Wednesday

(3/25)

Thursday

(3/26)

Friday

(3/27)

Saturday

(3/28)

Sunday

(3/29)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

TGP - Outage Impact Report

 

 

-Major impact restrictions may be necessary

 

 

April 2026 (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(3/30 - 4/5)

Week 2

(4/6 - 4/12)

Week 3

(4/13 - 4/19)

Week 4

(4/20 - 4/26)

Week 5

(4/27 - 5/3)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

564

 

564

 

564

 

564

 

564

 

564

 

Station 1

(segment 101 BH)

 

399

 

399

 

399

 

399

 

399

 

399

 

Station 9

(segment 109 FH)

 

969

 

969

 

969

900

(69)

 

969

 

969

MLV 9-3D to MLV 11-3: Pig Run - Cleaning (4/13/2026)

MLV 9-3D to MLV 11-3: Pig Run - Gauge (4/14/2026) MLV 9-3D to MLV 11-3: Pig Run - MFL-A (4/15/2026)

Station 17

(segment 117 FH)

 

1,122

 

1,122

1104

(18)

1104

(18)

1104

(18)

1104

(18)

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/7/2026 - 5/26/2026)

Station 25

(segment 125 FH)

 

1,078

 

1,078

 

1055

(23)

 

1055

(23)

 

930

(148)

 

930

(148)

MLV 26-1 Relocation: Highway 59 Widening (4/6/2026 - 4/23/2026) MLV 26-2 Relocation: Highway 59 Widening (4/24/2026 - 5/12/2026) MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter

(4/24/2026 - 5/4/2026)

Station 32 South

(segment 132 FH)

 

1,275

 

1,275

 

1207

(68)

 

1207

(68)

 

1,275

 

1,275

MLV 31-2 to MLV 32-2S: Anomaly Remediation (4/6/2026 - 4/17/2026)

Station 40 North

(segment 140 FH)

 

1,342

1330

(12)

1330

(12)

 

1,342

 

1,342

 

1,342

MLV 41-2 to MLV 41-2A: Anomaly Remediation (3/23/2026 - 4/10/2026)

 

Station 47

(segment 143 FH)

 

 

1,343

 

 

1280

(63)

 

 

1020

(323)

 

 

1020

(323)

 

 

1280

(63)

 

 

1,343

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta 47: Unit 1C thru 6C - Installing Unloaders (4/6/2026 - 4/17/2026) Sta 47: Unit 1E - Annual Turbine Maintenance (4/13/2026 - 4/16/2026)

Sta. 47: Scrubber/Filter/Separator Cleaning/Inspection/Changeout (4/6/2026 - 4/10/2026)

Sta. 47: Unit 1D - 16K hour Overhaul (4/6/2026 - 4/17/2026)

 

Station 63

(segment 163 FH)

 

 

1,242

 

1117

(125)

 

1117

(125)

 

901

(341)

 

901

(341)

 

1117

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-3L to MLV 80-3: Anomaly Remediation (4/6/2026 - 6/5/2026)

MLV 79-4 to MLV 71-4D: Pig Runs - Cleaning / Gauge 4/14/26 (4/14/2026) MLV 79-4 to MLV 71-4D: Pig Runs - EMAT 4/23/26 (4/23/2026)

Station 823

(segment 823 BH)

 

734

665

(69)

665

(69)

 

734

 

734

 

734

Sta 823: Unit 11A - Jacket Water Pump (1/6/2026 - 4/9/2026)

Station 834

(segment 834 BH)

 

683

670

(13)

 

683

 

683

 

683

 

683

Sta 834: Unit 1A - Turbocharger (3/30/2026 - 4/3/2026)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/3/2026)

Station 847

(segment 847 FH)

 

626

 

626

 

626

 

626

 

626

490

(136)

MLV 847-1 to MLV 851-1: Pig Runs - Cal / IMU & MFL-A 4/30/26 (4/30/2026)

MLV 847-1 to MLV 851-1: Pig Runs - Cleaning / Gauge 4/28/26 (4/28/2026)

Station 823 Muskrat Line (segment 509

BH)

 

231

 

123

(108)

 

231

 

231

 

231

 

231

Sta 823 to MLV 516: Pig Run - Maintenance (M) (3/30/2026 - 3/31/2026)

MLV 516

Muskrat Line (segment 516 FH)

 

241

 

100

(141)

 

241

 

100

(141)

 

100

(141)

 

241

MLV 516 to Sta 523: Pig Run - Cleaning / Gauge (M) (4/1/2026) MLV 516 to Sta 523: Pig Run - Cleaning / Gauge 4/18/26 to 4/23/26 (M)

(4/18/2026 - 4/23/2026)

MLV 516 to Sta 523: Pig Run - MFL-A 4/24/26 (M) (4/24/2026)

Station 527

(segment 527 BH)

 

2,395

 

2,395

2200

(195)

 

2,395

 

2,395

 

2,395

Sta 529: Annual ESD & 4k Inspection (4/6/2026 - 4/10/2026)

 

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,550

 

 

 

1318

(232)

 

 

 

1528

(22)

 

 

 

1390

(160)

 

 

 

1528

(22)

 

 

 

1528

(22)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 1B - Engine Maintenance (4/13/2026 - 4/17/2026) Sta 530: Unit 2A - Bearings (8/26/2025 - 3/31/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 530: Unit 6A - Bearings (10/6/2025 - 3/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/4/2026)

MLV 548

(segment 542 BH)

 

1,647

1581

(66)

1630

(17)

1630

(17)

1375

(272)

 

1,647

Sta 538 Heidelberg: Station ESD Test (4/21/2026)

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 4/17/2026) Sta 546: Unit 3A - Engine Maintenance (1/22/2026 - 3/31/2026)

 

 

 

Station 860

(segment 548 BH)

 

 

 

 

1,593

 

 

 

 

1576

(17)

 

 

 

 

1580

(13)

 

 

 

 

1475

(118)

 

 

 

 

1430

(163)

 

 

 

 

1390

(203)

MLV 554-2R to MLV 554-2: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 555-1L to MLV 558-1R: Anomaly Remediation (4/13/2026 - 4/17/2026) Sta 550: Unit 3A - Turbocharger Exchange (3/16/2026 - 4/3/2026)

Sta 555 Collinwood: Annual ESD Test & Maintenance (4/21/2026 - 4/24/2026) Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (4/21/2026 - 4/24/2026)

Sta 555: Unit 1B - Protective Device Inspection (4/28/2026 - 4/29/2026) Sta 555: Unit 1B - Replace Recycle Valve Seal (4/28/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 5/22/2026)


 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

TGP - Outage Impact Report

 

 

-Major impact restrictions may be necessary

 

 

April 2026 (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(3/30 - 4/5)

Week 2

(4/6 - 4/12)

Week 3

(4/13 - 4/19)

Week 4

(4/20 - 4/26)

Week 5

(4/27 - 5/3)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

 

 

Station 860 North (Segment 860 BH)

 

 

 

 

 

 

1,874

 

 

 

 

 

1846

(28)

 

 

 

 

 

1846

(28)

 

 

 

 

 

1846

(28)

 

 

 

 

 

1535

(339)

 

 

 

 

 

1530

(344)

MLV 562-2 to MLV 563-2: Anomaly Remediation (4/13/2026 - 4/25/2026)

MLV 564-2R to MLV 564-2: Anomaly Remediation (4/6/2026 - 4/11/2026) Sta 563 Joelton: Annual ESD Test (4/29/2026)

Sta 563 Joelton: Unit 1A - Lube Oil Varnish System Installation (4/29/2026 - 5/1/2026)

Sta 563 Joelton: Unit 2A - Lube Oil Varnish System Installation (4/27/2026 - 4/29/2026)

Sta 563 Joelton: Unit 2A - Solar Turbine Exchange (4/20/2026 - 4/29/2026) Sta 860: Unit 2C - 4K/Turbine Waterwash/Boroscope (4/9/2026 - 4/10/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026) Sta 860: Unit 1C - 4K/Turbine Waterwash/Boroscope (4/7/2026 - 4/8/2026)

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

2,685

 

 

 

 

 

 

2177

(508)

 

 

 

 

 

 

1910

(775)

 

 

 

 

 

 

2270

(415)

 

 

 

 

 

 

2270

(415)

 

 

 

 

 

 

2392

(293)

MLV 106-2 to MLV 110-2: Pig Run - Cal / IMU (4/2/2026)

MLV 106-2 to MLV 110-2: Pig Run - Cleaning / Gauge (3/31/2026) MLV 106-2 to MLV 110-2: Pig Run - MFL-A (4/7/2026)

MLV 109-3: Crossover to Ln 4 Valve Replacements (3/30/2026 - 4/6/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (4/7/2026 - 4/20/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #9 (11/24/2025 - 3/30/2026) Sta 106: Unit 1D - 8K Solar Turbine Inspection (4/6/2026 - 4/10/2026)

Sta 87: Unit 2E Overhaul (2/20/2026 - 4/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)

Sta 875: Unit 1A- 8K Solar Turbine Inspection (4/6/2026 - 4/10/2026) Sta 96: Unit 1D - Compressor Valves (3/16/2026 - 4/3/2026)

Station 114

(segment 114 BH)

 

907

848

(59)

 

907

771

(136)

771

(136)

771

(136)

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026) Sta 118A: Solar Turbine Inspection (3/30/2026 - 4/1/2026)

