Tennessee Gas Pipeline Notice 400050
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 03/18/2026 7:43:51PM | Notice End Date/Time: 03/19/2026 9:00:00am |
| Post Date/Time: 3/18/2026 7:43:51 PM | Notice ID: 400050 |
| Reqrd Rsp: 1 | Rsp Date: 03/18/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 03-18-2026 ID3 |
Effective Intraday 3 Cycle (22:00) for the gas day of Wednesday, March 18, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
ofo daily critical day 1 for ALL AREAS EAST OF STA 245 AND STA 321 AS WELL AS the 500 line (segments 527, 529, 530, 534, 539, 542, 548, 860) for over-takes from the system or under-deliveries into the system for all balancing parties
METER RESTRICTIONS
· EFMIDS/TGP Banquete Plant: Rip 1T 1 Receipt Meter (Pin 412877) - through 100% of SA increases due to nominations in excess of operational capacity; 3,610 Dths
· ATMOS-TX/TGP Katy Exch Waller Receipt Meter (Pin 412100) - through 100% of SA increases due to nominations in excess of operational capacity; 566 Dths
· HICKORYR/TGP Mohawk Road Power Plt Delivery Meter (Pin 50789) - through 100% of PAYBACK TGP increases due to nominations in excess of operational capacity; 7,570 Dths
SEGMENT RESTRICTIONS
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 27,307 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 03/18/2026 7:43:51PM | Notice End Date/Time: 03/19/2026 9:00:00am |
| Post Date/Time: 3/18/2026 7:43:51 PM | Notice ID: 400050 |
| Reqrd Rsp: 1 | Rsp Date: 03/18/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 03-18-2026 ID3 |
Effective Intraday 3 Cycle (22:00) for the gas day of Wednesday, March 18, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
ofo daily critical day 1 for ALL AREAS EAST OF STA 245 AND STA 321 AS WELL AS the 500 line (segments 527, 529, 530, 534, 539, 542, 548, 860) for over-takes from the system or under-deliveries into the system for all balancing parties
METER RESTRICTIONS
· EFMIDS/TGP Banquete Plant: Rip 1T 1 Receipt Meter (Pin 412877) - through 100% of SA increases due to nominations in excess of operational capacity; 3,610 Dths
· ATMOS-TX/TGP Katy Exch Waller Receipt Meter (Pin 412100) - through 100% of SA increases due to nominations in excess of operational capacity; 566 Dths
· HICKORYR/TGP Mohawk Road Power Plt Delivery Meter (Pin 50789) - through 100% of PAYBACK TGP increases due to nominations in excess of operational capacity; 7,570 Dths
SEGMENT RESTRICTIONS
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 27,307 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.