Tennessee Gas Pipeline Notice 398658
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 01/23/2026 3:13:04PM | Notice End Date/Time: 01/24/2026 9:00:00am |
| Post Date/Time: 1/23/2026 3:13:04 PM | Notice ID: 398658 |
| Reqrd Rsp: 1 | Rsp Date: 01/23/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 01-24-2026 TIMELY CYCLE |
Effective Timely Cycle (9:00) for the gas day of Saturday, January 24, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· TGP/SNG Pugh Mississippi Exch Lownd Delivery Meter (Pin 420294) - through 100% of SIPss due to operational concerns; 34,944 Dths
· Atmos KY/TGP Harrodsburg Ky Boyle Delivery Meter (Pin 420028) - through approx 28% of SIPss due to nominations in excess of operational capacity; 1,251 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through approx 34% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 158,746 Dths
· STA 204 (Segment 204 BH) - through 100% of SOP due to operational concerns; 4,350 Dths
· STA 307 (Segment 307 BH) - through approx 97% of SOP due to nominations in excess of operational capacity; 347,731 Dths
· MLV 314 East (Segment 314 BH) - through approx 64% of SOP due to nominations in excess of operational capacity; 334,484 Dths
· STA 315 (Segment 315 BH) - through approx 55% of SOP due to nominations in excess of operational capacity; 343,704 Dths
· STA 317 (Segment 317 BH) - through approx 25% of SOP due to nominations in excess of operational capacity; 76,516 Dths
· STA 321 (Segment 321 FH) - through approx 95% of SOP due to nominations in excess of operational capacity; 1,007,558 Dths
· STA 325 (Segment 324 FH) - through approx 56% of SOP due to nominations in excess of operational capacity; 173,562 Dths
· MLV 330 (Segment 324 FH) - through approx 39% of SOP due to nominations in excess of operational capacity; 103,241 Dths
· MLV 336 East (Segment 336 FH) - through 100% of SOP due to nominations in excess of operational capacity; 4,804 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP due to nominations in excess of operational capacity; 163,275 Dths
· Z5hc North (Segment 299 FH) - through approx 96% of SOP due to nominations in excess of operational capacity; 530,357 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP due to nominations in excess of operational capacity; 648,212 Dths
· STA 249 (Segment 249 FH) - through 100% of SOP due to nominations in excess of operational capacity; 420,085 Dths
· STA 254 (Segment 249 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 102,766 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP due to operational concerns; 8,495 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 01/23/2026 3:13:04PM | Notice End Date/Time: 01/24/2026 9:00:00am |
| Post Date/Time: 1/23/2026 3:13:04 PM | Notice ID: 398658 |
| Reqrd Rsp: 1 | Rsp Date: 01/23/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 01-24-2026 TIMELY CYCLE |
Effective Timely Cycle (9:00) for the gas day of Saturday, January 24, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 SYSTEM WIDE FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· TGP/SNG Pugh Mississippi Exch Lownd Delivery Meter (Pin 420294) - through 100% of SIPss due to operational concerns; 34,944 Dths
· Atmos KY/TGP Harrodsburg Ky Boyle Delivery Meter (Pin 420028) - through approx 28% of SIPss due to nominations in excess of operational capacity; 1,251 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through approx 34% of SOP due to scheduled maintenance and nominations in excess of operational capacity; 158,746 Dths
· STA 204 (Segment 204 BH) - through 100% of SOP due to operational concerns; 4,350 Dths
· STA 307 (Segment 307 BH) - through approx 97% of SOP due to nominations in excess of operational capacity; 347,731 Dths
· MLV 314 East (Segment 314 BH) - through approx 64% of SOP due to nominations in excess of operational capacity; 334,484 Dths
· STA 315 (Segment 315 BH) - through approx 55% of SOP due to nominations in excess of operational capacity; 343,704 Dths
· STA 317 (Segment 317 BH) - through approx 25% of SOP due to nominations in excess of operational capacity; 76,516 Dths
· STA 321 (Segment 321 FH) - through approx 95% of SOP due to nominations in excess of operational capacity; 1,007,558 Dths
· STA 325 (Segment 324 FH) - through approx 56% of SOP due to nominations in excess of operational capacity; 173,562 Dths
· MLV 330 (Segment 324 FH) - through approx 39% of SOP due to nominations in excess of operational capacity; 103,241 Dths
· MLV 336 East (Segment 336 FH) - through 100% of SOP due to nominations in excess of operational capacity; 4,804 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP due to nominations in excess of operational capacity; 163,275 Dths
· Z5hc North (Segment 299 FH) - through approx 96% of SOP due to nominations in excess of operational capacity; 530,357 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP due to nominations in excess of operational capacity; 648,212 Dths
· STA 249 (Segment 249 FH) - through 100% of SOP due to nominations in excess of operational capacity; 420,085 Dths
· STA 254 (Segment 249 FH) - through approx 86% of SOP due to nominations in excess of operational capacity; 102,766 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP due to operational concerns; 8,495 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.