 

 

 

 

Station 204

(Segment 204 BH)

 

 

 

 

 

1,828

 

 

 

 

1575

(253)

 

 

 

 

1575

(253)

 

 

 

 

1545

(283)

 

 

 

 

1460

(368)

 

 

 

 

1530

(298)

MLV 204-3 to MLV 209-3: Pig Run - Cal/IMU (4/16/2026) MLV 204-3 to MLV 209-3: Pig Run - EMAT (4/23/2026)

MLV 204-3 to MLV 209-3: Pig Run - Gauge/Cleaning (4/14/2026) MLV 204-3 to MLV 209-3: Pig Run - MFL-C (4/21/2026)

MLV 213-1A to MLV 213-1BR: SPECIAL PERMIT REPLACEMENT TGP 213-1

(M) (4/1/2026 - 5/22/2026)

MLV 214-2 to MLV 219-2: Pig Run - Cal/IMU (M) (4/30/2026)

MLV 214-2 to MLV 219-2: Pig Run - Gauge/Cleaning (M) (4/28/2026)

Sta 209 Cambridge: Annual ESD Test & Maintenance (4/20/2026 - 5/1/2026) Sta 214: Annual ESD Test & Maintenance (3/23/2026 - 4/17/2026)

Station 233

(segment 233 FH)

 

459

83

(376)

100

(359)

 

459

 

459

 

459

MLV 230-1 to MLV 237-1: Pig Run - CAL/IMU/MFL-C (M) (4/1/2026) MLV 230-1 to MLV 237-1: Pig Run - EMAT (M) (4/6/2026)

MLV 230-1 to MLV 237-1: Pig Run - Gauge/Cleaning (M) (3/30/2026)

Station 245

(segment 245 FH)

 

986

 

968

(18)

 

970

(16)

 

970

(16)

 

986

 

650

(336)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 245: Unit 1A & 2A - Automation Upgrade (3/23/2026 - 4/17/2026)

Sta 249: Unit 1A - Crankcase Inspection (4/27/2026 - 5/1/2026)

MLV 256 West

(segment 249 FH)

 

1,203

 

1,203

 

1,203

 

1,203

 

1,203

535

(668)

MLV 249-2 to MLV 254-2: Cal/IMU (4/29/2026)

MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (4/28/2026) MLV 249-2 to MLV 254-2: MFL-C (4/30/2026)

 

Station 254

(segment 256 FH)

 

 

1,203

 

 

1050

(153)

 

 

1005

(198)

 

 

1040

(163)

 

 

1,203

 

 

1,203

MLV 254-3 to MLV 258-3A: Pig Runs - Cal/IMU/MFL-A Combo - 4/14/26 (4/14/2026)

MLV 254-3 to MLV 258-3A: Pig Runs - Gauge/Cleaning tool - 4/13/26 (4/13/2026)

MLV 258-1 to MLV 259-1: Anomaly Remediation (3/28/2026 - 4/6/2026)

MLV 259-1 to MLV 260-1: Anomaly Remediation (4/7/2026 - 4/11/2026)

Station 261 Discharge East (segment 261

FH)

 

888

 

888

 

888

 

888

 

888

 

888

 

Station 307

(segment 307 BH)

 

1,153

 

1,153

 

1,153

 

1,153

 

1,153

 

1,153

 

Station 315

(segment 315 BH)

 

1,823

 

1,823

 

1,823

 

1,823

 

1,823

 

1,823

 

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

 

MLV 336 East

(segment 336 FH)

 

 

153

 

 

153

 

 

140

(13)

 

 

140

(13)

 

 

145

(8)

 

 

145

(8)

MLV 336-1 to MLV 337-1: Anomaly Remediation (4/6/2026 - 4/10/2026) MLV 337-1 to MLV 338-1: Anomaly Remediation (4/11/2026 - 4/15/2026) MLV 338-1 to MLV 339-1: Anomaly Remediation (4/16/2026 - 4/20/2026) MLV 339-1 to MLV 340-1: Anomaly Remediation (4/21/2026 - 4/25/2026) MLV 340-1 to MLV 341-1: Anomaly Remediation (4/26/2026 - 4/30/2026)

MLV 341-1 to MLV 342-1: Anomaly Remediation (5/1/2026 - 5/5/2026)

Station 405 HC Line (segment 299

FH)

 

794

 

794

 

680

(114)

 

794

 

794

 

794

Sta 313 to Sta 237: Pig Run - Cleaning Run (HC Line) (4/7/2026) ; Sta 405A: Unit Water Wash (4/7/2026)


 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

TGP - Outage Impact Report

 

 

-Major impact restrictions may be necessary

 

 

April 2026 (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(3/30 - 4/5)

Week 2

(4/6 - 4/12)

Week 3

(4/13 - 4/19)

Week 4

(4/20 - 4/26)

Week 5

(4/27 - 5/3)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 224

(segment 224 FH)

 

388

 

388

200

(188)

 

388

 

388

 

388

MLV 229-2 to MLV 232-2: Pig runs - Maintenance (M) (4/8/2026 - 4/9/2026)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

May 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(5/4 - 5/10)

Week 2

(5/11 - 5/17)

Week 3

(5/18 - 5/24)

Week 4

(5/25 - 5/31)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409A (Alamo) (segment 492

FH)

 

274

 

274

 

274

 

90

(184)

 

274

Sta. 409A Alamo: Annual ESD Test (5/19/2026)

Station 409 (Donna Line) (segment 490

FH)

 

564

 

325

(239)

 

564

 

564

 

564

Sta 409: Annual ESD Test & Maintenance (5/5/2026 - 5/7/2026)

Station 1

(segment 101 BH)

 

399

 

399

 

399

 

399

 

399

 

Station 9

(segment 109 FH)

 

969

 

969

 

969

 

969

 

969

 

Station 17

(segment 117 FH)

 

1,122

1104

(18)

1104

(18)

1104

(18)

1000

(122)

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/7/2026 - 5/26/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)

Station 25

(segment 125 FH)

 

1,078

 

930

(148)

 

925

(153)

 

925

(153)

 

925

(153)

MLV 26-2 Relocation: Highway 59 Widening (4/24/2026 - 5/12/2026) MLV 26-3 Relocation: Highway 59 Widening (M) (5/13/2026 - 5/30/2026) MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter

(4/24/2026 - 5/4/2026)

Station 32 South

(segment 132 FH)

 

1,275

 

1,275

 

950

(325)

 

1,275

 

1,275

MLV 32-2 to MLV 40-2S: Pig Run - Maintenance (5/12/2026) MLV 32-3 to MLV 40-3S: Pig Run - Maintenance (5/13/2026)

Carthage Lateral (segment 700

FH)

 

296

180

(116)

180

(116)

 

296

 

296

MLV 706-1 to MLV 700-1: Pig Run - Caliper 5/14/26 (M) (5/14/2026)

MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/12/26 (M) (5/12/2026) MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/7/26 (M) (5/7/2026)

 

 

Station 47

(segment 143 FH)

 

 

 

1,343

 

 

1020

(323)

 

 

1050

(293)

 

 

1050

(293)

 

 

1330

(13)

MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (5/15/2026) MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (5/18/2026)

MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/11/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/12/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/13/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Sta. 47: Station Transformer Maintenance (5/4/2026 - 5/5/2026)

Station 63

(segment 163 FH)

 

1,242

1117

(125)

1117

(125)

1117

(125)

1117

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-3L to MLV 80-3: Anomaly Remediation (4/6/2026 - 6/5/2026)

MLV 822 West

(segment 820 FH)

 

724

150

(574)

 

724

 

724

 

724

MLV 820-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/6/2026)

MLV 822 East

(segment 822 BH)

 

972

150

(822)

 

972

 

972

 

972

MLV 823-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/5/2026)

Station 823

(segment 823 BH)

 

734

640

(94)

 

734

 

734

 

734

Sta 823 (Kinder): Annual ESD Test (5/5/2026 - 5/7/2026)

 

Station 834

(segment 834 BH)

 

 

683

 

670

(13)

 

670

(13)

 

504

(179)

 

 

683

Sta 834 to Sta 827: Maintenance Pig (5/21/2026)

Sta 834: Unit 1A - Replace Insulation Blanket (5/5/2026 - 5/6/2026) Sta 834: Unit 2A - Replace Insulation Blanket (5/7/2026 - 5/8/2026) Sta 834: Unit 3A - Replace Insulation Blanket (5/12/2026 - 5/13/2026) Sta 834: Unit 4A - Replace Insulation Blanket (5/14/2026 - 5/15/2026)

Station 527

(segment 527 BH)

 

2,395

1920

(475)

 

2,395

 

2,395

 

2,395

Sta. 527 Port Sulphur: Annual ESD Test (5/7/2026)

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,550

 

 

1375

(175)

 

 

1528

(22)

 

 

1528

(22)

 

 

1528

(22)

Sta 530: Annual ESD Test (5/7/2026)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Annual ESD Test (5/26/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/4/2026)

MLV 548

(segment 542 BH)

 

1,647

 

1,647

 

1,647

 

1,647

 

1,647

 

Station 860

(segment 548 BH)

 

1,593

1580

(13)

1580

(13)

800

(793)

800

(793)

MLV 551-2 to MLV 552-2: Anomaly Remediation (5/18/2026 - 5/29/2026) MLV 552-2 to MLV 553-2: Anomaly Remediation (5/4/2026 - 5/15/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 5/22/2026)

