Tennessee Gas Pipeline Notice 395734

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  09/04/2025 3:16:23PM Notice End Date/Time:  09/05/2025 9:00:00am
Post Date/Time:  9/4/2025 3:16:23 PM Notice ID: 395734
Reqrd Rsp:  1 Rsp Date:  09/04/2025
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

TGP - Outage Impact Report Seven Day Forecast (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(9/8)

Tuesday

(9/9)

Wednesday

(9/10)

Thursday

(9/11)

Friday

(9/12)

Saturday

(9/13)

Sunday

(9/14)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409

(Donna Line) (segment 490 FH)

 

564

 

564

 

564

 

564

 

564

 

564

 

564

 

564

 

MLV 406

(segment 406 BH)

 

456

406

(50)

406

(50)

406

(50)

406

(50)

406

(50)

 

456

 

456

MLV 405-1 to MLV 406-1: Immediate Anomaly Remediation (8/26/2025 -

9/12/2025)

Station 1

(segment 101 BH)

 

400

 

400

 

400

 

400

 

400

 

400

 

400

 

400

 

Station 9

(segment 109 BH)

 

1,028

 

1,028

445

(583)

 

1,028

445

(583)

 

1,028

 

1,028

 

1,028

MLV 17-2S to MLV 9-2D: Pig Runs - Cleaning / Gauge (M) (9/9/2025) MLV 17-2S to MLV 9-2D: Pig Runs - MFL (M) (9/11/2025)

Station 25

(segment 125 FH)

 

714

700

(14)

700

(14)

700

(14)

565

(149)

700

(14)

700

(14)

700

(14)

MLV 25-3 to MLV 32-3: Pig Run - Maintenance (9/11/2025) Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 40 South

(segment 132 FH)

 

912

 

562

(350)

 

562

(350)

 

562

(350)

 

587

(325)

 

587

(325)

 

587

(325)

 

587

(325)

MLV 39-3 to MLV 40-3S: Class Change (9/9/2025 - 9/22/2025)

Carthage Lateral

(segment 700 FH)

 

323

 

323

215

(108)

 

323

 

323

 

323

 

323

 

323

MLV 706-1 to MLV 700-1: Pig Run - Maintenance (M) (9/9/2025)

Station 40 KN South (segment 501

FH)

 

268

 

268

 

268

 

268

 

268

 

268

 

268

 

268

Sta 40: HP Replacement - 500C1 Mod (9/4/2025 - 9/10/2025)

 

 

Station 47

(segment 143 FH)

 

 

 

1,222

 

 

 

865

(357)

 

 

 

865

(357)

 

 

 

750

(472)

 

 

 

865

(357)

 

 

 

1215

(7)

 

 

 

1215

(7)

 

 

 

1215

(7)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-1AT to MLV 49-1: Anomaly Remediation (1/6/2025 - 10/31/2025)

MLV 49-1 to MLV 50-1: Anomaly Remediation (3/4/2025 - 10/31/2025) MLV 53-2BREH to MLV 53-2BR: Special Permit Replacement (9/12/2025 - 10/15/2025)

MLV 53-3BR to MLV 54-3BL: HydroTest (8/25/2025 - 10/4/2025)

Sta 47: Annual ESD Test (9/10/2025)

Sta 54 Greenville: Annual ESD Test & Maintenance (9/8/2025 - 9/11/2025)

Station 63

(segment 163 FH)

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

Station 823

(segment 823 BH)

 

686

 

686

515

(171)

515

(171)

515

(171)

 

686

 

686

 

686

Station 827 (Alexandria): Station Recycle Valve (9/9/2025 - 9/11/2025)

Station 834

(segment 834 BH)

 

679

670

(9)

670

(9)

670

(9)

670

(9)

670

(9)

670

(9)

670

(9)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

 

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,798

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1730

(68)

 

 

 

1730

(68)

Sta 530: Unit 1A - Bearings (8/25/2025 - 9/26/2025) Sta 530: Unit 1B - Bearings (8/26/2025 - 9/26/2025)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 4A - Piston (8/25/2025 - 9/19/2025)

Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 9/12/2025)

Sta 534: Unit 7A - Startup Sequence (5/20/2025 - 9/26/2025)

MLV 548

(segment 542 BH)

 

1,597

1375

(222)

1375

(222)

1375

(222)

1375

(222)

1375

(222)

1560

(37)

1560

(37)

Sta 546: Unit 1A - Engine and Compressor Overhaul (8/11/2025 - 10/17/2025)

Station 860

(segment 548 BH)

 

1,516

 

1275

(241)

 

1275

(241)

 

1275

(241)

 

1275

(241)

 

1275

(241)

 

1500

(16)

 

1500

(16)

Sta 550: Unit 2A - Compressor Overhaul (8/25/2025 - 10/17/2025)

Sta 555 Collinwood: Annual ESD Test & Maintenance (9/8/2025 - 9/12/2025) Sta 555: Unit 1B - Vibration System Upgrade (9/8/2025 - 9/12/2025)

 

 

Station 860 North (Segment 860 BH)

 

 

 

1,793

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1705

(88)

 

 

 

1705

(88)

MLV 560-2 to MLV 561-2: Class Change Pipe Replacement (6/9/2025 - 9/16/2025)

Sta 563: Unit 1A - Annual Inspection & Safety Device Check (9/11/2025 - 9/12/2025)

Sta 563: Unit 2A - Overhaul Inspection & Safety Device Check (9/8/2025 - 9/11/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 -

12/31/2025)

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

2,645

 

 

 

 

 

 

2155

(490)

 

 

 

 

 

 

2120

(525)

 

 

 

 

 

 

2120

(525)

 

 

 

 

 

 

2165

(480)

 

 

 

 

 

 

2260

(385)

 

 

 

 

 

 

2260

(385)

 

 

 

 

 

 

2280

(365)

MLV 101-5 to MLV 102-5: Class Change Pipe Replacement (7/30/2025 - 9/10/2025)

MLV 106-1D to MLV 110-7: Make Piggable Valve MLV 107-7, MLV 109-7

Replacements & Adding MLV 109-7A (M) (9/3/2025 - 9/30/2025) MLV 870-2 to MLV 870-2R: Anomaly Remediation (9/9/2025 - 9/14/2025) MLV 93-3 to MLV 94-3: HDD River Crossing Replacement (7/14/2025 -

9/13/2025)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #7 (4/14/2025 - 10/17/2025)

Sta 87: Unit 1D - Oil Cooler Cleaning/Repair (9/2/2025 - 9/24/2025) Sta 87: Unit 1E - Turbocharger Replacement (9/8/2025 - 10/10/2025) Sta 871: Unit 3A - Engine Inspection (8/22/2025 - 9/19/2025)

Sta 875: Unit 1A - 4K/8K Inspection (9/9/2025 - 9/11/2025)

Station 114

(segment 114 BH)

 

920

780

(140)

780

(140)

780

(140)

780

(140)

780

(140)

780

(140)

780

(140)

Sta 119A: Rocky Fork: Force Majeure - Unit 1A (8/29/2025 - TBD)

 

Station 204

(Segment 204 BH)

 

 

1,827

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

MLV 216-2 to MLV 216-2A: Class Change Replacement (8/12/2025 - 9/9/2025) Sta 204: Unit 10A - Turbo Housing (9/8/2025 - 9/11/2025)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-204 (8/5/2025 10/19/2025)

Station 219 South (Segment 217

BH)

 

1,638

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-217 (8/4/2025 10/19/2025)

Station 245

(segment 245 FH)

 

997

855

(142)

855

(142)

855

(142)

855

(142)

855

(142)

925

(72)

925

(72)

Sta 241: Unit 3A - C3 Cooper Upgrade (9/8/2025 - 9/27/2025) Sta 245: Unit 1C - Engine Exchange (9/8/2025 - 9/12/2025)


TGP - Outage Impact Report Seven Day Forecast (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(9/8)

Tuesday

(9/9)

Wednesday

(9/10)

Thursday

(9/11)

Friday

(9/12)

Saturday

(9/13)

Sunday

(9/14)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 254

(segment 256 FH)

 

1,213

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

Sta 254: Unit 4A - Replace Power Cylinder Head (5/16/2025 - 11/1/2025)

Sta. 254: Bldg A Stack Replacement and Unit Upgrades (7/14/2025 - 11/1/2025)

Station 261 Discharge East (segment 261

FH)

 

941

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

Sta 261: Unit 1C - Valve replacement & Solar Commissioning (9/8/2025 - 9/19/2025)

Station 267 South (segment 266

FH)

 

469

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Fitchburg Lat to Gloucester (segment 268

FH)

 

202

 

202

 

185

(17)

 

185

(17)

 

185

(17)

 

185

(17)

 

185

(17)

 

185

(17)

MLV 270-1A to MLV 270-101.1R: Anomaly Remediation (9/9/2025 - 9/14/2025)

Station 307

(segment 307 BH)

 

1,148

1045

(103)

1045

(103)

760

(388)

1045

(103)

1045

(103)

 

1,148

 

1,148

Sta 307: Unit 2A - Engine Maintenace (9/8/2025 - 9/12/2025) Sta 307: Unit 3A - Engine Maintenace (9/8/2025 - 9/12/2025)

Station 310 Smethport: Annual ESD Test (9/10/2025)

Station 315

(segment 315 BH)

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

Station 317

(segment 317 BH)

 

1,579

 

1,579

1555

(24)

1555

(24)

1555

(24)

1555

(24)

 

1,579

 

1,579

Sta 317: Unit 1B - Engine Maintenace (9/9/2025 - 9/12/2025)

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

Station 405 HC Line (segment 299

FH)

 

803

 

803

 

803

 

803

 

803

 

803

 

803

 

803

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

TGP - Outage Impact Report September 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/1 - 9/7)

Week 2

(9/8 - 9/14)

Week 3

(9/15 - 9/21)

Week 4

(9/22 - 9/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

564

 

 

 

564

 

564

 

MLV 406

(segment 406 BH)

 

456

 

 

430

(26)

430

(26)

MLV 401-1 to MLV 402-1: Immediate Anomaly Remediation (9/15/2025 - 10/3/2025)

MLV 403-1 to MLV 404-1: Anomaly Remediation (M) (9/15/2025 - 10/3/2025)

Station 1

(segment 101 BH)

 

400

 

 

 

400

 

400

 

Station 9

(segment 109 BH)

 

1,028

 

 

 

1,028

 

1,028

 

Station 17

(segment 117 FH)

 

