Tennessee Gas Pipeline Notice 398929
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 02/01/2026 12:06:24PM | Notice End Date/Time: 02/02/2026 9:00:00am |
| Post Date/Time: 2/1/2026 12:06:24 PM | Notice ID: 398929 |
| Reqrd Rsp: 1 | Rsp Date: 02/01/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 02-01-2026 ID1 |
Effective Intraday 1 Cycle (14:00) for the gas day of Sunday, February 01, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 2 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· GCENGY/TGP Coleto Creek Victoria Receipt Meter (Pin 412755) - through approx 26% of SA increases due to nominations in excess of operational capacity; 968 Dths
· ETC TIG/TGP Chatham Jackson Delivery Meter (Pin 412830) - through approx 79% of SOP increases deliveries due to displacement gas unavailable for backhaul; 8,597 Dths
· ETNG/TGP East Lobelville Tn Perry Receipt Meter (Pin 420042) - through approx 90% of IT increases receipts due to displacement gas unavailable for backhaul; 2,157 Dths
· Atmos KY/TGP Harrodsburg Ky Boyle Delivery Meter (Pin 420028) - through 100% of SIPss increases due to nominations in excess of operational capacity; 251 Dths
SEGMENT RESTRICTIONS
· STA 47 (Segment 143 FH) - through approx 60% of SOP increases due to operational concerns; 54,508 Dths
· STA 63 (Segment 163 FH) - through 100% of SOP increases due to operational concerns; 66,028 Dths
· STA 847 (Segment 847 FH) - through 100% of SOP increases due to operational concerns; 23,711 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 3,750 Dths
· STA 307 (Segment 307 BH) - through approx 24% of SOP increases due to nominations in excess of operational capacity; 71,096 Dths
· MLV 314 East (Segment 314 BH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 77,803 Dths
· STA 315 (Segment 315 BH) - through approx 29% of SOP increases due to nominations in excess of operational capacity; 29,797 Dths
· STA 317 (Segment 317 BH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 60,577 Dths
· STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 666,387 Dths
· STA 325 (Segment 324 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 176,401 Dths
· STA 219 North (Segment 219 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 17,885 Dths
· Z5 HC North (Segment 299 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 284,479 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 383,200 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 9,923 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 02/01/2026 12:06:24PM | Notice End Date/Time: 02/02/2026 9:00:00am |
| Post Date/Time: 2/1/2026 12:06:24 PM | Notice ID: 398929 |
| Reqrd Rsp: 1 | Rsp Date: 02/01/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 02-01-2026 ID1 |
Effective Intraday 1 Cycle (14:00) for the gas day of Sunday, February 01, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 2 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· GCENGY/TGP Coleto Creek Victoria Receipt Meter (Pin 412755) - through approx 26% of SA increases due to nominations in excess of operational capacity; 968 Dths
· ETC TIG/TGP Chatham Jackson Delivery Meter (Pin 412830) - through approx 79% of SOP increases deliveries due to displacement gas unavailable for backhaul; 8,597 Dths
· ETNG/TGP East Lobelville Tn Perry Receipt Meter (Pin 420042) - through approx 90% of IT increases receipts due to displacement gas unavailable for backhaul; 2,157 Dths
· Atmos KY/TGP Harrodsburg Ky Boyle Delivery Meter (Pin 420028) - through 100% of SIPss increases due to nominations in excess of operational capacity; 251 Dths
SEGMENT RESTRICTIONS
· STA 47 (Segment 143 FH) - through approx 60% of SOP increases due to operational concerns; 54,508 Dths
· STA 63 (Segment 163 FH) - through 100% of SOP increases due to operational concerns; 66,028 Dths
· STA 847 (Segment 847 FH) - through 100% of SOP increases due to operational concerns; 23,711 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 3,750 Dths
· STA 307 (Segment 307 BH) - through approx 24% of SOP increases due to nominations in excess of operational capacity; 71,096 Dths
· MLV 314 East (Segment 314 BH) - through approx 92% of SOP increases due to nominations in excess of operational capacity; 77,803 Dths
· STA 315 (Segment 315 BH) - through approx 29% of SOP increases due to nominations in excess of operational capacity; 29,797 Dths
· STA 317 (Segment 317 BH) - through approx 93% of SOP increases due to nominations in excess of operational capacity; 60,577 Dths
· STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 666,387 Dths
· STA 325 (Segment 324 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 176,401 Dths
· STA 219 North (Segment 219 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 17,885 Dths
· Z5 HC North (Segment 299 FH) - through approx 97% of SOP increases due to nominations in excess of operational capacity; 284,479 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 383,200 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 9,923 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.