Station 860 North (Segment 860 BH)

 

 

1,874

 

1846

(28)

 

1630

(244)

 

1846

(28)

 

1846

(28)

Sta 860: Annual ESD Test & Maintenance (5/11/2026 - 5/12/2026)

Sta 860: Scrubber/Filter/Separator Clean, Inspect & Filter Change (5/11/2026 - 5/15/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

May 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(5/4 - 5/10)

Week 2

(5/11 - 5/17)

Week 3

(5/18 - 5/24)

Week 4

(5/25 - 5/31)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

2,685

 

 

 

2392

(293)

 

 

 

1895

(790)

 

 

 

1895

(790)

 

 

 

1895

(790)

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - AFD (5/19/2026)

MLV 87-3 to MLV 96-3: Pig Run - Cleaning/Gauge (5/14/2026) MLV 87-3 to MLV 96-3: Pig Run - EMAT (5/21/2026) MLV 87-3 to MLV 96-3: Pig Run - MDS (5/26/2026)

MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)

Station 114

(segment 114 BH)

 

907

771

(136)

771

(136)

771

(136)

609

(298)

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026) Sta 114 Catlettsburg: Annual ESD Test (5/25/2026 - 5/27/2026)

 

 

 

Station 204

(Segment 204 BH)

 

 

 

 

1,828

 

 

 

1660

(168)

 

 

 

1800

(28)

 

 

 

1800

(28)

 

 

 

1270

(558)

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026) MLV 213-1A to MLV 213-1BR: SPECIAL PERMIT REPLACEMENT TGP 213-1

(M) (4/1/2026 - 5/22/2026)

MLV 214-2 to MLV 219-2: Pig Run - EMAT (M) (5/6/2026) MLV 214-2 to MLV 219-2: Pig Run - MFL-C (M) (5/4/2026)

 

 

Station 245

(segment 245 FH)

 

 

 

986

 

 

735

(251)

 

 

490

(496)

 

 

498

(488)

 

 

720

(266)

MLV 237-2 to MLV 245-2: Pig Run - CAL/IMU (M) (5/19/2026)

MLV 237-2 to MLV 245-2: Pig Run - Gauge/Cleaning Tool (M) (5/12/2026) MLV 237-2 to MLV 245-2: Pig Run - MFL-A (M) (5/21/2026)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 249: Annual ESD Test & Maintenance (5/19/2026 - 5/25/2026)

Sta 249: Unit 2A - Crankcase Inspection (5/4/2026 - 5/8/2026)

Station 254

(segment 256 FH)

 

1,203

 

1,203

 

925

(278)

 

1,203

 

630

(573)

MLV 254-2 to MLV 261-2: Pig Run - Cal/IMU/MFL-A Combo (5/28/2026)

MLV 254-2 to MLV 261-2: Pig Run - Gauge/Cleaning tool (5/27/2026) Sta 254 Nassau: Annual ESD Test (5/12/2026)

Sta 254: Unit 2B - 4k / 8k Service Inspection (5/13/2026 - 5/14/2026)

Station 261 Discharge East (segment 261

FH)

 

888

 

888

 

888

 

888

 

888

 

Station 307

(segment 307 BH)

 

1,153

 

1,153

 

1,153

 

1,153

 

1,153

 

Station 315

(segment 315 BH)

 

1,823

 

1,823

 

1,823

 

1,823

1400

(423)

Sta 315 Wellsboro: Annual ESD Test (5/26/2026)

Station 321

(segment 321 FH)

 

2,102

1820

(282)

1820

(282)

1820

(282)

 

2,102

Sta 323A Lackawaxen: Annual ESD Testing & Valve Replacement (5/4/2026 - 5/7/2026)

Sta. 323A: Unit 1A - ABB Drive Modernization (5/4/2026 - 5/22/2026)

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

MLV 336 East

(segment 336 FH)

 

153

 

145

(8)

 

150

(3)

 

150

(3)

 

153

MLV 341-1 to MLV 342-1: Anomaly Remediation (5/1/2026 - 5/5/2026) MLV 342-1 to MLV 343-1: Anomaly Remediation (5/6/2026 - 5/10/2026) MLV 343-1 to MLV 344-1: Anomaly Remediation (5/11/2026 - 5/15/2026)

MLV 344-1 to MLV 345-1: Anomaly Remediation (5/16/2026 - 5/20/2026)

MLV 345 North of Derby Lateral (segment 355

BH)

 

147

 

147

 

147

 

47

(100)

 

47

(100)

MLV 345-1 to MLV 346-1: Anomaly Remediation (M) (5/21/2026 - 5/25/2026) MLV 346-1 to MLV 347-1: Anomaly Remediation (5/26/2026 - 5/30/2026) MLV 347-1 to MLV 348-1: Anomaly Remediation (5/31/2026 - 6/4/2026)

Station 405 HC Line (segment 299

FH)

 

794

 

794

 

794

 

794

 

794

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

June 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(6/1 - 6/7)

Week 2

(6/8 - 6/14)

Week 3

(6/15 - 6/21)

Week 4

(6/22 - 6/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

564

 

564

 

564

 

564

 

564

 

Station 1

(segment 101 BH)

 

399

 

399

 

399

 

399

 

399

 

Station 9

(segment 109 FH)

 

969

 

969

 

969

 

969

 

969

 

Station 17

(segment 117 FH)

 

1,122

1000

(122)

1000

(122)

1000

(122)

1000

(122)

MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)

Station 25

(segment 125 FH)

 

1,078

 

1,078

 

1,078

 

1,078

 

1,078

 

Station 47

(segment 143 FH)

 

1,343

1330

(13)

1300

(43)

1330

(13)

1330

(13)

MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (6/9/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Station 63

(segment 163 FH)

 

1,242

1117

(125)

1117

(125)

1117

(125)

1117

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-3L to MLV 80-3: Anomaly Remediation (4/6/2026 - 6/5/2026)

MLV 81-3 to MLV 82-3: Anomaly Remediation (6/8/2026 - 6/19/2026)

Station 823

(segment 823 BH)

 

734

 

734

 

734

 

734

 

734

 

 

 

Station 834

(segment 834 BH)

 

 

 

683

 

 

220

(463)

 

 

220

(463)

 

 

220

(463)

 

 

590

(93)

Sta 827 (Alexandria): Annual ESD and Maintenance (6/8/2026 - 6/11/2026) Sta 827 to Sta 823: Pig Run - Maintenance (M) (6/3/2026)

Sta 834 to Sta 827: Pig Run - BH Combo 6/11/26 (M) (6/11/2026) Sta 834 to Sta 827: Pig Run - BH Hard Spot 6/15/26 (M) (6/15/2026)

Sta 834 to Sta 827: Pig Run - Cleaning / Gauge 6/8/26 to 6/10/26 (M) (6/8/2026 - 6/10/2026)

Sta 834: Scrubber Filter Changeout (6/26/2026)

Station 534 South of Pool (segment 530

BH)

 

1,550

 

1528

(22)

 

1528

(22)

 

1528

(22)

 

1528

(22)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

MLV 548

(segment 542 BH)

 

1,647

815

(832)

815

(832)

815

(832)

1050

(597)

MLV 538-2L to MLV 539-2: Anomaly Remediation (6/22/2026 - 6/26/2026) MLV 539-2 to MLV 540-2: Anomaly Remediation (6/18/2026 - 6/20/2026)

MLV 540-2 to MLV 540-2A: Anomaly Remediation (6/1/2026 - 6/17/2026)

Station 860

(segment 548 BH)

 

1,593

1585

(8)

 

1,593

 

1,593

 

1,593

MLV 557-3 to MLV 559-3: Pig Runs - Cal / IMU & MFL-A 6/4/26 (6/4/2026)

MLV 557-3 to MLV 559-3: Pig Runs - Cleaning / Gauge 6/2/26 (6/2/2026)

Station 860 North (Segment 860

BH)

 

1,874

 

1530

(344)

 

1846

(28)

 

1846

(28)

 

1846

(28)

Sta 563 Joelton: Fuel Gas Filter Changeout (6/2/2026 - 6/6/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)

 

 

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

 

 

2,685

 

 

 

 

 

 

 

 

1479

(1206)

 

 

 

 

 

 

 

 

1700

(985)

 

 

 

 

 

 

 

 

2534

(151)

 

 

 

 

 

 

 

 

2151

(534)

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 109-4 to MLV 110-4: Pipe Replacement (6/17/2026 - 7/2/2026)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 874-2A to MLV 874-2B: Anomaly Remediation (6/1/2026 - 6/6/2026) MLV 874-2B to MLV 874-2: Anomaly Remediation (6/8/2026 - 6/13/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

MLV 96-4D to MLV 96-4BL: Spike Test (6/11/2026 - 6/20/2026) MLV 96-5S to MLV 96-5BL: Spike Test (6/22/2026 - 7/13/2026)

Sta 106 Clay City: Annual ESD Test & Maintenance (6/2/2026 - 6/5/2026) Sta 110 Morehead: Annual ESD Test & Substation Inspection (6/1/2026 - 6/5/2026)

Sta 87: Unit 3D - Power side Overhaul (6/1/2026 - 9/30/2026) Sta 871 Campbellsville: Annual ESD Test (6/23/2026)