758

 

 

753

(5)

 

758

MLV 17-1D to MLV 20-1A: Pig Run - Cleaning 9/15/25 (9/15/2025) MLV 17-1D to MLV 20-1A: Pig Run - Gauge 9/16/25 (9/16/2025)

MLV 17-1D to MLV 20-1A: Pig Run - MFL-A 9/17/25 (9/17/2025)

Station 25

(segment 125 FH)

 

714

 

 

700

(14)

700

(14)

Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 40 South

(segment 132 FH)

 

912

 

 

 

587

(325)

 

587

(325)

MLV 39-2 to MLV 40-2S: Class Change (9/23/2025 - 10/6/2025) MLV 39-3 to MLV 40-3S: Class Change (9/9/2025 - 9/22/2025)

 

 

 

 

Station 47

(segment 143 FH)

 

 

 

 

 

1,222

 

 

 

 

 

 

1140

(82)

 

 

 

 

1140

(82)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-1AT to MLV 49-1: Anomaly Remediation (1/6/2025 - 10/31/2025)

MLV 49-1 to MLV 50-1: Anomaly Remediation (3/4/2025 - 10/31/2025) MLV 53-2BREH to MLV 53-2BR: Special Permit Replacement (9/12/2025 - 10/15/2025)

MLV 53-3BR to MLV 54-3BL: HydroTest (8/25/2025 - 10/4/2025)

MLV 54-1D TO MLV 63-1S: Pig Runs - Cleaning / Gauge 9/16/25 (9/16/2025) MLV 54-1D TO MLV 63-1S: Pig Runs - CLP / IMU 9/18/25 (9/18/2025)

MLV 54-1D TO MLV 63-1S: Pig Runs - MFL-C 9/23/25 (9/23/2025) MLV 54-1D TO MLV 63-1S: Pig Runs - MFL-C 9/25/25 (9/25/2025)

Station 63

(segment 163 FH)

 

1,233

 

 

 

1,233

 

1,233

 

Station 823

(segment 823 BH)

 

686

 

 

 

686

 

686

 

Station 834

(segment 834 BH)

 

679

 

 

670

(9)

670

(9)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

Station 847

(segment 847 BH)

 

284

 

 

 

215

(69)

 

284

MLV 838-1 TO MLV 834-1: Pig Re-Runs - ROSEN EMAT 9/18 (M) (9/18/2025) MLV 838-1 TO MLV 834-1: Pig Runs - Cleaning 9/15 - 9/17 (M) (9/15/2025 - 9/17/2025)

Station 527

(segment 527 BH)

 

2,392

 

 

 

2,392

2380

(12)

MLV 530-1 TO MLV 531-1: Anomaly Remedition (9/22/2025 - 9/27/2025)

 

Station 534 South of Pool (segment 530 BH)

 

 

1,798

 

 

 

 

1730

(68)

 

 

1730

(68)

Sta 530: Unit 1A - Bearings (8/25/2025 - 9/26/2025) Sta 530: Unit 1B - Bearings (8/26/2025 - 9/26/2025)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 4A - Piston (8/25/2025 - 9/19/2025)

Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 7A - Startup Sequence (5/20/2025 - 9/26/2025)

MLV 548

(segment 542 BH)

 

1,597

 

 

1560

(37)

1560

(37)

Sta 546: Unit 1A - Engine and Compressor Overhaul (8/11/2025 - 10/17/2025)

Station 860

(segment 548 BH)

 

1,516

 

 

1500

(16)

1280

(236)

Sta 550: Unit 2A - Compressor Overhaul (8/25/2025 - 10/17/2025) Sta 555: Unit 1B - Install New PLC Program (9/22/2025 - 9/26/2025)

 

Station 860 North (Segment 860 BH)

 

 

1,793

 

 

 

 

1705

(88)

 

 

1780

(13)

MLV 560-2 to MLV 561-2: Class Change Pipe Replacement (6/9/2025 - 9/16/2025)

MLV 861-1 to MLV 862-1: Install New 30" Valve 861-1A (9/24/2025 - 10/4/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 - 12/31/2025)


 

TGP - Outage Impact Report September 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/1 - 9/7)

Week 2

(9/8 - 9/14)

Week 3

(9/15 - 9/21)

Week 4

(9/22 - 9/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

 

2,645

 

 

 

 

 

 

 

 

 

1965

(680)

 

 

 

 

 

 

 

1630

(1015)

MLV 106-1D to MLV 110-7: Make Piggable Valve MLV 107-7, MLV 109-7

Replacements & Adding MLV 109-7A (M) (9/3/2025 - 9/30/2025) MLV 108-3 to MLV 109-3: Special Permit Pipe Replacement (9/24/2025 -

10/15/2025)

MLV 867-2 to MLV 868-2: Anomaly Remediation (9/20/2025 - 10/25/2025) MLV 868-2 to MLV 869-2: Anomaly Remediation (9/15/2025 - 9/20/2025) MLV 96-5 to MLV 102-5: Pig Runs - Cleaning / Gauge 9/25/25 (9/25/2025) Sta 106 Clay City: Upgrade B Building Jacket Water System (9/15/2025 - 10/3/2025)

Sta 106: Unit 1D - Solar 4K/8K Inspection (9/22/2025 - 9/26/2025)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #7 (4/14/2025 - 10/17/2025) Sta 87: Unit 1D - Oil Cooler Cleaning/Repair (9/2/2025 - 9/24/2025)

Sta 87: Unit 1E - Turbocharger Replacement (9/8/2025 - 10/10/2025) Sta 871: Unit 3A - Engine Inspection (8/22/2025 - 9/19/2025)

Sta 96: Unit 2D - Compressor Valves (9/22/2025 - 9/26/2025)

Station 114

(segment 114 BH)

 

920

 

 

865

(55)

 

920

Sta 114: Station Outage - C Units 1-3 - Replace Diodes all C Units (9/18/2025)

 

 

 

Station 204

(Segment 204 BH)

 

 

 

 

1,827

 

 

 

 

 

1300

(527)

 

 

 

1300

(527)

MLV 213-2A to MLV 214-2: Special Permit Replacement (9/23/2025 - 10/31/2025)

Sta 204: Scrubber Filter (9/22/2025 - 9/24/2025)

Sta 204: Unit 3A - Turbo Housing (9/15/2025 - 9/16/2025) Sta 209 Cambridge: Scrubber Filter (9/25/2025 - 9/27/2025)

Sta 209: Unit 5A - Crankcase Inspection (9/22/2025 - 9/25/2025) Sta 209: Unit 7A - Install F/W Turbo (9/15/2025 - 9/18/2025)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-204 (8/5/2025 -

10/19/2025)

Station 219 South (Segment 217

BH)

 

1,638

 

 

 

1438

(200)

 

1438

(200)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-217 (8/4/2025 - 10/19/2025)

Station 245

(segment 245 FH)

 

997

 

 

925

(72)

925

(72)

Sta 241: Unit 3A - C3 Cooper Upgrade (9/8/2025 - 9/27/2025)

 

 

Station 254

(segment 256 FH)

 

 

 

1,213

 

 

 

 

615

(598)

 

 

710

(503)

MLV 254-1 to MLV 261-1: Pig Run - Maintenance (9/23/2025) MLV 254-2 to MLV 261-2: Pig Run - Maintenance (9/24/2025) MLV 254-3 to MLV 258-3: Pig Run - Maintenance (9/25/2025) Sta 254: Unit 2B - HIM Upgrade (9/15/2025 - 9/16/2025)

Sta 254: Unit 4A - Replace Power Cylinder Head (5/16/2025 - 11/1/2025) Sta. 254: Bldg A Stack Replacement and Unit Upgrades (7/14/2025 - 11/1/2025)

N Hampton Lat (segment 280

FH)

 

40

 

 

 

40

30

(10)

Sta 260A Southwick: Annual ESD Test (9/23/2025)

Station 261 Discharge East (segment 261

FH)

 

941

 

 

 

910

(31)

 

585

(356)

Sta 261: Unit 1C - Valve replacement & Solar Commissioning (9/8/2025 - 9/19/2025)

Sta 264 Charlton: Annual ESD Test (9/25/2025)

Station 267 South (segment 266

FH)

 

469

 

 

 

312

(157)

 

312

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Fitchburg Lat to Gloucester (segment 268

FH)

 

202

 

 

 

140

(62)

 

202

MLV 267-1A to MLV 268-1: Anomaly Remediation (9/15/2025 - 9/20/2025)

Station 307

(segment 307 BH)

 

1,148

 

 

 

1,148

960

(188)

Sta 307 (Pigeon ): Annual ESD Test (9/22/2025 - 9/26/2025)

Sta 307: Unit 6A - Protective Device Checks (9/22/2025 - 9/26/2025)

Station 313 Discharge (segment 399

FH)

 

806

 

 

 

806

 

408

(398)

Sta 313: Unit 1C - Capacitor Replacement (9/22/2025 - 9/26/2025)

Station 315

(segment 315 BH)

 

1,854

 

 

1695

(159)

 

1,854

Sta 315: Unit 1B - Water Wash & Borescope (9/16/2025)

Sta 315: Unit 2A - Water Wash & Borescope (9/17/2025 - 9/18/2025)

 

Station 317

(segment 317 BH)

 

 

1,579

 

 

 

1550

(29)

 

1235

(344)

MLV 317-1 to MLV 318-1: Hot Tap for New Meter (Meter: Port Royal PIN: 57162)

(M) (9/16/2025 - 9/17/2025)

MLV 317-2 to MLV 318-2: Hot Tap for New Meter (Meter: Port Royal PIN: 57162)

(M) (9/18/2025 - 9/19/2025)

Sta 317: Units 1C - Water Wash (9/22/2025 - 9/23/2025)


 

TGP - Outage Impact Report September 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/1 - 9/7)

Week 2

(9/8 - 9/14)

Week 3

(9/15 - 9/21)

Week 4

(9/22 - 9/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 321

(segment 321 FH)

 

2,102

 

 

1240

(862)

1240

(862)

MLV 320-2A to MLV 322-2: Drip Removal 321-2-1 (M) (9/15/2025 - 9/30/2025)

MLV 324

(segment 324 FH)

 

1,767

 

 

 

1,767

 

1,767

 

Station 405 HC Line (segment 299

FH)

 

803

 

 

 

803

 

803

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

TGP - Outage Impact Report October 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/29 - 10/5)

Week 2

(10/6 - 10/12)

Week 3

(10/13 - 10/19)

