Tennessee Gas Pipeline Notice 398721
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 01/25/2026 7:42:27PM | Notice End Date/Time: 01/26/2026 9:00:00am |
| Post Date/Time: 1/25/2026 7:42:27 PM | Notice ID: 398721 |
| Reqrd Rsp: 1 | Rsp Date: 01/25/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 01-26-2026 EC |
Effective Evening Cycle (9:00) for the gas day of Monday, January 26, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 2 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 5,000 Dths
· GULFSTH/TGP Worthy Road South Ouach Delivery Meter (Pin 49780) - through 100% of SOP increases due to operational concerns; 13,300 Dths
· ETNG/TGP East Lobelville Tn Perry Delivery Meter (Pin 420042) - through 100% of IT receipt increases due to displacement gas unavailable for backhaul; 2,746 Dths
· Div PROD/TGP Mason Dehy: Rip 315F 1 Receipt Meter (Pin 412858) - through 100% of SOP delivery increases due to displacement gas unavailable for backhaul; 74,320 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through 100% of SIPss increases due to nominations in excess of operational capacity; 6,414 Dths
· EMPIREGN/TGP Schodack Rensselaer Delivery Meter (Pin 421070) - through 100% of SIPss receipt increases due to displacement gas unavailable for backhaul; 1,383 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through approx 71% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 96,800 Dths
· STA 47 (Segment 143 FH) - through 100% of SA increases due to scheduled maintenance and nominations in excess of operational capacity; 81,492 Dths
· STA 847 (Segment 847 FH) - through approx 1% of SOP increases due to nominations in excess of operational capacity; 61,556 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 1,273 Dths
· STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 307,132 Dths
· MLV 314 East (Segment 314 BH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 118,932 Dths
· STA 315 (Segment 315 BH) - through approx 23% of SOP increases due to nominations in excess of operational capacity; 39,792 Dths
· STA 317 (Segment 317 BH) - through approx 37% of SOP increases due to nominations in excess of operational capacity; 51,018 Dths
· STA 321 (Segment 321 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 724,446 Dths
· MLV 330 (Segment 324 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 125,854 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,750 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 290,521 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,000 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,946 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 01/25/2026 7:42:27PM | Notice End Date/Time: 01/26/2026 9:00:00am |
| Post Date/Time: 1/25/2026 7:42:27 PM | Notice ID: 398721 |
| Reqrd Rsp: 1 | Rsp Date: 01/25/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 01-26-2026 EC |
Effective Evening Cycle (9:00) for the gas day of Monday, January 26, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 2 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through 100% of SA increases due to operational concerns; 5,000 Dths
· GULFSTH/TGP Worthy Road South Ouach Delivery Meter (Pin 49780) - through 100% of SOP increases due to operational concerns; 13,300 Dths
· ETNG/TGP East Lobelville Tn Perry Delivery Meter (Pin 420042) - through 100% of IT receipt increases due to displacement gas unavailable for backhaul; 2,746 Dths
· Div PROD/TGP Mason Dehy: Rip 315F 1 Receipt Meter (Pin 412858) - through 100% of SOP delivery increases due to displacement gas unavailable for backhaul; 74,320 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through 100% of SIPss increases due to nominations in excess of operational capacity; 6,414 Dths
· EMPIREGN/TGP Schodack Rensselaer Delivery Meter (Pin 421070) - through 100% of SIPss receipt increases due to displacement gas unavailable for backhaul; 1,383 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through approx 71% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 96,800 Dths
· STA 47 (Segment 143 FH) - through 100% of SA increases due to scheduled maintenance and nominations in excess of operational capacity; 81,492 Dths
· STA 847 (Segment 847 FH) - through approx 1% of SOP increases due to nominations in excess of operational capacity; 61,556 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 1,273 Dths
· STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 307,132 Dths
· MLV 314 East (Segment 314 BH) - through approx 66% of SOP increases due to nominations in excess of operational capacity; 118,932 Dths
· STA 315 (Segment 315 BH) - through approx 23% of SOP increases due to nominations in excess of operational capacity; 39,792 Dths
· STA 317 (Segment 317 BH) - through approx 37% of SOP increases due to nominations in excess of operational capacity; 51,018 Dths
· STA 321 (Segment 321 FH) - through approx 99% of SOP increases due to nominations in excess of operational capacity; 724,446 Dths
· MLV 330 (Segment 324 FH) - through approx 85% of SOP increases due to nominations in excess of operational capacity; 125,854 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,750 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 290,521 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,000 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 6,946 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.