Tennessee Gas Pipeline Notice 398713
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 01/25/2026 3:40:10PM | Notice End Date/Time: 01/26/2026 9:00:00am |
| Post Date/Time: 1/25/2026 3:40:10 PM | Notice ID: 398713 |
| Reqrd Rsp: 1 | Rsp Date: 01/25/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 01-26-2026TIMELY CYCLE |
Effective Timely Cycle (9:00) for the gas day of Monday, January 26, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 2 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through approx 50% of SA due to nominations in excess of operational capacity; 5,000 Dths
· ETNG/TGP East Lobelville Tn Perry Delivery Meter (Pin 420042) - through 100% of IT receipts due to displacement gas unavailable for backhaul; 2,746 Dths
· TET/TGP Wheelersburg: Rip 201 101.1 Receipt Meter (Pin 412874) - through approx 44% of IT due to nominations in excess of operational capacity; 105,588 Dths
· Div PROD/TGP Mason Dehy: Rip 315F 1 Receipt Meter (Pin 412858) - through 100% of SOP deliveries due to displacement gas unavailable for backhaul; 74,320 Dths
· BLCKHILL/TGP Swain Road Dehy: Rip 3 Receipt Meter (Pin 412785) - through approx 12% of SA due to nominations in excess of operational capacity; 893 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through 100% of SIPss due to nominations in excess of operational capacity; 8,456 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through approx 53% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 318,513 Dths
· STA 47 (Segment 143 FH) - through 100% of SA due to scheduled maintenance and nominations in excess of operational capacity; 81,781 Dths
· STA 847 (Segment 847 FH) - through approx 3% of SOP due to nominations in excess of operational capacity; 72,686 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP due to operational concerns; 11,454 Dths
· MLV 548 (Segment 542 BH) - through 100% of SOP due to emergent repair at STA 542 Unit 1A; 46,026 Dths
· STA 307 (Segment 307 BH) - through 100% of SOP due to nominations in excess of operational capacity; 361,132 Dths
· MLV 314 East (Segment 314 BH) - through approx 66% of SOP due to nominations in excess of operational capacity; 333,569 Dths
· STA 315 (Segment 315 BH) - through approx 56% of SOP due to nominations in excess of operational capacity; 338,491 Dths
· STA 317 (Segment 317 BH) - through approx 21% of SOP due to nominations in excess of operational capacity; 58,844 Dths
· STA 321 (Segment 321 FH) - through approx 95% of SOP due to nominations in excess of operational capacity; 1,002,269 Dths
· STA 325 (Segment 324 FH) - through approx 51% of SOP due to nominations in excess of operational capacity; 157,378 Dths
· MLV 330 (Segment 324 FH) - through approx 42% of SOP due to nominations in excess of operational capacity; 119,182 Dths
· MLV 336 East (Segment 336 FH) - through 100% of SOP due to nominations in excess of operational capacity; 4,579 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP due to nominations in excess of operational capacity; 38,075 Dths
· Z5hc North (Segment 299 FH) - through approx 96% of SOP due to nominations in excess of operational capacity; 528,778 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP due to nominations in excess of operational capacity; 648,109 Dths
· STA 249 (Segment 249 FH) - through 100% of SOP due to nominations in excess of operational capacity; 420,085 Dths
· STA 254 (Segment 249 FH) - through 100% of SOP due to nominations in excess of operational capacity; 119,952 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP due to nominations in excess of operational capacity; 7,500 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 01/25/2026 3:40:10PM | Notice End Date/Time: 01/26/2026 9:00:00am |
| Post Date/Time: 1/25/2026 3:40:10 PM | Notice ID: 398713 |
| Reqrd Rsp: 1 | Rsp Date: 01/25/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 01-26-2026TIMELY CYCLE |
Effective Timely Cycle (9:00) for the gas day of Monday, January 26, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 2 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· CPROC/TGP Hcp Colorado Receipt Meter (Pin 410144) - through approx 50% of SA due to nominations in excess of operational capacity; 5,000 Dths
· ETNG/TGP East Lobelville Tn Perry Delivery Meter (Pin 420042) - through 100% of IT receipts due to displacement gas unavailable for backhaul; 2,746 Dths
· TET/TGP Wheelersburg: Rip 201 101.1 Receipt Meter (Pin 412874) - through approx 44% of IT due to nominations in excess of operational capacity; 105,588 Dths
· Div PROD/TGP Mason Dehy: Rip 315F 1 Receipt Meter (Pin 412858) - through 100% of SOP deliveries due to displacement gas unavailable for backhaul; 74,320 Dths
· BLCKHILL/TGP Swain Road Dehy: Rip 3 Receipt Meter (Pin 412785) - through approx 12% of SA due to nominations in excess of operational capacity; 893 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through 100% of SIPss due to nominations in excess of operational capacity; 8,456 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through approx 53% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 318,513 Dths
· STA 47 (Segment 143 FH) - through 100% of SA due to scheduled maintenance and nominations in excess of operational capacity; 81,781 Dths
· STA 847 (Segment 847 FH) - through approx 3% of SOP due to nominations in excess of operational capacity; 72,686 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP due to operational concerns; 11,454 Dths
· MLV 548 (Segment 542 BH) - through 100% of SOP due to emergent repair at STA 542 Unit 1A; 46,026 Dths
· STA 307 (Segment 307 BH) - through 100% of SOP due to nominations in excess of operational capacity; 361,132 Dths
· MLV 314 East (Segment 314 BH) - through approx 66% of SOP due to nominations in excess of operational capacity; 333,569 Dths
· STA 315 (Segment 315 BH) - through approx 56% of SOP due to nominations in excess of operational capacity; 338,491 Dths
· STA 317 (Segment 317 BH) - through approx 21% of SOP due to nominations in excess of operational capacity; 58,844 Dths
· STA 321 (Segment 321 FH) - through approx 95% of SOP due to nominations in excess of operational capacity; 1,002,269 Dths
· STA 325 (Segment 324 FH) - through approx 51% of SOP due to nominations in excess of operational capacity; 157,378 Dths
· MLV 330 (Segment 324 FH) - through approx 42% of SOP due to nominations in excess of operational capacity; 119,182 Dths
· MLV 336 East (Segment 336 FH) - through 100% of SOP due to nominations in excess of operational capacity; 4,579 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP due to nominations in excess of operational capacity; 38,075 Dths
· Z5hc North (Segment 299 FH) - through approx 96% of SOP due to nominations in excess of operational capacity; 528,778 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP due to nominations in excess of operational capacity; 648,109 Dths
· STA 249 (Segment 249 FH) - through 100% of SOP due to nominations in excess of operational capacity; 420,085 Dths
· STA 254 (Segment 249 FH) - through 100% of SOP due to nominations in excess of operational capacity; 119,952 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP due to nominations in excess of operational capacity; 7,500 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.