Week 4

(10/20 - 10/26)

Week 5

(10/27 - 11/2)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Station 409A (Alamo) (segment 492 FH)

 

 

274

 

 

274

 

 

274

 

 

134

(140)

 

 

274

 

 

274

MLV 409A-901 to MLV 409A-902: Pig Run - Cleaning (M) 10/14/25 (10/14/2025)

MLV 409A-901 to MLV 409A-902: Pig Run - Cleaning (M) 10/15/25 (10/15/2025)

MLV 409A-901 to MLV 409A-902: Pig Run - MFL-A 10/16/25 (M) (10/16/2025)

Station 409 (Donna Line) (segment 490

FH)

 

564

 

504

(60)

 

564

 

564

 

564

 

564

Sta 409: Unit 3A - Engine Inspection (9/29/2025 - 10/3/2025)

 

 

MLV 406

(segment 406 BH)

 

 

 

456

 

 

430

(26)

 

 

 

456

 

 

211

(245)

 

 

 

456

 

 

 

456

MLV 400-1 to MLV 409-1: Pig Run - Maintenance Cleaning 10/14/25 (M) (10/14/2025)

MLV 400-2 to MLV 409-2: Pig Run - Maintenance Cleaning 10/16/25 (M) (10/16/2025)

MLV 401-1 to MLV 402-1: Immediate Anomaly Remediation (9/15/2025 - 10/3/2025)

MLV 403-1 to MLV 404-1: Anomaly Remediation (M) (9/15/2025 - 10/3/2025)

Station 1

(segment 101 BH)

 

400

 

400

 

400

 

400

 

400

 

400

 

 

 

 

Station 9

(segment 109 BH)

 

 

 

 

1,028

 

 

 

 

1,028

 

 

 

 

845

(183)

 

 

 

 

1,028

 

 

 

 

638

(390)

 

 

 

 

1,028

MLV 5-2 to MLV 1-2D: Pig Runs - Maintenance Cleaning 10/23 (M) (10/23/2025) MLV 9-1S and MLV 1-1D: Pig Run - Maintenance Cleaning 10/21 (M) (10/21/2025)

MLV 9-2 to MLV 5-2: Pig Runs - Maintenance Cleaning 10/23 (M) (10/23/2025) MLV 9-3 to MLV 4-3: Pig Runs - Maintenance Cleaning 10/22 (M) (10/22/2025) Sta 11A: Annual ESD Test (10/7/2025)

Sta 11A: Unit 1A - Safety Devices (10/20/2025 - 10/22/2025)

Station 17

(segment 117 FH)

 

758

 

758

 

758

753

(5)

753

(5)

753

(5)

MLV 17-1D to MLV 20-1A: Anomaly Remediation (10/13/2025 - 10/31/2025)

Station 25

(segment 125 FH)

 

714

700

(14)

700

(14)

700

(14)

700

(14)

700

(14)

MLV 26-1 Relocation: Highway 59 Widening (10/6/2025 - 11/2/2025)

MLV 26-1 to MLV 27-1: Install Road Casing (10/6/2025 - 11/2/2025) Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 40 South

(segment 132 FH)

 

912

 

777

(135)

 

777

(135)

 

777

(135)

 

637

(275)

 

747

(165)

MLV 32-2D TO MLV 40-2S: Pig Runs - Maintenance (10/28/2025) MLV 32-3D to MLV 40-3S: Pig Runs - Maintenance (10/21/2025) MLV 39-1 to MLV 40-1S: Class Change (10/7/2025 - 10/20/2025)

MLV 39-2 to MLV 40-2S: Class Change (9/23/2025 - 10/6/2025)

Station 40 KN South (segment 501

FH)

 

268

 

268

 

268

 

268

 

268

 

175

(93)

Sta 500-1 to Sta 823 (MLV 507-1): Pig Run - Maintenance (M) (10/29/2025)

 

 

 

Station 47

(segment 143 FH)

 

 

 

 

1,226

 

 

 

 

1219

(7)

 

 

 

 

1219

(7)

 

 

 

 

1215

(11)

 

 

 

 

1220

(6)

 

 

 

 

1147

(79)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-1AT to MLV 49-1: Anomaly Remediation (1/6/2025 - 10/31/2025) MLV 47-2A to MLV 48-2: Pipe Replacement (M) (10/13/2025 - 10/24/2025)

MLV 47-3A to MLV 48-3: Pipe Replacement (10/27/2025 - 11/7/2025) MLV 49-1 to MLV 50-1: Anomaly Remediation (3/4/2025 - 10/31/2025)

MLV 53-2BREH to MLV 53-2BR: Special Permit Replacement (9/12/2025 - 10/15/2025)

MLV 53-3BR to MLV 54-3BL: HydroTest (8/25/2025 - 10/4/2025)

Sta 47: Unit 1D - Flush & Clean Cooling Systems (10/20/2025 - 10/24/2025) Sta 47: Unit 2D - Flush & Clean Cooling Systems (10/20/2025 - 10/24/2025)

 

 

 

Station 63

(segment 163 FH)

 

 

 

 

1,233

 

 

 

1104

(129)

 

 

 

1038

(195)

 

 

 

1038

(195)

 

 

 

1088

(145)

 

 

 

848

(385)

MLV 63-4D to MLV 71-4S: Pig Runs - Caliper / IMU 10/30/25 (10/30/2025) MLV 63-4D to MLV 71-4S: Pig Runs - Cleaning / Gauge 10/28/25 (10/28/2025) MLV 83-3 to MLV 83-3B: Install Backpressure Regulator (10/16/2025 - 10/31/2025)

MLV 83-4 to MLV 83-4B: Install Backpressure Regulator (10/1/2025 - 10/15/2025)

MLV 84-4 to MLV 85-4: Class Change Pipe Replacement (10/6/2025 - 10/25/2025)

Station 823

(segment 823 BH)

 

686

 

686

 

686

 

686

 

686

 

686

 

Station 834

(segment 834 BH)

 

679

590

(89)

670

(9)

670

(9)

670

(9)

664

(15)

Sta 834: Annual ESD Test (9/29/2025)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

Station 847

(segment 847 BH)

 

284

 

284

 

284

 

160

(124)

 

160

(124)

 

284

MLV 856-1 to MLV 860-1: Pig Runs - Cal / IMU 10/21/25 (10/21/2025)

MLV 856-1 to MLV 860-1: Pig Runs - Cleaning / Gauge 10/16/25 (10/16/2025) MLV 856-1 to MLV 860-1: Pig Runs - MFL-C 10/23/25 (10/23/2025)

Station 823 Muskrat Line (segment 509

BH)

 

242

 

200

(42)

 

242

 

242

 

242

 

242

Sta 823 to MLV 516: Pig Run - Maintenance (M) (10/1/2025)

Station 534 South of Pool (segment 530

BH)

 

1,798

 

1776

(22)

 

1776

(22)

 

1776

(22)

 

1776

(22)

 

1776

(22)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)


 

TGP - Outage Impact Report October 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/29 - 10/5)

Week 2

(10/6 - 10/12)

Week 3

(10/13 - 10/19)

Week 4

(10/20 - 10/26)

Week 5

(10/27 - 11/2)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

Station 542

(segment 539 BH)

 

 

 

1,719

 

 

 

1,719

 

 

 

1380

(339)

 

 

 

1380

(339)

 

 

 

845

(874)

 

 

 

845

(874)

MLV 540-1 to MLV 540-1A: Anomaly Remediation (10/10/2025 - 10/20/2025)

MLV 540-1 to MLV 540-1A: Shallow Pipe Lowering (10/10/2025 - 10/17/2025) MLV 540-2 to MLV 540-2A: Shallow Pipe Lowering (10/23/2025 - 10/31/2025) MLV 541-1 to MLV 541-1A: Anomaly Remediation (10/10/2025 - 10/20/2025)

MLV 548

(segment 542 BH)

 

1,597

1480

(117)

1480

(117)

1480

(117)

1580

(17)

1562

(35)

Sta 546: Unit 1A - Engine and Compressor Overhaul (8/11/2025 - 10/17/2025) Sta 546: Unit 4A - Engine and Compressor Overhaul (9/29/2025 - 11/7/2025)

 

 

 

Station 860

(segment 548 BH)

 

 

 

 

1,516

 

 

 

1500

(16)

 

 

 

1390

(126)

 

 

 

1440

(76)

 

 

 

1245

(271)

 

 

 

1500

(16)

Sta 550 Hamilton: Annual ESD Test & Maintenance (10/23/2025) Sta 550: A building - Replace SLC 500 Remote PLC (10/23/2025) Sta 550: Unit 2A - Compressor Overhaul (8/25/2025 - 10/17/2025) Sta 550: Unit 3A - Engine Overhaul (10/13/2025 - 11/15/2025)

Sta 550: Unit 3A - Turbocharger Exchange (10/27/2025 - 11/7/2025) Sta 555: Unit 1A - Engine Maintenance (10/6/2025 - 10/11/2025) Sta 555: Unit 2A - Engine Maintenance (10/6/2025 - 10/11/2025) Sta 555: Unit 5A - Engine Maintenance (10/6/2025 - 10/11/2025)

Sta 555: Unit 6A - Engine Maintenance (10/6/2025 - 10/11/2025)

Station 860 North (Segment 860

BH)

 

1,793

 

1780

(13)

 

1780

(13)

 

1780

(13)

 

1780

(13)

 

1780

(13)

MLV 861-1 to MLV 862-1: Install New 30" Valve 861-1A (9/24/2025 - 10/4/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 - 12/31/2025)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2,645

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1830

(815)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2195

(450)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1915

(730)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2420

(225)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2420

(225)

MLV 106-1 to MLV 111-7: Pig Runs - AFD Combo 10/14/25 (10/14/2025)

MLV 106-1 to MLV 111-7: Pig Runs - Cleaning / Gauge 10/9/25 (10/9/2025) MLV 106-1 to MLV 111-7: Pig Runs - EMAT 10/16/25 (10/16/2025)

MLV 106-1D to MLV 110-7: Make Piggable Valve MLV 107-7, MLV 109-7

Replacements & Adding MLV 109-7A (M) (9/3/2025 - 9/30/2025)

MLV 108-2 to MLV 109-2: Special Permit Pipe Replacement (M) (11/1/2025 - 11/30/2025)

MLV 108-3 to MLV 109-3: Special Permit Pipe Replacement (9/24/2025 - 10/15/2025)