Sta 875 Richmond: Annual ESD Test & Maintenance (6/9/2026 - 6/12/2026) Sta 96 Campbellsville: Annual ESD Test (6/9/2026 - 6/10/2026)

Sta 96 Campbellsville: Annual Substation Inspection (6/9/2026 - 6/12/2026) Sta. 106: C Building - Install Water Trech System (6/8/2026 - 6/12/2026)

Station 114

(segment 114 BH)

 

907

 

907

 

907

 

907

812

(95)

Sta 119A Rocky Fork: Annual ESD Test (6/22/2026 - 6/23/2026)

Station 200

(segment 200 BH)

 

1,766

 

1,766

1485

(281)

 

1,766

 

1,766

Sta 200 Greenup: Annual ESD Test (6/9/2026 - 6/12/2026)


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

June 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(6/1 - 6/7)

Week 2

(6/8 - 6/14)

Week 3

(6/15 - 6/21)

Week 4

(6/22 - 6/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Station 204

(Segment 204 BH)

 

 

1,828

 

1270

(558)

 

1270

(558)

 

 

1,828

 

 

1,828

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026)

Station 214

(Segment 214 BH)

 

1,853

 

1,853

1770

(83)

1770

(83)

1770

(83)

MLV 213-4A to MLV 213-4BR: SPECIAL PERMIT REPLACEMENT TGP 213-4

(M) (6/8/2026 - 7/31/2026)

Station 219 to

Station 224

(Segment 219 FH)

 

539

 

539

 

539

 

140

(399)

 

539

MLV 219-1D to MLV 224-1: Pig Run - Maintenance (6/16/2026)

Station 245

(segment 245 FH)

 

986

 

830

(156)

 

830

(156)

 

740

(246)

 

830

(156)

Sta 241: Annual ESD Test (6/16/2026)

Sta 241: Unit 1B - Oil System (6/2/2026 - 6/4/2026) Sta 241: Unit 2B - Oil System (6/9/2026 - 6/11/2026)

Sta 249: Unit 2B - 25k Overhaul (6/1/2026 - 6/26/2026)

MLV 256 West

(segment 249 FH)

 

1,203

 

1,203

 

1,203

 

1,203

1080

(123)

MLV 249-3A to MLV 251-3: Pig Run - Cal/IMU/MFL-A Combo (6/24/2026)

MLV 249-3A to MLV 251-3: Pig Run - Gauge/Cleaning tool (6/23/2026)

Station 261 Discharge East (segment 261

FH)

 

888

 

888

 

888

 

888

 

888

 

Station 307

(segment 307 BH)

 

1,153

965

(188)

1110

(43)

 

1,153

 

1,153

Sta 219: Unit 1B - Protective Device Checks & GHG (6/8/2026 - 6/12/2026) Sta 303A: Annual ESD Test & Maintenance (6/1/2026 - 6/5/2026)

Sta 307: Unit 3A - Turbocharger swap (6/8/2026 - 6/12/2026)

Station 315

(segment 315 BH)

 

1,823

 

1,823

 

1,823

 

1,823

 

1,823

 

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

MLV 329

(segment 324 FH)

 

846

 

846

155

(691)

 

846

 

846

MLV 325-1 to MLV 329-1: Pig runs - Cal / IMU 6/11/26 (M) (6/11/2026)

MLV 325-1 to MLV 329-1: Pig runs - Cleaning/Gauge 6/9/26 (M) (6/9/2026)

MLV 345 North of Derby Lateral (segment 355 BH)

 

 

147

 

47

(100)

 

47

(100)

 

47

(100)

 

47

(100)

MLV 347-1 to MLV 348-1: Anomaly Remediation (5/31/2026 - 6/4/2026) MLV 349-1 to MLV 350-1: Anomaly Remediation (6/5/2026 - 6/9/2026) MLV 350-1 to MLV 351-1: Anomaly Remediation (6/10/2026 - 6/14/2026) MLV 351-1 to MLV 352-1: Anomaly Remediation (6/15/2026 - 6/19/2026)

MLV 353-1 to MLV 354-1: Anomaly Remediation (6/20/2026 - 6/23/2026)

Cranston Lateral South

(segment 281

FH)

 

187

 

187

 

187

 

187

 

150

(37)

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Cal/IMU (M) (6/23/2026)

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Gauge/Cleaning tool (M) (6/22/2026)

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - MFL-A (M) (6/24/2026)

Station 405 HC Line (segment 299

FH)

 

794

 

794

 

794

 

794

 

794

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  03/19/2026 3:01:12PM Notice End Date/Time:  03/20/2026 9:00:00am
Post Date/Time:  3/19/2026 3:01:12 PM Notice ID: 400068
Reqrd Rsp:  1 Rsp Date:  03/19/2026
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

 

TGP - Outage Impact Report

 

 

 

-Major impact restrictions may be necessary

 

 

Seven Day Forecast (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(3/23)

Tuesday

(3/24)

Wednesday

(3/25)

Thursday

(3/26)

Friday

(3/27)

Saturday

(3/28)

Sunday

(3/29)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409

(Donna Line) (segment 490 FH)

 

585

 

585

 

585

 

585

 

585

 

585

 

585

 

585

 

Station 1

(segment 101 BH)

 

438

 

438

 

438

 

438

 

438

 

438

 

438

 

438

 

Station 9

(segment 109 FH)

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

1,022

 

Station 25

(segment 125 FH)

 

1,101

1090

(11)

1090

(11)

1090

(11)

1090

(11)

1090

(11)

 

1,101

 

1,101

MLV 24-1BR1 TO MLV 24-1A: Anomaly Remediation (3/23/2026 - 3/27/2026)

Station 32 South

(segment 132 FH)

 

1,297

 

1180

(117)

 

1180

(117)

 

1180

(117)

 

1180

(117)

 

1180

(117)

 

1,297

 

1,297

MLV 32-1D to MLV 33-1: Anomaly Remediation (3/16/2026 - 3/27/2026) MLV 33-3D to MLV 34-3S: Anomaly Remediation (3/23/2026 - 3/27/2026)

Station 40 KN South (segment 501

FH)

 

285

 

285

 

170

(115)

 

285

 

285

 

285

 

285

 

285

Sta 500-1 to Sta 823 (MLV 507-1): Pig Run - Maintenance (M) (3/24/2026)

Station 40 North

(segment 140 FH)

 

1,348

1330

(18)

1330

(18)

1330

(18)

1330

(18)

1330

(18)

1330

(18)

1330

(18)

MLV 41-2 to MLV 41-2A: Anomaly Remediation (3/23/2026 - 4/10/2026)

Station 47

(segment 143 FH)

 

1,354

 

1095

(259)

 

1095

(259)

 

1240

(114)

 

1291

(63)

 

1291

(63)

 

1291

(63)

 

1291

(63)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 3/25/2026)

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta. 47: Unit 1D/2D - D Building - Unit Valve Install (3/23/2026 - 3/24/2026) Sta. 47: Unit 1E - E Building - Unit Valve Install (3/25/2026)

Station 63

(segment 163 FH)

 

1,287

1162

(125)

1162

(125)

1162

(125)

1162

(125)

1162

(125)

1162

(125)

1162

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)

Station 823

(segment 823 BH)

 

759

725

(34)

725

(34)

725

(34)

725

(34)

725

(34)

725

(34)

725

(34)

Sta 823: Unit 11A - Jacket Water Pump (1/6/2026 - 4/9/2026)

Station 834

(segment 834 BH)

 

733

720

(13)

720

(13)

720

(13)

720

(13)

720

(13)

720

(13)

720

(13)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/3/2026)

Station 523

(segment 523 FH)

 

442

 

442

 

442

 

442

340

(102)

340

(102)

 

442

 

442

Sta 523: Unit 2B - 4k Maintenance (3/26/2026 - 3/27/2026)

 

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,632

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

 

 

 

1400

(232)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026) Sta 530: Unit 2A - Bearings (8/26/2025 - 3/31/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 530: Unit 6A - Bearings (10/6/2025 - 3/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/4/2026)

Sta 534: Unit 7A - Piston / Liner (5/20/2025 - 3/27/2026)

MLV 548

(segment 542 BH)

 

1,771

1705

(66)

1705

(66)

1705

(66)

1705

(66)

1705

(66)

1705

(66)

1705

(66)

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 4/17/2026) Sta 546: Unit 3A - Engine Maintenance (1/22/2026 - 3/31/2026)

Sta 546: Unit 7A - Metal in Oil (7/14/2025 - 3/27/2026)

Station 860

(segment 548 BH)

 

1,697

1680

(17)

1680

(17)

1680

(17)

1680

(17)

1680

(17)

1680

(17)

1680

(17)

Sta 550: Unit 3A - Turbocharger Exchange (3/16/2026 - 4/3/2026) Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 5/22/2026)

Station 860 North (Segment 860

BH)

 

2,028

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

 

2000

(28)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

2,775

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

 

 

2414

(361)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) Sta 106: Unit 1C - Replace Power Cylinder Bearing #9 (11/24/2025 - 3/30/2026)

Sta 87: Unit 2E Overhaul (2/20/2026 - 4/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)

Sta 96: Unit 1D - Compressor Valves (3/16/2026 - 4/3/2026)

Station 114

(segment 114 BH)

 

948

 

948

 

948

 

948

 

948

 

948

 

948

 

948

 