MLV 109-2 to 109-2A: Special Permit Pipe Replacement (10/16/2025 - 10/31/2025)

MLV 109-3 to MLV 109-3A: Class Change Pipe Replacement (10/16/2025 - 10/31/2025)

MLV 867-2 to MLV 868-2: Anomaly Remediation (9/20/2025 - 10/25/2025) MLV 871-2A to MLV 872-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 871-2L to MLV 871-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 872-2 to MLV 873-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 873-2 to MLV 873-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 90-3 to MLV 91-3: HDD River Crossing Replacement (10/16/2025 - 10/27/2025)

MLV 96-5 to MLV 102-5: Pig Runs - AFD Combo 10/2/25 (10/2/2025)

MLV 96-5 to MLV 102-5: Pig Runs - Caliper 9/30/25 (9/30/2025) MLV 96-5 to MLV 102-5: Pig Runs - EMAT 10/7/25 (10/7/2025)

Sta 106 Clay City: Upgrade B Building Jacket Water System (9/15/2025 - 10/3/2025)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #7 (4/14/2025 - 10/17/2025) Sta 110 Morehead: Unit Inspections (10/20/2025 - 10/24/2025)

Sta 87 Portland: Annual ESD Test (10/14/2025 - 10/15/2025) Sta 87: Unit 1E - Turbocharger Replacement (9/8/2025 - 10/10/2025)

Sta 87: Unit 2E - Turbocharger Replacement (10/13/2025 - 11/26/2025)

 

Station 114

(segment 114 BH)

 

 

920

 

 

920

 

850

(70)

 

 

920

 

700

(220)

 

840

(80)

Sta 114: Installation of Unit Valves (10/24/2025 - 10/25/2025) Sta 114: Unit 1C - Complete Intallation of Unit Valves (10/27/2025) Sta 114: Unit 2C - Complete Installation of Unit Valves (10/29/2025)

Sta 118A Tyler Mountain: Annual ESD Test (10/27/2025 - 10/29/2025)

Sta 118A: Unit 1A - Turbine Exchange (10/6/2025 - 10/11/2025)

 

 

Station 204

(Segment 204 BH)

 

 

 

1,827

 

 

 

1300

(527)

 

 

 

1300

(527)

 

 

 

1300

(527)

 

 

 

1797

(30)

 

 

 

1411

(416)

MLV 209-4 to MLV 204-4: Pig Runs - Cleaning / Gauge 10/30/25 (10/30/2025) MLV 213-2A to MLV 214-2: Special Permit Replacement (9/23/2025 - 10/31/2025)

Sta 209: Unit 4A - Packing & Starting Air Valves (9/29/2025 - 10/2/2025) Sta 209: Unit 7A - Packing (10/6/2025 - 10/9/2025)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-204 (8/5/2025 - 10/19/2025)

Station 219 South (Segment 217

BH)

 

1,638

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1,638

 

1,638

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-217 (8/4/2025 - 10/19/2025)

Station 237 West

(segment 233 FH)

 

475

0

(475)

0

(475)

 

475

 

475

 

475

MLV 236-1 to MLV 237-1BR: Special Permit Replacement (M) (9/29/2025 - 10/10/2025)

Station 245

(segment 245 FH)

 

997

 

850

(147)

 

835

(162)

 

835

(162)

 

850

(147)

 

850

(147)

Sta 241: Unit 1A - Engine Maintenance (10/6/2025 - 10/10/2025) Sta 241: Unit 1B - 2K Maintenance (10/7/2025 - 10/8/2025)

Sta 241: Unit 2A - Engine Maintenance (10/13/2025 - 10/17/2025)

Sta 249: Unit 1A - Aftercooler Upgrade (10/1/2025 - 10/31/2025)


 

TGP - Outage Impact Report October 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/29 - 10/5)

Week 2

(10/6 - 10/12)

Week 3

(10/13 - 10/19)

Week 4

(10/20 - 10/26)

Week 5

(10/27 - 11/2)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 254

(segment 256 FH)

 

1,213

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

Sta 254: Unit 4A - Replace Power Cylinder Head (5/16/2025 - 11/1/2025)

Sta. 254: Bldg A Stack Replacement and Unit Upgrades (7/14/2025 - 11/1/2025)

Station 261 Discharge East (segment 261

FH)

 

941

 

941

 

930

(11)

 

590

(351)

 

941

 

941

Sta 261 Agawam: Annual ESD Test (M) (10/13/2025 - 10/15/2025) Sta 261: Unit 4A - Compressor Rod Packing (M) (10/6/2025 - 10/9/2025)

Station 267 South (segment 266

FH)

 

469

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Station 307

(segment 307 BH)

 

1,150

 

1,150

965

(185)

 

1,150

 

1,150

 

1,150

Sta 303A: Unit 1A - Water Wash (10/7/2025 - 10/8/2025)

Station 315

(segment 315 BH)

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

Station 321

(segment 321 FH)

 

2,102

 

1145

(957)

 

2,102

 

2,102

 

2,102

 

2,102

MLV 320-2A to MLV 322-2: Drip Removal 321-2-1 (M) (9/15/2025 - 9/30/2025)

Sta 323: Unit 1A - Drive Modernization Upgrade (9/29/2025 - 10/3/2025) Sta. 323A Lackawaxen: Annual ESD Testing (9/29/2025 - 9/30/2025)

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

Station 405 HC Line (segment 299

FH)

 

803

 

803

 

803

 

690

(113)

 

803

 

803

Sta 405A: Unit 1A - 8K Solar Turbine Borescope Inspection (10/15/2025) Sta 405A: Unit 1A - Water Wash (10/14/2025)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

TGP - Outage Impact Report November 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(11/3 - 11/9)

Week 2

(11/10 - 11/16)

Week 3

(11/17 - 11/23)

Week 4

(11/24 - 11/30)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

585

 

585

 

585

 

585

 

585

 

Station 1

(segment 101 BH)

 

438

 

438

 

438

 

438

 

438

 

Station 9

(segment 109 BH)

 

1,066

 

1,066

 

1,066

 

1,066

 

1,066

 

Station 25

(segment 125 FH)

 

1,101

1041

(60)

1041

(60)

1041

(60)

1041

(60)

MLV 26-2 Relocation: Highway 59 Widening (11/3/2025 - 11/30/2025) Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 47

(segment 143 FH)

 

1,354

1275

(79)

1275

(79)

1275

(79)

1349

(5)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-3A to MLV 48-3: Pipe Replacement (10/27/2025 - 11/7/2025)

MLV 47-4A to MLV 48-4: Pipe Replacement (M) (11/10/2025 - 11/21/2025)

Station 63

(segment 163 FH)

 

1,287

887

(400)

1255

(32)

 

1,287

 

1,287

MLV 63-4D to MLV 71-4S: Pig Runs - EMAT 11/6/25 (11/6/2025) MLV 63-4D to MLV 71-4S: Pig Runs - MFL-C 11/4/25 (11/4/2025)

MLV 71-1D to MLV 77-1A: Pig Re-Runs - MDS 11/12/25 (11/12/2025)

Station 823

(segment 823 BH)

 

759

215

(544)

 

759

 

759

 

759

Sta 827 to Sta 823: Pig Run - Maintenance (M) (11/5/2025) Sta 834 to Sta 827: Maintenance Pig (M) (11/5/2025)

Station 834

(segment 834 BH)

 

733

718

(15)

 

733

 

733

 

733

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

Station 534 South of Pool (segment 530

BH)

 

1,632

 

1610

(22)

 

1610

(22)

 

1610

(22)

 

1610

(22)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

MLV 548

(segment 542 BH)

 

1,771

1736

(35)

 

1,771

 

1,771

 

1,771

Sta 546: Unit 4A - Engine and Compressor Overhaul (9/29/2025 - 11/7/2025)

Station 860

(segment 548 BH)

 

1,697

1681

(16)

1681

(16)

 

1,697

 

1,697

Sta 550: Unit 3A - Engine Overhaul (10/13/2025 - 11/15/2025) Sta 550: Unit 3A - Turbocharger Exchange (10/27/2025 - 11/7/2025)

 

Station 860 North (Segment 860 BH)

 

 

2,028

 

 

2015

(13)

 

 

2015

(13)

 

 

1575

(453)

 

 

2015

(13)

MLV 560-1 to MLV 563-1: HDD River Crossing & MLV 561-1 & MLV 562-1

Replacement (11/17/2025 - 11/21/2025)

Sta 563: Unit 1A - Lube Oil Varnish Installation (11/19/2025 - 11/21/2025) Sta 563: Unit 2A - Lube Oil Varnish Installation (11/17/2025 - 11/19/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 - 12/31/2025)

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

2,775

 

 

 

 

 

 

2395

(380)

 

 

 

 

 

 

2395

(380)

 

 

 

 

 

 

2580

(195)

 

 

 

 

 

 

2580

(195)

MLV 108-2 to MLV 109-2: Special Permit Pipe Replacement (M) (11/1/2025 - 11/30/2025)

MLV 871-2A to MLV 872-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 871-2L to MLV 871-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 872-2 to MLV 873-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 873-2 to MLV 873-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 87-4 to MLV 96-4: Pig Runs - AFD Combo 11/11/25 (11/11/2025)

MLV 87-4 to MLV 96-4: Pig Runs - Caliper 11/6/25 (11/6/2025) MLV 87-4 to MLV 96-4: Pig Runs - Cleaning / Gauge 11/4/25 (11/4/2025)

MLV 87-4 to MLV 96-4: Pig Runs - EMAT 11/13/25 (11/13/2025)

Sta 87: Unit 2E - Turbocharger Replacement (10/13/2025 - 11/26/2025)

Station 114

(segment 114 BH)

 

948

 

948

 

948

 

948

 

948

 

 

 

Station 204

(Segment 204 BH)

 

 

 

1,895

 

 

1463

(432)

 

 

1419

(476)

 

 

1419

(476)

 

 

 

1,895

MLV 209-4 to MLV 204-4: Pig Runs - Cal & IMU 11/04/25 (11/4/2025) MLV 209-4 to MLV 204-4: Pig Runs - MFL-A 11/06/25 (11/6/2025)

MLV 219-4 to MLV 214-4: Pig Run - Cleaning/Gauge 11/11/25 (M) (11/11/2025) MLV 219-4 to MLV 214-4: Pig Run - EMAT 11/20/25 (M) (11/20/2025)

MLV 219-4 to MLV 214-4: Pig Run - IMU/Caliper 11/13/25 (M) (11/13/2025) MLV 219-4 to MLV 214-4: Pig Run - MFL-C 11/18/25 (M) (11/18/2025)