Station 204

(Segment 204 BH)

 

1,895

1650

(245)

1650

(245)

1650

(245)

1650

(245)

1650

(245)

1650

(245)

1650

(245)

Sta 214: Annual ESD Test & Maintenance (3/23/2026 - 4/17/2026)

Station 245

(segment 245 FH)

 

1,053

1035

(18)

1035

(18)

1035

(18)

1035

(18)

1035

(18)

1035

(18)

1035

(18)

Sta 245: Unit 1A & 2A - Automation Upgrade (3/23/2026 - 4/17/2026)

Station 254

(segment 256 FH)

 

1,271

1269

(2)

1269

(2)

1269

(2)

1269

(2)

1269

(2)

1151

(120)

1151

(120)

MLV 257-1 to MLV 258-1: Anomaly Remediation (3/23/2026 - 3/27/2026) MLV 258-1 to MLV 259-1: Anomaly Remediation (3/28/2026 - 4/6/2026)

Station 261 Discharge East (segment 261

FH)

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

1,035

 

Station 307

(segment 307 BH)

 

1,202

1075

(127)

1075

(127)

1075

(127)

1075

(127)

1075

(127)

 

1,202

 

1,202

Sta 307: Units 1A to 4A - Replace JW Pipe (2/9/2026 - 3/27/2026)

Station 315

(segment 315 BH)

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

MLV 324

(segment 324 FH)

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

Station 405 HC Line (segment 299

FH)

 

817

 

817

 

817

 

817

 

817

 

817

 

817

 

817

 


 

 

 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

 

TGP - Outage Impact Report

 

 

 

-Major impact restrictions may be necessary

 

 

Seven Day Forecast (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(3/23)

Tuesday

(3/24)

Wednesday

(3/25)

Thursday

(3/26)

Friday

(3/27)

Saturday

(3/28)

Sunday

(3/29)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

TGP - Outage Impact Report

 

 

-Major impact restrictions may be necessary

 

 

April 2026 (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(3/30 - 4/5)

Week 2

(4/6 - 4/12)

Week 3

(4/13 - 4/19)

Week 4

(4/20 - 4/26)

Week 5

(4/27 - 5/3)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

564

 

564

 

564

 

564

 

564

 

564

 

Station 1

(segment 101 BH)

 

399

 

399

 

399

 

399

 

399

 

399

 

Station 9

(segment 109 FH)

 

969

 

969

 

969

900

(69)

 

969

 

969

MLV 9-3D to MLV 11-3: Pig Run - Cleaning (4/13/2026)

MLV 9-3D to MLV 11-3: Pig Run - Gauge (4/14/2026) MLV 9-3D to MLV 11-3: Pig Run - MFL-A (4/15/2026)

Station 17

(segment 117 FH)

 

1,122

 

1,122

1104

(18)

1104

(18)

1104

(18)

1104

(18)

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/7/2026 - 5/26/2026)

Station 25

(segment 125 FH)

 

1,078

 

1,078

 

1055

(23)

 

1055

(23)

 

930

(148)

 

930

(148)

MLV 26-1 Relocation: Highway 59 Widening (4/6/2026 - 4/23/2026) MLV 26-2 Relocation: Highway 59 Widening (4/24/2026 - 5/12/2026) MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter

(4/24/2026 - 5/4/2026)

Station 32 South

(segment 132 FH)

 

1,275

 

1,275

 

1207

(68)

 

1207

(68)

 

1,275

 

1,275

MLV 31-2 to MLV 32-2S: Anomaly Remediation (4/6/2026 - 4/17/2026)

Station 40 North

(segment 140 FH)

 

1,342

1330

(12)

1330

(12)

 

1,342

 

1,342

 

1,342

MLV 41-2 to MLV 41-2A: Anomaly Remediation (3/23/2026 - 4/10/2026)

 

Station 47

(segment 143 FH)

 

 

1,343

 

 

1280

(63)

 

 

1020

(323)

 

 

1020

(323)

 

 

1280

(63)

 

 

1,343

MLV 56-1 to MLV 57-1: PHMSA Immediate (3/18/2026 - 4/24/2026)

Sta 47: Unit 1C thru 6C - Installing Unloaders (4/6/2026 - 4/17/2026) Sta 47: Unit 1E - Annual Turbine Maintenance (4/13/2026 - 4/16/2026)

Sta. 47: Scrubber/Filter/Separator Cleaning/Inspection/Changeout (4/6/2026 - 4/10/2026)

Sta. 47: Unit 1D - 16K hour Overhaul (4/6/2026 - 4/17/2026)

 

Station 63

(segment 163 FH)

 

 

1,242

 

1117

(125)

 

1117

(125)

 

901

(341)

 

901

(341)

 

1117

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-3L to MLV 80-3: Anomaly Remediation (4/6/2026 - 6/5/2026)

MLV 79-4 to MLV 71-4D: Pig Runs - Cleaning / Gauge 4/14/26 (4/14/2026) MLV 79-4 to MLV 71-4D: Pig Runs - EMAT 4/23/26 (4/23/2026)

Station 823

(segment 823 BH)

 

734

665

(69)

665

(69)

 

734

 

734

 

734

Sta 823: Unit 11A - Jacket Water Pump (1/6/2026 - 4/9/2026)

Station 834

(segment 834 BH)

 

683

670

(13)

 

683

 

683

 

683

 

683

Sta 834: Unit 1A - Turbocharger (3/30/2026 - 4/3/2026)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 4/3/2026)

Station 847

(segment 847 FH)

 

626

 

626

 

626

 

626

 

626

490

(136)

MLV 847-1 to MLV 851-1: Pig Runs - Cal / IMU & MFL-A 4/30/26 (4/30/2026)

MLV 847-1 to MLV 851-1: Pig Runs - Cleaning / Gauge 4/28/26 (4/28/2026)

Station 823 Muskrat Line (segment 509

BH)

 

231

 

123

(108)

 

231

 

231

 

231

 

231

Sta 823 to MLV 516: Pig Run - Maintenance (M) (3/30/2026 - 3/31/2026)

MLV 516

Muskrat Line (segment 516 FH)

 

241

 

100

(141)

 

241

 

100

(141)

 

100

(141)

 

241

MLV 516 to Sta 523: Pig Run - Cleaning / Gauge (M) (4/1/2026) MLV 516 to Sta 523: Pig Run - Cleaning / Gauge 4/18/26 to 4/23/26 (M)

(4/18/2026 - 4/23/2026)

MLV 516 to Sta 523: Pig Run - MFL-A 4/24/26 (M) (4/24/2026)

Station 527

(segment 527 BH)

 

2,395

 

2,395

2200

(195)

 

2,395

 

2,395

 

2,395

Sta 529: Annual ESD & 4k Inspection (4/6/2026 - 4/10/2026)

 

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,550

 

 

 

1318

(232)

 

 

 

1528

(22)

 

 

 

1390

(160)

 

 

 

1528

(22)

 

 

 

1528

(22)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 1B - Engine Maintenance (4/13/2026 - 4/17/2026) Sta 530: Unit 2A - Bearings (8/26/2025 - 3/31/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 530: Unit 6A - Bearings (10/6/2025 - 3/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/4/2026)

MLV 548

(segment 542 BH)

 

1,647

1581

(66)

1630

(17)

1630

(17)

1375

(272)

 

1,647

Sta 538 Heidelberg: Station ESD Test (4/21/2026)

Sta 542: Unit 1A - Emergent Repair (1/1/2026 - 4/17/2026) Sta 546: Unit 3A - Engine Maintenance (1/22/2026 - 3/31/2026)

 

 

 

Station 860

(segment 548 BH)

 

 

 

 

1,593

 

 

 

 

1576

(17)

 

 

 

 

1580

(13)

 

 

 

 

1475

(118)

 

 

 

 

1430

(163)

 

 

 

 

1390

(203)

MLV 554-2R to MLV 554-2: Anomaly Remediation (4/27/2026 - 5/2/2026) MLV 555-1L to MLV 558-1R: Anomaly Remediation (4/13/2026 - 4/17/2026) Sta 550: Unit 3A - Turbocharger Exchange (3/16/2026 - 4/3/2026)

Sta 555 Collinwood: Annual ESD Test & Maintenance (4/21/2026 - 4/24/2026) Sta 555: Scrubber/Filter/Separator Clean, Inspect & Filter Change (4/21/2026 - 4/24/2026)

Sta 555: Unit 1B - Protective Device Inspection (4/28/2026 - 4/29/2026) Sta 555: Unit 1B - Replace Recycle Valve Seal (4/28/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 5/22/2026)


 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

TGP - Outage Impact Report

 

 

-Major impact restrictions may be necessary

 

 

April 2026 (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(3/30 - 4/5)

Week 2

(4/6 - 4/12)

Week 3

(4/13 - 4/19)

Week 4

(4/20 - 4/26)

Week 5

(4/27 - 5/3)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

 

 

Station 860 North (Segment 860 BH)

 

 

 

 

 

 

1,874

 

 

 

 

 

1846

(28)

 

 

 

 

 

1846

(28)

 

 

 

 

 

1846

(28)

 

 

 

 

 

1535

(339)

 

 

 

 

 

1530

(344)

MLV 562-2 to MLV 563-2: Anomaly Remediation (4/13/2026 - 4/25/2026)