Station 245

(segment 245 FH)

 

1,063

 

1,063

 

1,063

 

1,063

 

1,063

 

Station 261 Discharge East (segment 261

FH)

 

1,045

 

1,045

 

1,045

 

1,045

 

1,045

 


 

TGP - Outage Impact Report November 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(11/3 - 11/9)

Week 2

(11/10 - 11/16)

Week 3

(11/17 - 11/23)

Week 4

(11/24 - 11/30)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 267 South (segment 266

FH)

 

503

 

346

(157)

 

346

(157)

 

346

(157)

 

346

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Station 307

(segment 307 BH)

 

1,202

 

1,202

 

1,202

 

1,202

 

1,202

 

Station 315

(segment 315 BH)

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

MLV 324

(segment 324 FH)

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

Station 405 HC Line (segment 299

FH)

 

827

 

827

 

827

 

827

 

827

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

TSP/TSP Name:  1939164-TENNESSEE GAS PIPELINE Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  09/04/2025 3:16:23PM Notice End Date/Time:  09/05/2025 9:00:00am
Post Date/Time:  9/4/2025 3:16:23 PM Notice ID: 395734
Reqrd Rsp:  1 Rsp Date:  09/04/2025
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  TGP Outage Impact Report
Notice Text:

TGP - Outage Impact Report Seven Day Forecast (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(9/8)

Tuesday

(9/9)

Wednesday

(9/10)

Thursday

(9/11)

Friday

(9/12)

Saturday

(9/13)

Sunday

(9/14)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409

(Donna Line) (segment 490 FH)

 

564

 

564

 

564

 

564

 

564

 

564

 

564

 

564

 

MLV 406

(segment 406 BH)

 

456

406

(50)

406

(50)

406

(50)

406

(50)

406

(50)

 

456

 

456

MLV 405-1 to MLV 406-1: Immediate Anomaly Remediation (8/26/2025 -

9/12/2025)

Station 1

(segment 101 BH)

 

400

 

400

 

400

 

400

 

400

 

400

 

400

 

400

 

Station 9

(segment 109 BH)

 

1,028

 

1,028

445

(583)

 

1,028

445

(583)

 

1,028

 

1,028

 

1,028

MLV 17-2S to MLV 9-2D: Pig Runs - Cleaning / Gauge (M) (9/9/2025) MLV 17-2S to MLV 9-2D: Pig Runs - MFL (M) (9/11/2025)

Station 25

(segment 125 FH)

 

714

700

(14)

700

(14)

700

(14)

565

(149)

700

(14)

700

(14)

700

(14)

MLV 25-3 to MLV 32-3: Pig Run - Maintenance (9/11/2025) Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 40 South

(segment 132 FH)

 

912

 

562

(350)

 

562

(350)

 

562

(350)

 

587

(325)

 

587

(325)

 

587

(325)

 

587

(325)

MLV 39-3 to MLV 40-3S: Class Change (9/9/2025 - 9/22/2025)

Carthage Lateral

(segment 700 FH)

 

323

 

323

215

(108)

 

323

 

323

 

323

 

323

 

323

MLV 706-1 to MLV 700-1: Pig Run - Maintenance (M) (9/9/2025)

Station 40 KN South (segment 501

FH)

 

268

 

268

 

268

 

268

 

268

 

268

 

268

 

268

Sta 40: HP Replacement - 500C1 Mod (9/4/2025 - 9/10/2025)

 

 

Station 47

(segment 143 FH)

 

 

 

1,222

 

 

 

865

(357)

 

 

 

865

(357)

 

 

 

750

(472)

 

 

 

865

(357)

 

 

 

1215

(7)

 

 

 

1215

(7)

 

 

 

1215

(7)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-1AT to MLV 49-1: Anomaly Remediation (1/6/2025 - 10/31/2025)

MLV 49-1 to MLV 50-1: Anomaly Remediation (3/4/2025 - 10/31/2025) MLV 53-2BREH to MLV 53-2BR: Special Permit Replacement (9/12/2025 - 10/15/2025)

MLV 53-3BR to MLV 54-3BL: HydroTest (8/25/2025 - 10/4/2025)

Sta 47: Annual ESD Test (9/10/2025)

Sta 54 Greenville: Annual ESD Test & Maintenance (9/8/2025 - 9/11/2025)

Station 63

(segment 163 FH)

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

1,233

 

Station 823

(segment 823 BH)

 

686

 

686

515

(171)

515

(171)

515

(171)

 

686

 

686

 

686

Station 827 (Alexandria): Station Recycle Valve (9/9/2025 - 9/11/2025)

Station 834

(segment 834 BH)

 

679

670

(9)

670

(9)

670

(9)

670

(9)

670

(9)

670

(9)

670

(9)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

 

 

Station 534 South of Pool (segment 530 BH)

 

 

 

1,798

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1460

(338)

 

 

 

1730

(68)

 

 

 

1730

(68)

Sta 530: Unit 1A - Bearings (8/25/2025 - 9/26/2025) Sta 530: Unit 1B - Bearings (8/26/2025 - 9/26/2025)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 4A - Piston (8/25/2025 - 9/19/2025)

Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 6A - Piston Liner & Unloader Replacements (3/25/2025 - 9/12/2025)

Sta 534: Unit 7A - Startup Sequence (5/20/2025 - 9/26/2025)

MLV 548

(segment 542 BH)

 

1,597

1375

(222)

1375

(222)

1375

(222)

1375

(222)

1375

(222)

1560

(37)

1560

(37)

Sta 546: Unit 1A - Engine and Compressor Overhaul (8/11/2025 - 10/17/2025)

Station 860

(segment 548 BH)

 

1,516

 

1275

(241)

 

1275

(241)

 

1275

(241)

 

1275

(241)

 

1275

(241)

 

1500

(16)

 

1500

(16)

Sta 550: Unit 2A - Compressor Overhaul (8/25/2025 - 10/17/2025)

Sta 555 Collinwood: Annual ESD Test & Maintenance (9/8/2025 - 9/12/2025) Sta 555: Unit 1B - Vibration System Upgrade (9/8/2025 - 9/12/2025)

 

 

Station 860 North (Segment 860 BH)

 

 

 

1,793

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1210

(583)

 

 

 

1705

(88)

 

 

 

1705

(88)

MLV 560-2 to MLV 561-2: Class Change Pipe Replacement (6/9/2025 - 9/16/2025)

Sta 563: Unit 1A - Annual Inspection & Safety Device Check (9/11/2025 - 9/12/2025)

Sta 563: Unit 2A - Overhaul Inspection & Safety Device Check (9/8/2025 - 9/11/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 -

12/31/2025)

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

2,645

 

 

 

 

 

 

2155

(490)

 

 

 

 

 

 

2120

(525)

 

 

 

 

 

 

2120

(525)

 

 

 

 

 

 

2165

(480)

 

 

 

 

 

 

2260

(385)

 

 

 

 

 

 

2260

(385)

 

 

 

 

 

 

2280

(365)

MLV 101-5 to MLV 102-5: Class Change Pipe Replacement (7/30/2025 - 9/10/2025)

MLV 106-1D to MLV 110-7: Make Piggable Valve MLV 107-7, MLV 109-7

Replacements & Adding MLV 109-7A (M) (9/3/2025 - 9/30/2025) MLV 870-2 to MLV 870-2R: Anomaly Remediation (9/9/2025 - 9/14/2025) MLV 93-3 to MLV 94-3: HDD River Crossing Replacement (7/14/2025 -

9/13/2025)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #7 (4/14/2025 - 10/17/2025)

Sta 87: Unit 1D - Oil Cooler Cleaning/Repair (9/2/2025 - 9/24/2025) Sta 87: Unit 1E - Turbocharger Replacement (9/8/2025 - 10/10/2025) Sta 871: Unit 3A - Engine Inspection (8/22/2025 - 9/19/2025)

Sta 875: Unit 1A - 4K/8K Inspection (9/9/2025 - 9/11/2025)

Station 114

(segment 114 BH)

 

920

780

(140)

780

(140)

780

(140)

780

(140)

780

(140)

780

(140)

780

(140)

Sta 119A: Rocky Fork: Force Majeure - Unit 1A (8/29/2025 - TBD)

 

Station 204

(Segment 204 BH)

 

 

1,827

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

 

1300

(527)

MLV 216-2 to MLV 216-2A: Class Change Replacement (8/12/2025 - 9/9/2025) Sta 204: Unit 10A - Turbo Housing (9/8/2025 - 9/11/2025)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-204 (8/5/2025 10/19/2025)

Station 219 South (Segment 217

BH)

 

1,638

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1438

(200)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-217 (8/4/2025 10/19/2025)

Station 245

(segment 245 FH)

 

997

855

(142)

855

(142)

855

(142)

855

(142)

855

(142)

925

(72)

925

(72)

Sta 241: Unit 3A - C3 Cooper Upgrade (9/8/2025 - 9/27/2025) Sta 245: Unit 1C - Engine Exchange (9/8/2025 - 9/12/2025)


TGP - Outage Impact Report Seven Day Forecast (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

Station / Seg

Est Nominal

Operating Capacity (Thousand Dth)

Monday

(9/8)

Tuesday

(9/9)

Wednesday

(9/10)

Thursday

(9/11)

Friday

(9/12)

Saturday

(9/13)

Sunday

(9/14)

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 254

(segment 256 FH)

 

1,213

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

Sta 254: Unit 4A - Replace Power Cylinder Head (5/16/2025 - 11/1/2025)

Sta. 254: Bldg A Stack Replacement and Unit Upgrades (7/14/2025 - 11/1/2025)

Station 261 Discharge East (segment 261

FH)

 

941

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

 

910

(31)

Sta 261: Unit 1C - Valve replacement & Solar Commissioning (9/8/2025 - 9/19/2025)

Station 267 South (segment 266

FH)

 

469

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Fitchburg Lat to Gloucester (segment 268

FH)

 

202

 

202

 

185

(17)

 

185

(17)

 

185

(17)

 

185

(17)

 

185

(17)

 

185

(17)

MLV 270-1A to MLV 270-101.1R: Anomaly Remediation (9/9/2025 - 9/14/2025)

Station 307

(segment 307 BH)

 

1,148

1045

(103)

1045

(103)

760

(388)

1045

(103)

1045

(103)

 

1,148

 

1,148

Sta 307: Unit 2A - Engine Maintenace (9/8/2025 - 9/12/2025) Sta 307: Unit 3A - Engine Maintenace (9/8/2025 - 9/12/2025)

Station 310 Smethport: Annual ESD Test (9/10/2025)

Station 315

(segment 315 BH)

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

Station 317

(segment 317 BH)

 

1,579

 

1,579

1555

(24)

1555

(24)

1555

(24)

1555

(24)

 

1,579

 

1,579

Sta 317: Unit 1B - Engine Maintenace (9/9/2025 - 9/12/2025)

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

Station 405 HC Line (segment 299

FH)

 

803

 

803

 

803

 

803

 

803

 

803

 

803

 

803

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

TGP - Outage Impact Report September 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/1 - 9/7)

Week 2

(9/8 - 9/14)

Week 3

(9/15 - 9/21)

Week 4

(9/22 - 9/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

564

 

 

 

564

 

564

 

MLV 406

(segment 406 BH)

 

456

 

 

430

(26)

430

(26)

MLV 401-1 to MLV 402-1: Immediate Anomaly Remediation (9/15/2025 - 10/3/2025)

MLV 403-1 to MLV 404-1: Anomaly Remediation (M) (9/15/2025 - 10/3/2025)

Station 1

(segment 101 BH)

 

400

 

 

 

400

 

400

 

Station 9

(segment 109 BH)

 

1,028

 

 

 

1,028

 

1,028

 

Station 17

(segment 117 FH)

 

758

 

 

753

(5)

 

758

MLV 17-1D to MLV 20-1A: Pig Run - Cleaning 9/15/25 (9/15/2025) MLV 17-1D to MLV 20-1A: Pig Run - Gauge 9/16/25 (9/16/2025)

MLV 17-1D to MLV 20-1A: Pig Run - MFL-A 9/17/25 (9/17/2025)

Station 25

(segment 125 FH)

 

714

 

 

700

(14)

700

(14)

Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 40 South

(segment 132 FH)

 

912

 

 

 

587

(325)

 

587

(325)

MLV 39-2 to MLV 40-2S: Class Change (9/23/2025 - 10/6/2025) MLV 39-3 to MLV 40-3S: Class Change (9/9/2025 - 9/22/2025)

 

 

 

 

Station 47

(segment 143 FH)

 

 

 

 

 

1,222

 

 

 

 

 

 

1140

(82)

 

 

 

 

1140

(82)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-1AT to MLV 49-1: Anomaly Remediation (1/6/2025 - 10/31/2025)

MLV 49-1 to MLV 50-1: Anomaly Remediation (3/4/2025 - 10/31/2025) MLV 53-2BREH to MLV 53-2BR: Special Permit Replacement (9/12/2025 - 10/15/2025)

MLV 53-3BR to MLV 54-3BL: HydroTest (8/25/2025 - 10/4/2025)

MLV 54-1D TO MLV 63-1S: Pig Runs - Cleaning / Gauge 9/16/25 (9/16/2025) MLV 54-1D TO MLV 63-1S: Pig Runs - CLP / IMU 9/18/25 (9/18/2025)

MLV 54-1D TO MLV 63-1S: Pig Runs - MFL-C 9/23/25 (9/23/2025) MLV 54-1D TO MLV 63-1S: Pig Runs - MFL-C 9/25/25 (9/25/2025)

Station 63

(segment 163 FH)

 

1,233

 

 

 

1,233

 

1,233

 

Station 823

(segment 823 BH)

 

686

 

 

 

686

 

686

 

Station 834

(segment 834 BH)

 

679

 

 

670

(9)

670

(9)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

Station 847

(segment 847 BH)

 

284

 

 

 

215

(69)

 

284

MLV 838-1 TO MLV 834-1: Pig Re-Runs - ROSEN EMAT 9/18 (M) (9/18/2025) MLV 838-1 TO MLV 834-1: Pig Runs - Cleaning 9/15 - 9/17 (M) (9/15/2025 - 9/17/2025)

Station 527

(segment 527 BH)

 

2,392

 

 

 

2,392

2380

(12)

MLV 530-1 TO MLV 531-1: Anomaly Remedition (9/22/2025 - 9/27/2025)

 

Station 534 South of Pool (segment 530 BH)

 

 

1,798

 

 

 

 

1730

(68)

 

 

1730

(68)

Sta 530: Unit 1A - Bearings (8/25/2025 - 9/26/2025) Sta 530: Unit 1B - Bearings (8/26/2025 - 9/26/2025)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 4A - Piston (8/25/2025 - 9/19/2025)

Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

Sta 534: Unit 7A - Startup Sequence (5/20/2025 - 9/26/2025)

MLV 548

(segment 542 BH)

 

1,597

 

 

1560

(37)

1560

(37)

Sta 546: Unit 1A - Engine and Compressor Overhaul (8/11/2025 - 10/17/2025)

Station 860

(segment 548 BH)

 

1,516

 

 

1500

(16)

1280

(236)

Sta 550: Unit 2A - Compressor Overhaul (8/25/2025 - 10/17/2025) Sta 555: Unit 1B - Install New PLC Program (9/22/2025 - 9/26/2025)

 

Station 860 North (Segment 860 BH)

 

 

1,793

 

 

 

 

1705

(88)

 

 

1780

(13)

MLV 560-2 to MLV 561-2: Class Change Pipe Replacement (6/9/2025 - 9/16/2025)

MLV 861-1 to MLV 862-1: Install New 30" Valve 861-1A (9/24/2025 - 10/4/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 - 12/31/2025)


 

TGP - Outage Impact Report September 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/1 - 9/7)

Week 2

(9/8 - 9/14)

Week 3

(9/15 - 9/21)

Week 4

(9/22 - 9/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

 

2,645

 

 

 

 

 

 

 

 

 

1965

(680)

 

 

 

 

 

 

 

1630

(1015)

MLV 106-1D to MLV 110-7: Make Piggable Valve MLV 107-7, MLV 109-7

Replacements & Adding MLV 109-7A (M) (9/3/2025 - 9/30/2025) MLV 108-3 to MLV 109-3: Special Permit Pipe Replacement (9/24/2025 -

10/15/2025)

MLV 867-2 to MLV 868-2: Anomaly Remediation (9/20/2025 - 10/25/2025) MLV 868-2 to MLV 869-2: Anomaly Remediation (9/15/2025 - 9/20/2025) MLV 96-5 to MLV 102-5: Pig Runs - Cleaning / Gauge 9/25/25 (9/25/2025) Sta 106 Clay City: Upgrade B Building Jacket Water System (9/15/2025 - 10/3/2025)

Sta 106: Unit 1D - Solar 4K/8K Inspection (9/22/2025 - 9/26/2025)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #7 (4/14/2025 - 10/17/2025) Sta 87: Unit 1D - Oil Cooler Cleaning/Repair (9/2/2025 - 9/24/2025)

Sta 87: Unit 1E - Turbocharger Replacement (9/8/2025 - 10/10/2025) Sta 871: Unit 3A - Engine Inspection (8/22/2025 - 9/19/2025)

Sta 96: Unit 2D - Compressor Valves (9/22/2025 - 9/26/2025)

Station 114

(segment 114 BH)

 

920

 

 

865

(55)

 

920

Sta 114: Station Outage - C Units 1-3 - Replace Diodes all C Units (9/18/2025)

 

 

 

Station 204

(Segment 204 BH)

 

 

 

 

1,827

 

 

 

 

 

1300

(527)

 

 

 

1300

(527)

MLV 213-2A to MLV 214-2: Special Permit Replacement (9/23/2025 - 10/31/2025)

Sta 204: Scrubber Filter (9/22/2025 - 9/24/2025)

Sta 204: Unit 3A - Turbo Housing (9/15/2025 - 9/16/2025) Sta 209 Cambridge: Scrubber Filter (9/25/2025 - 9/27/2025)

Sta 209: Unit 5A - Crankcase Inspection (9/22/2025 - 9/25/2025) Sta 209: Unit 7A - Install F/W Turbo (9/15/2025 - 9/18/2025)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-204 (8/5/2025 -

10/19/2025)

Station 219 South (Segment 217

BH)

 

1,638

 

 

 

1438

(200)

 

1438

(200)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-217 (8/4/2025 - 10/19/2025)

Station 245

(segment 245 FH)

 

997

 

 

925

(72)

925

(72)

Sta 241: Unit 3A - C3 Cooper Upgrade (9/8/2025 - 9/27/2025)

 

 

Station 254

(segment 256 FH)

 

 

 

1,213

 

 

 

 

615

(598)

 

 

710

(503)

MLV 254-1 to MLV 261-1: Pig Run - Maintenance (9/23/2025) MLV 254-2 to MLV 261-2: Pig Run - Maintenance (9/24/2025) MLV 254-3 to MLV 258-3: Pig Run - Maintenance (9/25/2025) Sta 254: Unit 2B - HIM Upgrade (9/15/2025 - 9/16/2025)

Sta 254: Unit 4A - Replace Power Cylinder Head (5/16/2025 - 11/1/2025) Sta. 254: Bldg A Stack Replacement and Unit Upgrades (7/14/2025 - 11/1/2025)

N Hampton Lat (segment 280

FH)

 

40

 

 

 

40

30

(10)

Sta 260A Southwick: Annual ESD Test (9/23/2025)

Station 261 Discharge East (segment 261

FH)

 

941

 

 

 

910

(31)

 

585

(356)

Sta 261: Unit 1C - Valve replacement & Solar Commissioning (9/8/2025 - 9/19/2025)

Sta 264 Charlton: Annual ESD Test (9/25/2025)

Station 267 South (segment 266

FH)

 

469

 

 

 

312

(157)

 

312

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Fitchburg Lat to Gloucester (segment 268

FH)

 

202

 

 

 

140

(62)

 

202

MLV 267-1A to MLV 268-1: Anomaly Remediation (9/15/2025 - 9/20/2025)

Station 307

(segment 307 BH)

 

1,148

 

 

 

1,148

960

(188)

Sta 307 (Pigeon ): Annual ESD Test (9/22/2025 - 9/26/2025)

Sta 307: Unit 6A - Protective Device Checks (9/22/2025 - 9/26/2025)

Station 313 Discharge (segment 399

FH)

 

806

 

 

 

806

 

408

(398)

Sta 313: Unit 1C - Capacitor Replacement (9/22/2025 - 9/26/2025)

Station 315

(segment 315 BH)

 

1,854

 

 

1695

(159)

 