MLV 564-2R to MLV 564-2: Anomaly Remediation (4/6/2026 - 4/11/2026) Sta 563 Joelton: Annual ESD Test (4/29/2026)

Sta 563 Joelton: Unit 1A - Lube Oil Varnish System Installation (4/29/2026 - 5/1/2026)

Sta 563 Joelton: Unit 2A - Lube Oil Varnish System Installation (4/27/2026 - 4/29/2026)

Sta 563 Joelton: Unit 2A - Solar Turbine Exchange (4/20/2026 - 4/29/2026) Sta 860: Unit 2C - 4K/Turbine Waterwash/Boroscope (4/9/2026 - 4/10/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026) Sta 860: Unit 1C - 4K/Turbine Waterwash/Boroscope (4/7/2026 - 4/8/2026)

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

2,685

 

 

 

 

 

 

2177

(508)

 

 

 

 

 

 

1910

(775)

 

 

 

 

 

 

2270

(415)

 

 

 

 

 

 

2270

(415)

 

 

 

 

 

 

2392

(293)

MLV 106-2 to MLV 110-2: Pig Run - Cal / IMU (4/2/2026)

MLV 106-2 to MLV 110-2: Pig Run - Cleaning / Gauge (3/31/2026) MLV 106-2 to MLV 110-2: Pig Run - MFL-A (4/7/2026)

MLV 109-3: Crossover to Ln 4 Valve Replacements (3/30/2026 - 4/6/2026) MLV 109-3: Crossover to Ln 5 Valve Replacements (4/7/2026 - 4/20/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #9 (11/24/2025 - 3/30/2026) Sta 106: Unit 1D - 8K Solar Turbine Inspection (4/6/2026 - 4/10/2026)

Sta 87: Unit 2E Overhaul (2/20/2026 - 4/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)

Sta 875: Unit 1A- 8K Solar Turbine Inspection (4/6/2026 - 4/10/2026) Sta 96: Unit 1D - Compressor Valves (3/16/2026 - 4/3/2026)

Station 114

(segment 114 BH)

 

907

848

(59)

 

907

771

(136)

771

(136)

771

(136)

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026) Sta 118A: Solar Turbine Inspection (3/30/2026 - 4/1/2026)

 

 

 

 

Station 204

(Segment 204 BH)

 

 

 

 

 

1,828

 

 

 

 

1575

(253)

 

 

 

 

1575

(253)

 

 

 

 

1545

(283)

 

 

 

 

1460

(368)

 

 

 

 

1530

(298)

MLV 204-3 to MLV 209-3: Pig Run - Cal/IMU (4/16/2026) MLV 204-3 to MLV 209-3: Pig Run - EMAT (4/23/2026)

MLV 204-3 to MLV 209-3: Pig Run - Gauge/Cleaning (4/14/2026) MLV 204-3 to MLV 209-3: Pig Run - MFL-C (4/21/2026)

MLV 213-1A to MLV 213-1BR: SPECIAL PERMIT REPLACEMENT TGP 213-1

(M) (4/1/2026 - 5/22/2026)

MLV 214-2 to MLV 219-2: Pig Run - Cal/IMU (M) (4/30/2026)

MLV 214-2 to MLV 219-2: Pig Run - Gauge/Cleaning (M) (4/28/2026)

Sta 209 Cambridge: Annual ESD Test & Maintenance (4/20/2026 - 5/1/2026) Sta 214: Annual ESD Test & Maintenance (3/23/2026 - 4/17/2026)

Station 233

(segment 233 FH)

 

459

83

(376)

100

(359)

 

459

 

459

 

459

MLV 230-1 to MLV 237-1: Pig Run - CAL/IMU/MFL-C (M) (4/1/2026) MLV 230-1 to MLV 237-1: Pig Run - EMAT (M) (4/6/2026)

MLV 230-1 to MLV 237-1: Pig Run - Gauge/Cleaning (M) (3/30/2026)

Station 245

(segment 245 FH)

 

986

 

968

(18)

 

970

(16)

 

970

(16)

 

986

 

650

(336)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 245: Unit 1A & 2A - Automation Upgrade (3/23/2026 - 4/17/2026)

Sta 249: Unit 1A - Crankcase Inspection (4/27/2026 - 5/1/2026)

MLV 256 West

(segment 249 FH)

 

1,203

 

1,203

 

1,203

 

1,203

 

1,203

535

(668)

MLV 249-2 to MLV 254-2: Cal/IMU (4/29/2026)

MLV 249-2 to MLV 254-2: Gauge/Cleaning tool (4/28/2026) MLV 249-2 to MLV 254-2: MFL-C (4/30/2026)

 

Station 254

(segment 256 FH)

 

 

1,203

 

 

1050

(153)

 

 

1005

(198)

 

 

1040

(163)

 

 

1,203

 

 

1,203

MLV 254-3 to MLV 258-3A: Pig Runs - Cal/IMU/MFL-A Combo - 4/14/26 (4/14/2026)

MLV 254-3 to MLV 258-3A: Pig Runs - Gauge/Cleaning tool - 4/13/26 (4/13/2026)

MLV 258-1 to MLV 259-1: Anomaly Remediation (3/28/2026 - 4/6/2026)

MLV 259-1 to MLV 260-1: Anomaly Remediation (4/7/2026 - 4/11/2026)

Station 261 Discharge East (segment 261

FH)

 

888

 

888

 

888

 

888

 

888

 

888

 

Station 307

(segment 307 BH)

 

1,153

 

1,153

 

1,153

 

1,153

 

1,153

 

1,153

 

Station 315

(segment 315 BH)

 

1,823

 

1,823

 

1,823

 

1,823

 

1,823

 

1,823

 

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

 

MLV 336 East

(segment 336 FH)

 

 

153

 

 

153

 

 

140

(13)

 

 

140

(13)

 

 

145

(8)

 

 

145

(8)

MLV 336-1 to MLV 337-1: Anomaly Remediation (4/6/2026 - 4/10/2026) MLV 337-1 to MLV 338-1: Anomaly Remediation (4/11/2026 - 4/15/2026) MLV 338-1 to MLV 339-1: Anomaly Remediation (4/16/2026 - 4/20/2026) MLV 339-1 to MLV 340-1: Anomaly Remediation (4/21/2026 - 4/25/2026) MLV 340-1 to MLV 341-1: Anomaly Remediation (4/26/2026 - 4/30/2026)

MLV 341-1 to MLV 342-1: Anomaly Remediation (5/1/2026 - 5/5/2026)

Station 405 HC Line (segment 299

FH)

 

794

 

794

 

680

(114)

 

794

 

794

 

794

Sta 313 to Sta 237: Pig Run - Cleaning Run (HC Line) (4/7/2026) ; Sta 405A: Unit Water Wash (4/7/2026)


 

 

 

 

 

-Primary impact restrictions may be necessary

 

 

TGP - Outage Impact Report

 

 

-Major impact restrictions may be necessary

 

 

April 2026 (updated 03/19/26)

 

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(3/30 - 4/5)

Week 2

(4/6 - 4/12)

Week 3

(4/13 - 4/19)

Week 4

(4/20 - 4/26)

Week 5

(4/27 - 5/3)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 224

(segment 224 FH)

 

388

 

388

200

(188)

 

388

 

388

 

388

MLV 229-2 to MLV 232-2: Pig runs - Maintenance (M) (4/8/2026 - 4/9/2026)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

May 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(5/4 - 5/10)

Week 2

(5/11 - 5/17)

Week 3

(5/18 - 5/24)

Week 4

(5/25 - 5/31)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409A (Alamo) (segment 492

FH)

 

274

 

274

 

274

 

90

(184)

 

274

Sta. 409A Alamo: Annual ESD Test (5/19/2026)

Station 409 (Donna Line) (segment 490

FH)

 

564

 

325

(239)

 

564

 

564

 

564

Sta 409: Annual ESD Test & Maintenance (5/5/2026 - 5/7/2026)

Station 1

(segment 101 BH)

 

399

 

399

 

399

 

399

 

399

 

Station 9

(segment 109 FH)

 

969

 

969

 

969

 

969

 

969

 

Station 17

(segment 117 FH)

 

1,122

1104

(18)

1104

(18)

1104

(18)

1000

(122)

MLV 19-2 TO MLV 20-2A: Pipe Replacement (M) (4/7/2026 - 5/26/2026) MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)

Station 25

(segment 125 FH)

 

1,078

 

930

(148)

 

925

(153)

 

925

(153)

 

925

(153)

MLV 26-2 Relocation: Highway 59 Widening (4/24/2026 - 5/12/2026) MLV 26-3 Relocation: Highway 59 Widening (M) (5/13/2026 - 5/30/2026) MLV 27-1 to MLV 27-1A: Meter Maintenance - TIP Coley Creek Meter

(4/24/2026 - 5/4/2026)

Station 32 South

(segment 132 FH)

 

1,275

 

1,275

 

950

(325)

 

1,275

 

1,275

MLV 32-2 to MLV 40-2S: Pig Run - Maintenance (5/12/2026) MLV 32-3 to MLV 40-3S: Pig Run - Maintenance (5/13/2026)

Carthage Lateral (segment 700

FH)

 

296

180

(116)

180

(116)

 

296

 

296

MLV 706-1 to MLV 700-1: Pig Run - Caliper 5/14/26 (M) (5/14/2026)

MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/12/26 (M) (5/12/2026) MLV 706-1 to MLV 700-1: Pig Run - Cleaning 5/7/26 (M) (5/7/2026)

 

 

Station 47

(segment 143 FH)

 

 

 

1,343

 

 

1020

(323)

 

 

1050

(293)

 

 

1050

(293)

 

 

1330

(13)

MLV 47-4D to MLV 54-4S: Pig Run - AFD Combo (M) (5/15/2026) MLV 47-4D to MLV 54-4S: Pig Run - EMAT (M) (5/18/2026)

MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/11/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/12/2026) MLV 47-4D to MLV 54-4S: Pig Run - Gauge Cleaning (M) (5/13/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Sta. 47: Station Transformer Maintenance (5/4/2026 - 5/5/2026)

Station 63

(segment 163 FH)

 

1,242

1117

(125)

1117

(125)

1117

(125)

1117

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-3L to MLV 80-3: Anomaly Remediation (4/6/2026 - 6/5/2026)

MLV 822 West

(segment 820 FH)

 

724

150

(574)

 

724

 

724

 

724

MLV 820-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/6/2026)

MLV 822 East

(segment 822 BH)

 

972

150

(822)

 

972

 

972

 

972

MLV 823-1 to MLV 821R-101.1: Pig Run - Maintenance (M) (5/5/2026)

Station 823

(segment 823 BH)

 

734

640

(94)

 

734

 

734

 

734

Sta 823 (Kinder): Annual ESD Test (5/5/2026 - 5/7/2026)

 

Station 834

(segment 834 BH)

 

 

683

 

670

(13)

 

670

(13)

 

504

(179)

 

 

683

Sta 834 to Sta 827: Maintenance Pig (5/21/2026)

Sta 834: Unit 1A - Replace Insulation Blanket (5/5/2026 - 5/6/2026) Sta 834: Unit 2A - Replace Insulation Blanket (5/7/2026 - 5/8/2026) Sta 834: Unit 3A - Replace Insulation Blanket (5/12/2026 - 5/13/2026) Sta 834: Unit 4A - Replace Insulation Blanket (5/14/2026 - 5/15/2026)

Station 527

(segment 527 BH)

 

2,395

1920

(475)

 

2,395

 

2,395

 

2,395

Sta. 527 Port Sulphur: Annual ESD Test (5/7/2026)

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,550

 

 

1375

(175)

 

 

1528

(22)

 

 

1528

(22)

 

 

1528

(22)

Sta 530: Annual ESD Test (5/7/2026)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Annual ESD Test (5/26/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 5/4/2026)

MLV 548

(segment 542 BH)

 

1,647

 

1,647

 

1,647

 

1,647

 

1,647

 

Station 860

(segment 548 BH)

 

1,593

1580

(13)

1580

(13)

800

(793)

800

(793)

MLV 551-2 to MLV 552-2: Anomaly Remediation (5/18/2026 - 5/29/2026) MLV 552-2 to MLV 553-2: Anomaly Remediation (5/4/2026 - 5/15/2026)

Sta 555: Unit 5A - Foundation Regrout (1/20/2026 - 5/22/2026)

Station 860 North (Segment 860 BH)

 

 

1,874

 

1846

(28)

 

1630

(244)

 

1846

(28)

 

1846

(28)

Sta 860: Annual ESD Test & Maintenance (5/11/2026 - 5/12/2026)

Sta 860: Scrubber/Filter/Separator Clean, Inspect & Filter Change (5/11/2026 - 5/15/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

May 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(5/4 - 5/10)

Week 2

(5/11 - 5/17)

Week 3

(5/18 - 5/24)

Week 4

(5/25 - 5/31)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

2,685

 

 

 

2392

(293)

 

 

 

1895

(790)

 

 

 

1895

(790)

 

 

 

1895

(790)

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 87-3 to MLV 96-3: Pig Run - AFD (5/19/2026)

MLV 87-3 to MLV 96-3: Pig Run - Cleaning/Gauge (5/14/2026) MLV 87-3 to MLV 96-3: Pig Run - EMAT (5/21/2026) MLV 87-3 to MLV 96-3: Pig Run - MDS (5/26/2026)

MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

Sta 871: Unit 3A - Engine Crankshaft Inspection (8/22/2025 - 5/31/2026) Sta 871: Unit 3A - Main Bearing (8/22/2025 - 5/31/2026)

Station 114

(segment 114 BH)

 

907

771

(136)

771

(136)

771

(136)

609

(298)

MLV 118-1 to MLV 121-1: Anomaly Remediation (4/13/2026 - 5/22/2026) Sta 114 Catlettsburg: Annual ESD Test (5/25/2026 - 5/27/2026)

 

 

 

Station 204

(Segment 204 BH)

 

 

 

 

1,828

 

 

 

1660

(168)

 

 

 

1800

(28)

 

 

 

1800

(28)

 

 

 

1270

(558)

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026) MLV 213-1A to MLV 213-1BR: SPECIAL PERMIT REPLACEMENT TGP 213-1

(M) (4/1/2026 - 5/22/2026)

MLV 214-2 to MLV 219-2: Pig Run - EMAT (M) (5/6/2026) MLV 214-2 to MLV 219-2: Pig Run - MFL-C (M) (5/4/2026)

 

 

Station 245

(segment 245 FH)

 

 

 

986

 

 

735

(251)

 

 

490

(496)

 

 

498

(488)

 

 

720

(266)

MLV 237-2 to MLV 245-2: Pig Run - CAL/IMU (M) (5/19/2026)

MLV 237-2 to MLV 245-2: Pig Run - Gauge/Cleaning Tool (M) (5/12/2026) MLV 237-2 to MLV 245-2: Pig Run - MFL-A (M) (5/21/2026)

Sta 245 West Winfield: Annual ESD Test & Maintenance (4/30/2026 - 5/8/2026) Sta 249: Annual ESD Test & Maintenance (5/19/2026 - 5/25/2026)

Sta 249: Unit 2A - Crankcase Inspection (5/4/2026 - 5/8/2026)

Station 254

(segment 256 FH)

 

1,203

 

1,203

 

925

(278)

 

1,203

 

630

(573)

MLV 254-2 to MLV 261-2: Pig Run - Cal/IMU/MFL-A Combo (5/28/2026)

MLV 254-2 to MLV 261-2: Pig Run - Gauge/Cleaning tool (5/27/2026) Sta 254 Nassau: Annual ESD Test (5/12/2026)

Sta 254: Unit 2B - 4k / 8k Service Inspection (5/13/2026 - 5/14/2026)

Station 261 Discharge East (segment 261

FH)

 

888

 

888

 

888

 

888

 

888

 

Station 307

(segment 307 BH)

 

1,153

 

1,153

 

1,153

 

1,153

 

1,153

 

Station 315

(segment 315 BH)

 

1,823

 

1,823

 

1,823

 

1,823

1400

(423)

Sta 315 Wellsboro: Annual ESD Test (5/26/2026)

Station 321

(segment 321 FH)

 

2,102

1820

(282)

1820

(282)

1820

(282)

 

2,102

Sta 323A Lackawaxen: Annual ESD Testing & Valve Replacement (5/4/2026 - 5/7/2026)

Sta. 323A: Unit 1A - ABB Drive Modernization (5/4/2026 - 5/22/2026)

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

MLV 336 East

(segment 336 FH)

 

153

 

145

(8)

 

150

(3)

 

150

(3)

 

153

MLV 341-1 to MLV 342-1: Anomaly Remediation (5/1/2026 - 5/5/2026) MLV 342-1 to MLV 343-1: Anomaly Remediation (5/6/2026 - 5/10/2026) MLV 343-1 to MLV 344-1: Anomaly Remediation (5/11/2026 - 5/15/2026)

MLV 344-1 to MLV 345-1: Anomaly Remediation (5/16/2026 - 5/20/2026)

MLV 345 North of Derby Lateral (segment 355

BH)

 

147

 

147

 

147

 

47

(100)

 

47

(100)

MLV 345-1 to MLV 346-1: Anomaly Remediation (M) (5/21/2026 - 5/25/2026) MLV 346-1 to MLV 347-1: Anomaly Remediation (5/26/2026 - 5/30/2026) MLV 347-1 to MLV 348-1: Anomaly Remediation (5/31/2026 - 6/4/2026)

Station 405 HC Line (segment 299

FH)

 

794

 

794

 

794

 

794

 

794

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

June 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(6/1 - 6/7)

Week 2

(6/8 - 6/14)

Week 3

(6/15 - 6/21)

Week 4

(6/22 - 6/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

564

 

564

 

564

 

564

 

564

 

Station 1

(segment 101 BH)

 

399

 

399

 

399

 

399

 

399

 

Station 9

(segment 109 FH)

 

969

 

969

 

969

 

969

 

969

 

Station 17

(segment 117 FH)

 

1,122

1000

(122)

1000

(122)

1000

(122)

1000

(122)

MLV 19-3 TO MLV 20-3A: Pipe Replacement (M) (5/27/2026 - 8/7/2026)

Station 25

(segment 125 FH)

 

1,078

 

1,078

 

1,078

 

1,078

 

1,078

 

Station 47

(segment 143 FH)

 

1,343

1330

(13)

1300

(43)

1330

(13)

1330

(13)

MLV 40-3D to MLV 47-3S: Pig Run - Maintenance Cleaning (6/9/2026) MLV 55-1 to MLV 56-1: PHMSA Immediate (5/4/2026 - 6/26/2026)