1,854

Sta 315: Unit 1B - Water Wash & Borescope (9/16/2025)

Sta 315: Unit 2A - Water Wash & Borescope (9/17/2025 - 9/18/2025)

 

Station 317

(segment 317 BH)

 

 

1,579

 

 

 

1550

(29)

 

1235

(344)

MLV 317-1 to MLV 318-1: Hot Tap for New Meter (Meter: Port Royal PIN: 57162)

(M) (9/16/2025 - 9/17/2025)

MLV 317-2 to MLV 318-2: Hot Tap for New Meter (Meter: Port Royal PIN: 57162)

(M) (9/18/2025 - 9/19/2025)

Sta 317: Units 1C - Water Wash (9/22/2025 - 9/23/2025)


 

TGP - Outage Impact Report September 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/1 - 9/7)

Week 2

(9/8 - 9/14)

Week 3

(9/15 - 9/21)

Week 4

(9/22 - 9/28)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 321

(segment 321 FH)

 

2,102

 

 

1240

(862)

1240

(862)

MLV 320-2A to MLV 322-2: Drip Removal 321-2-1 (M) (9/15/2025 - 9/30/2025)

MLV 324

(segment 324 FH)

 

1,767

 

 

 

1,767

 

1,767

 

Station 405 HC Line (segment 299

FH)

 

803

 

 

 

803

 

803

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

TGP - Outage Impact Report October 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/29 - 10/5)

Week 2

(10/6 - 10/12)

Week 3

(10/13 - 10/19)

Week 4

(10/20 - 10/26)

Week 5

(10/27 - 11/2)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Station 409A (Alamo) (segment 492 FH)

 

 

274

 

 

274

 

 

274

 

 

134

(140)

 

 

274

 

 

274

MLV 409A-901 to MLV 409A-902: Pig Run - Cleaning (M) 10/14/25 (10/14/2025)

MLV 409A-901 to MLV 409A-902: Pig Run - Cleaning (M) 10/15/25 (10/15/2025)

MLV 409A-901 to MLV 409A-902: Pig Run - MFL-A 10/16/25 (M) (10/16/2025)

Station 409 (Donna Line) (segment 490

FH)

 

564

 

504

(60)

 

564

 

564

 

564

 

564

Sta 409: Unit 3A - Engine Inspection (9/29/2025 - 10/3/2025)

 

 

MLV 406

(segment 406 BH)

 

 

 

456

 

 

430

(26)

 

 

 

456

 

 

211

(245)

 

 

 

456

 

 

 

456

MLV 400-1 to MLV 409-1: Pig Run - Maintenance Cleaning 10/14/25 (M) (10/14/2025)

MLV 400-2 to MLV 409-2: Pig Run - Maintenance Cleaning 10/16/25 (M) (10/16/2025)

MLV 401-1 to MLV 402-1: Immediate Anomaly Remediation (9/15/2025 - 10/3/2025)

MLV 403-1 to MLV 404-1: Anomaly Remediation (M) (9/15/2025 - 10/3/2025)

Station 1

(segment 101 BH)

 

400

 

400

 

400

 

400

 

400

 

400

 

 

 

 

Station 9

(segment 109 BH)

 

 

 

 

1,028

 

 

 

 

1,028

 

 

 

 

845

(183)

 

 

 

 

1,028

 

 

 

 

638

(390)

 

 

 

 

1,028

MLV 5-2 to MLV 1-2D: Pig Runs - Maintenance Cleaning 10/23 (M) (10/23/2025) MLV 9-1S and MLV 1-1D: Pig Run - Maintenance Cleaning 10/21 (M) (10/21/2025)

MLV 9-2 to MLV 5-2: Pig Runs - Maintenance Cleaning 10/23 (M) (10/23/2025) MLV 9-3 to MLV 4-3: Pig Runs - Maintenance Cleaning 10/22 (M) (10/22/2025) Sta 11A: Annual ESD Test (10/7/2025)

Sta 11A: Unit 1A - Safety Devices (10/20/2025 - 10/22/2025)

Station 17

(segment 117 FH)

 

758

 

758

 

758

753

(5)

753

(5)

753

(5)

MLV 17-1D to MLV 20-1A: Anomaly Remediation (10/13/2025 - 10/31/2025)

Station 25

(segment 125 FH)

 

714

700

(14)

700

(14)

700

(14)

700

(14)

700

(14)

MLV 26-1 Relocation: Highway 59 Widening (10/6/2025 - 11/2/2025)

MLV 26-1 to MLV 27-1: Install Road Casing (10/6/2025 - 11/2/2025) Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 40 South

(segment 132 FH)

 

912

 

777

(135)

 

777

(135)

 

777

(135)

 

637

(275)

 

747

(165)

MLV 32-2D TO MLV 40-2S: Pig Runs - Maintenance (10/28/2025) MLV 32-3D to MLV 40-3S: Pig Runs - Maintenance (10/21/2025) MLV 39-1 to MLV 40-1S: Class Change (10/7/2025 - 10/20/2025)

MLV 39-2 to MLV 40-2S: Class Change (9/23/2025 - 10/6/2025)

Station 40 KN South (segment 501

FH)

 

268

 

268

 

268

 

268

 

268

 

175

(93)

Sta 500-1 to Sta 823 (MLV 507-1): Pig Run - Maintenance (M) (10/29/2025)

 

 

 

Station 47

(segment 143 FH)

 

 

 

 

1,226

 

 

 

 

1219

(7)

 

 

 

 

1219

(7)

 

 

 

 

1215

(11)

 

 

 

 

1220

(6)

 

 

 

 

1147

(79)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-1AT to MLV 49-1: Anomaly Remediation (1/6/2025 - 10/31/2025) MLV 47-2A to MLV 48-2: Pipe Replacement (M) (10/13/2025 - 10/24/2025)

MLV 47-3A to MLV 48-3: Pipe Replacement (10/27/2025 - 11/7/2025) MLV 49-1 to MLV 50-1: Anomaly Remediation (3/4/2025 - 10/31/2025)

MLV 53-2BREH to MLV 53-2BR: Special Permit Replacement (9/12/2025 - 10/15/2025)

MLV 53-3BR to MLV 54-3BL: HydroTest (8/25/2025 - 10/4/2025)

Sta 47: Unit 1D - Flush & Clean Cooling Systems (10/20/2025 - 10/24/2025) Sta 47: Unit 2D - Flush & Clean Cooling Systems (10/20/2025 - 10/24/2025)

 

 

 

Station 63

(segment 163 FH)

 

 

 

 

1,233

 

 

 

1104

(129)

 

 

 

1038

(195)

 

 

 

1038

(195)

 

 

 

1088

(145)

 

 

 

848

(385)

MLV 63-4D to MLV 71-4S: Pig Runs - Caliper / IMU 10/30/25 (10/30/2025) MLV 63-4D to MLV 71-4S: Pig Runs - Cleaning / Gauge 10/28/25 (10/28/2025) MLV 83-3 to MLV 83-3B: Install Backpressure Regulator (10/16/2025 - 10/31/2025)

MLV 83-4 to MLV 83-4B: Install Backpressure Regulator (10/1/2025 - 10/15/2025)

MLV 84-4 to MLV 85-4: Class Change Pipe Replacement (10/6/2025 - 10/25/2025)

Station 823

(segment 823 BH)

 

686

 

686

 

686

 

686

 

686

 

686

 

Station 834

(segment 834 BH)

 

679

590

(89)

670

(9)

670

(9)

670

(9)

664

(15)

Sta 834: Annual ESD Test (9/29/2025)

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

Station 847

(segment 847 BH)

 

284

 

284

 

284

 

160

(124)

 

160

(124)

 

284

MLV 856-1 to MLV 860-1: Pig Runs - Cal / IMU 10/21/25 (10/21/2025)

MLV 856-1 to MLV 860-1: Pig Runs - Cleaning / Gauge 10/16/25 (10/16/2025) MLV 856-1 to MLV 860-1: Pig Runs - MFL-C 10/23/25 (10/23/2025)

Station 823 Muskrat Line (segment 509

BH)

 

242

 

200

(42)

 

242

 

242

 

242

 

242

Sta 823 to MLV 516: Pig Run - Maintenance (M) (10/1/2025)

Station 534 South of Pool (segment 530

BH)

 

1,798

 

1776

(22)

 

1776

(22)

 

1776

(22)

 

1776

(22)

 

1776

(22)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)


 

TGP - Outage Impact Report October 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/29 - 10/5)

Week 2

(10/6 - 10/12)

Week 3

(10/13 - 10/19)

Week 4

(10/20 - 10/26)

Week 5

(10/27 - 11/2)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

 

Station 542

(segment 539 BH)

 

 

 

1,719

 

 

 

1,719

 

 

 

1380

(339)

 

 

 

1380

(339)

 

 

 

845

(874)

 

 

 

845

(874)

MLV 540-1 to MLV 540-1A: Anomaly Remediation (10/10/2025 - 10/20/2025)

MLV 540-1 to MLV 540-1A: Shallow Pipe Lowering (10/10/2025 - 10/17/2025) MLV 540-2 to MLV 540-2A: Shallow Pipe Lowering (10/23/2025 - 10/31/2025) MLV 541-1 to MLV 541-1A: Anomaly Remediation (10/10/2025 - 10/20/2025)

MLV 548

(segment 542 BH)

 

1,597

1480

(117)

1480

(117)

1480

(117)

1580

(17)

1562

(35)

Sta 546: Unit 1A - Engine and Compressor Overhaul (8/11/2025 - 10/17/2025) Sta 546: Unit 4A - Engine and Compressor Overhaul (9/29/2025 - 11/7/2025)

 

 

 

Station 860

(segment 548 BH)

 

 

 

 

1,516

 

 

 

1500

(16)

 

 

 

1390

(126)

 

 

 

1440

(76)

 

 

 

1245

(271)

 

 

 

1500

(16)

Sta 550 Hamilton: Annual ESD Test & Maintenance (10/23/2025) Sta 550: A building - Replace SLC 500 Remote PLC (10/23/2025) Sta 550: Unit 2A - Compressor Overhaul (8/25/2025 - 10/17/2025) Sta 550: Unit 3A - Engine Overhaul (10/13/2025 - 11/15/2025)

Sta 550: Unit 3A - Turbocharger Exchange (10/27/2025 - 11/7/2025) Sta 555: Unit 1A - Engine Maintenance (10/6/2025 - 10/11/2025) Sta 555: Unit 2A - Engine Maintenance (10/6/2025 - 10/11/2025) Sta 555: Unit 5A - Engine Maintenance (10/6/2025 - 10/11/2025)