Station 63

(segment 163 FH)

 

1,242

1117

(125)

1117

(125)

1117

(125)

1117

(125)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 79-3L to MLV 80-3: Anomaly Remediation (4/6/2026 - 6/5/2026)

MLV 81-3 to MLV 82-3: Anomaly Remediation (6/8/2026 - 6/19/2026)

Station 823

(segment 823 BH)

 

734

 

734

 

734

 

734

 

734

 

 

 

Station 834

(segment 834 BH)

 

 

 

683

 

 

220

(463)

 

 

220

(463)

 

 

220

(463)

 

 

590

(93)

Sta 827 (Alexandria): Annual ESD and Maintenance (6/8/2026 - 6/11/2026) Sta 827 to Sta 823: Pig Run - Maintenance (M) (6/3/2026)

Sta 834 to Sta 827: Pig Run - BH Combo 6/11/26 (M) (6/11/2026) Sta 834 to Sta 827: Pig Run - BH Hard Spot 6/15/26 (M) (6/15/2026)

Sta 834 to Sta 827: Pig Run - Cleaning / Gauge 6/8/26 to 6/10/26 (M) (6/8/2026 - 6/10/2026)

Sta 834: Scrubber Filter Changeout (6/26/2026)

Station 534 South of Pool (segment 530

BH)

 

1,550

 

1528

(22)

 

1528

(22)

 

1528

(22)

 

1528

(22)

Sta 530: Unit 1A - Bearings (8/25/2025 - 6/30/2026)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 12/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

MLV 548

(segment 542 BH)

 

1,647

815

(832)

815

(832)

815

(832)

1050

(597)

MLV 538-2L to MLV 539-2: Anomaly Remediation (6/22/2026 - 6/26/2026) MLV 539-2 to MLV 540-2: Anomaly Remediation (6/18/2026 - 6/20/2026)

MLV 540-2 to MLV 540-2A: Anomaly Remediation (6/1/2026 - 6/17/2026)

Station 860

(segment 548 BH)

 

1,593

1585

(8)

 

1,593

 

1,593

 

1,593

MLV 557-3 to MLV 559-3: Pig Runs - Cal / IMU & MFL-A 6/4/26 (6/4/2026)

MLV 557-3 to MLV 559-3: Pig Runs - Cleaning / Gauge 6/2/26 (6/2/2026)

Station 860 North (Segment 860

BH)

 

1,874

 

1530

(344)

 

1846

(28)

 

1846

(28)

 

1846

(28)

Sta 563 Joelton: Fuel Gas Filter Changeout (6/2/2026 - 6/6/2026)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2025 - 12/31/2026)

 

 

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

 

 

2,685

 

 

 

 

 

 

 

 

1479

(1206)

 

 

 

 

 

 

 

 

1700

(985)

 

 

 

 

 

 

 

 

2534

(151)

 

 

 

 

 

 

 

 

2151

(534)

MLV 104-1 to MLV 105-1: Anomaly Remediation (5/27/2026 - 6/10/2026) MLV 109-4 to MLV 110-4: Pipe Replacement (6/17/2026 - 7/2/2026)

MLV 54-3 to MLV 106-3: Emergent Repair - CAO (2/26/2026 - 12/31/2026) MLV 874-2A to MLV 874-2B: Anomaly Remediation (6/1/2026 - 6/6/2026) MLV 874-2B to MLV 874-2: Anomaly Remediation (6/8/2026 - 6/13/2026) MLV 96-3BR to MLV 96-3BL: Spike Test (5/27/2026 - 6/10/2026)

MLV 96-4D to MLV 96-4BL: Spike Test (6/11/2026 - 6/20/2026) MLV 96-5S to MLV 96-5BL: Spike Test (6/22/2026 - 7/13/2026)

Sta 106 Clay City: Annual ESD Test & Maintenance (6/2/2026 - 6/5/2026) Sta 110 Morehead: Annual ESD Test & Substation Inspection (6/1/2026 - 6/5/2026)

Sta 87: Unit 3D - Power side Overhaul (6/1/2026 - 9/30/2026) Sta 871 Campbellsville: Annual ESD Test (6/23/2026)

Sta 875 Richmond: Annual ESD Test & Maintenance (6/9/2026 - 6/12/2026) Sta 96 Campbellsville: Annual ESD Test (6/9/2026 - 6/10/2026)

Sta 96 Campbellsville: Annual Substation Inspection (6/9/2026 - 6/12/2026) Sta. 106: C Building - Install Water Trech System (6/8/2026 - 6/12/2026)

Station 114

(segment 114 BH)

 

907

 

907

 

907

 

907

812

(95)

Sta 119A Rocky Fork: Annual ESD Test (6/22/2026 - 6/23/2026)

Station 200

(segment 200 BH)

 

1,766

 

1,766

1485

(281)

 

1,766

 

1,766

Sta 200 Greenup: Annual ESD Test (6/9/2026 - 6/12/2026)


 

 

 

-Primary impact restrictions may be necessary

 

TGP - Outage Impact Report

 

-Major impact restrictions may be necessary

 

June 2026 (updated 03/19/26)

 

-Minor impact restrictions may be necessary depending on flow conditions

 

 

 

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(6/1 - 6/7)

Week 2

(6/8 - 6/14)

Week 3

(6/15 - 6/21)

Week 4

(6/22 - 6/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Station 204

(Segment 204 BH)

 

 

1,828

 

1270

(558)

 

1270

(558)

 

 

1,828

 

 

1,828

MLV 204-4 to MLV 206-4: Replace MLV 205-4 (M) (5/27/2026 - 6/10/2026) MLV 205-4 to MLV 207-4: Replace MLV 206-4 (M) (5/27/2026 - 6/10/2026) MLV 206-4 to MLV 208-4: Replace MLV 207-4 (M) (5/27/2026 - 6/10/2026)

MLV 207-4 to MLV 209-4: Replace Valve MLV 208-4 (M) (5/27/2026 - 6/10/2026)

Station 214

(Segment 214 BH)

 

1,853

 

1,853

1770

(83)

1770

(83)

1770

(83)

MLV 213-4A to MLV 213-4BR: SPECIAL PERMIT REPLACEMENT TGP 213-4

(M) (6/8/2026 - 7/31/2026)

Station 219 to

Station 224

(Segment 219 FH)

 

539

 

539

 

539

 

140

(399)

 

539

MLV 219-1D to MLV 224-1: Pig Run - Maintenance (6/16/2026)

Station 245

(segment 245 FH)

 

986

 

830

(156)

 

830

(156)

 

740

(246)

 

830

(156)

Sta 241: Annual ESD Test (6/16/2026)

Sta 241: Unit 1B - Oil System (6/2/2026 - 6/4/2026) Sta 241: Unit 2B - Oil System (6/9/2026 - 6/11/2026)

Sta 249: Unit 2B - 25k Overhaul (6/1/2026 - 6/26/2026)

MLV 256 West

(segment 249 FH)

 

1,203

 

1,203

 

1,203

 

1,203

1080

(123)

MLV 249-3A to MLV 251-3: Pig Run - Cal/IMU/MFL-A Combo (6/24/2026)

MLV 249-3A to MLV 251-3: Pig Run - Gauge/Cleaning tool (6/23/2026)

Station 261 Discharge East (segment 261

FH)

 

888

 

888

 

888

 

888

 

888

 

Station 307

(segment 307 BH)

 

1,153

965

(188)

1110

(43)

 

1,153

 

1,153

Sta 219: Unit 1B - Protective Device Checks & GHG (6/8/2026 - 6/12/2026) Sta 303A: Annual ESD Test & Maintenance (6/1/2026 - 6/5/2026)

Sta 307: Unit 3A - Turbocharger swap (6/8/2026 - 6/12/2026)

Station 315

(segment 315 BH)

 

1,823

 

1,823

 

1,823

 

1,823

 

1,823

 

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

MLV 329

(segment 324 FH)

 

846

 

846

155

(691)

 

846

 

846

MLV 325-1 to MLV 329-1: Pig runs - Cal / IMU 6/11/26 (M) (6/11/2026)

MLV 325-1 to MLV 329-1: Pig runs - Cleaning/Gauge 6/9/26 (M) (6/9/2026)

MLV 345 North of Derby Lateral (segment 355 BH)

 

 

147

 

47

(100)

 

47

(100)

 

47

(100)

 

47

(100)

MLV 347-1 to MLV 348-1: Anomaly Remediation (5/31/2026 - 6/4/2026) MLV 349-1 to MLV 350-1: Anomaly Remediation (6/5/2026 - 6/9/2026) MLV 350-1 to MLV 351-1: Anomaly Remediation (6/10/2026 - 6/14/2026) MLV 351-1 to MLV 352-1: Anomaly Remediation (6/15/2026 - 6/19/2026)

MLV 353-1 to MLV 354-1: Anomaly Remediation (6/20/2026 - 6/23/2026)

Cranston Lateral South

(segment 281

FH)

 

187

 

187

 

187

 

187

 

150

(37)

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Cal/IMU (M) (6/23/2026)

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - Gauge/Cleaning tool (M) (6/22/2026)

MLV 265E-101.1 to MLV 265E-104: PIG RUNS - MFL-A (M) (6/24/2026)

Station 405 HC Line (segment 299

FH)

 

794

 

794

 

794

 

794

 

794

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.