Sta 555: Unit 6A - Engine Maintenance (10/6/2025 - 10/11/2025)

Station 860 North (Segment 860

BH)

 

1,793

 

1780

(13)

 

1780

(13)

 

1780

(13)

 

1780

(13)

 

1780

(13)

MLV 861-1 to MLV 862-1: Install New 30" Valve 861-1A (9/24/2025 - 10/4/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 - 12/31/2025)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2,645

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1830

(815)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2195

(450)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1915

(730)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2420

(225)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2420

(225)

MLV 106-1 to MLV 111-7: Pig Runs - AFD Combo 10/14/25 (10/14/2025)

MLV 106-1 to MLV 111-7: Pig Runs - Cleaning / Gauge 10/9/25 (10/9/2025) MLV 106-1 to MLV 111-7: Pig Runs - EMAT 10/16/25 (10/16/2025)

MLV 106-1D to MLV 110-7: Make Piggable Valve MLV 107-7, MLV 109-7

Replacements & Adding MLV 109-7A (M) (9/3/2025 - 9/30/2025)

MLV 108-2 to MLV 109-2: Special Permit Pipe Replacement (M) (11/1/2025 - 11/30/2025)

MLV 108-3 to MLV 109-3: Special Permit Pipe Replacement (9/24/2025 - 10/15/2025)

MLV 109-2 to 109-2A: Special Permit Pipe Replacement (10/16/2025 - 10/31/2025)

MLV 109-3 to MLV 109-3A: Class Change Pipe Replacement (10/16/2025 - 10/31/2025)

MLV 867-2 to MLV 868-2: Anomaly Remediation (9/20/2025 - 10/25/2025) MLV 871-2A to MLV 872-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 871-2L to MLV 871-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 872-2 to MLV 873-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 873-2 to MLV 873-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 90-3 to MLV 91-3: HDD River Crossing Replacement (10/16/2025 - 10/27/2025)

MLV 96-5 to MLV 102-5: Pig Runs - AFD Combo 10/2/25 (10/2/2025)

MLV 96-5 to MLV 102-5: Pig Runs - Caliper 9/30/25 (9/30/2025) MLV 96-5 to MLV 102-5: Pig Runs - EMAT 10/7/25 (10/7/2025)

Sta 106 Clay City: Upgrade B Building Jacket Water System (9/15/2025 - 10/3/2025)

Sta 106: Unit 1C - Replace Power Cylinder Bearing #7 (4/14/2025 - 10/17/2025) Sta 110 Morehead: Unit Inspections (10/20/2025 - 10/24/2025)

Sta 87 Portland: Annual ESD Test (10/14/2025 - 10/15/2025) Sta 87: Unit 1E - Turbocharger Replacement (9/8/2025 - 10/10/2025)

Sta 87: Unit 2E - Turbocharger Replacement (10/13/2025 - 11/26/2025)

 

Station 114

(segment 114 BH)

 

 

920

 

 

920

 

850

(70)

 

 

920

 

700

(220)

 

840

(80)

Sta 114: Installation of Unit Valves (10/24/2025 - 10/25/2025) Sta 114: Unit 1C - Complete Intallation of Unit Valves (10/27/2025) Sta 114: Unit 2C - Complete Installation of Unit Valves (10/29/2025)

Sta 118A Tyler Mountain: Annual ESD Test (10/27/2025 - 10/29/2025)

Sta 118A: Unit 1A - Turbine Exchange (10/6/2025 - 10/11/2025)

 

 

Station 204

(Segment 204 BH)

 

 

 

1,827

 

 

 

1300

(527)

 

 

 

1300

(527)

 

 

 

1300

(527)

 

 

 

1797

(30)

 

 

 

1411

(416)

MLV 209-4 to MLV 204-4: Pig Runs - Cleaning / Gauge 10/30/25 (10/30/2025) MLV 213-2A to MLV 214-2: Special Permit Replacement (9/23/2025 - 10/31/2025)

Sta 209: Unit 4A - Packing & Starting Air Valves (9/29/2025 - 10/2/2025) Sta 209: Unit 7A - Packing (10/6/2025 - 10/9/2025)

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-204 (8/5/2025 - 10/19/2025)

Station 219 South (Segment 217

BH)

 

1,638

 

1438

(200)

 

1438

(200)

 

1438

(200)

 

1,638

 

1,638

Sta 87 to Sta 219: Cumulative Planned/Unplanned Maintenance-217 (8/4/2025 - 10/19/2025)

Station 237 West

(segment 233 FH)

 

475

0

(475)

0

(475)

 

475

 

475

 

475

MLV 236-1 to MLV 237-1BR: Special Permit Replacement (M) (9/29/2025 - 10/10/2025)

Station 245

(segment 245 FH)

 

997

 

850

(147)

 

835

(162)

 

835

(162)

 

850

(147)

 

850

(147)

Sta 241: Unit 1A - Engine Maintenance (10/6/2025 - 10/10/2025) Sta 241: Unit 1B - 2K Maintenance (10/7/2025 - 10/8/2025)

Sta 241: Unit 2A - Engine Maintenance (10/13/2025 - 10/17/2025)

Sta 249: Unit 1A - Aftercooler Upgrade (10/1/2025 - 10/31/2025)


 

TGP - Outage Impact Report October 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(9/29 - 10/5)

Week 2

(10/6 - 10/12)

Week 3

(10/13 - 10/19)

Week 4

(10/20 - 10/26)

Week 5

(10/27 - 11/2)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 254

(segment 256 FH)

 

1,213

920

(293)

920

(293)

920

(293)

920

(293)

920

(293)

Sta 254: Unit 4A - Replace Power Cylinder Head (5/16/2025 - 11/1/2025)

Sta. 254: Bldg A Stack Replacement and Unit Upgrades (7/14/2025 - 11/1/2025)

Station 261 Discharge East (segment 261

FH)

 

941

 

941

 

930

(11)

 

590

(351)

 

941

 

941

Sta 261 Agawam: Annual ESD Test (M) (10/13/2025 - 10/15/2025) Sta 261: Unit 4A - Compressor Rod Packing (M) (10/6/2025 - 10/9/2025)

Station 267 South (segment 266

FH)

 

469

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

 

312

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Station 307

(segment 307 BH)

 

1,150

 

1,150

965

(185)

 

1,150

 

1,150

 

1,150

Sta 303A: Unit 1A - Water Wash (10/7/2025 - 10/8/2025)

Station 315

(segment 315 BH)

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

1,854

 

Station 321

(segment 321 FH)

 

2,102

 

1145

(957)

 

2,102

 

2,102

 

2,102

 

2,102

MLV 320-2A to MLV 322-2: Drip Removal 321-2-1 (M) (9/15/2025 - 9/30/2025)

Sta 323: Unit 1A - Drive Modernization Upgrade (9/29/2025 - 10/3/2025) Sta. 323A Lackawaxen: Annual ESD Testing (9/29/2025 - 9/30/2025)

MLV 324

(segment 324 FH)

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

1,767

 

Station 405 HC Line (segment 299

FH)

 

803

 

803

 

803

 

690

(113)

 

803

 

803

Sta 405A: Unit 1A - 8K Solar Turbine Borescope Inspection (10/15/2025) Sta 405A: Unit 1A - Water Wash (10/14/2025)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

TGP - Outage Impact Report November 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(11/3 - 11/9)

Week 2

(11/10 - 11/16)

Week 3

(11/17 - 11/23)

Week 4

(11/24 - 11/30)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 409 (Donna Line) (segment 490

FH)

 

585

 

585

 

585

 

585

 

585

 

Station 1

(segment 101 BH)

 

438

 

438

 

438

 

438

 

438

 

Station 9

(segment 109 BH)

 

1,066

 

1,066

 

1,066

 

1,066

 

1,066

 

Station 25

(segment 125 FH)

 

1,101

1041

(60)

1041

(60)

1041

(60)

1041

(60)

MLV 26-2 Relocation: Highway 59 Widening (11/3/2025 - 11/30/2025) Sta 25: Unit 1C - VFD Replacement (7/16/2025 - 10/31/2026)

Station 47

(segment 143 FH)

 

1,354

1275

(79)

1275

(79)

1275

(79)

1349

(5)

MLV 47-1A to MLV 48-1: Class Change (9/1/2025 - 12/31/2025) MLV 47-3A to MLV 48-3: Pipe Replacement (10/27/2025 - 11/7/2025)

MLV 47-4A to MLV 48-4: Pipe Replacement (M) (11/10/2025 - 11/21/2025)

Station 63

(segment 163 FH)

 

1,287

887

(400)

1255

(32)

 

1,287

 

1,287

MLV 63-4D to MLV 71-4S: Pig Runs - EMAT 11/6/25 (11/6/2025) MLV 63-4D to MLV 71-4S: Pig Runs - MFL-C 11/4/25 (11/4/2025)

MLV 71-1D to MLV 77-1A: Pig Re-Runs - MDS 11/12/25 (11/12/2025)

Station 823

(segment 823 BH)

 

759

215

(544)

 

759

 

759

 

759

Sta 827 to Sta 823: Pig Run - Maintenance (M) (11/5/2025) Sta 834 to Sta 827: Maintenance Pig (M) (11/5/2025)

Station 834

(segment 834 BH)

 

733

718

(15)

 

733

 

733

 

733

Sta 834: Unit 6A - Overhaul (3/3/2025 - 11/3/2025)

Station 534 South of Pool (segment 530

BH)

 

1,632

 

1610

(22)

 

1610

(22)

 

1610

(22)

 

1610

(22)

Sta 530: Unit 3A - Crankshaft Replacement (6/9/2025 - 10/31/2026) Sta 530: Unit 5A - Top-End Overhaul (6/9/2025 - 12/31/2026)

MLV 548

(segment 542 BH)

 

1,771

1736

(35)

 

1,771

 

1,771

 

1,771

Sta 546: Unit 4A - Engine and Compressor Overhaul (9/29/2025 - 11/7/2025)

Station 860

(segment 548 BH)

 

1,697

1681

(16)

1681

(16)

 

1,697

 

1,697

Sta 550: Unit 3A - Engine Overhaul (10/13/2025 - 11/15/2025) Sta 550: Unit 3A - Turbocharger Exchange (10/27/2025 - 11/7/2025)

 

Station 860 North (Segment 860 BH)

 

 

2,028

 

 

2015

(13)

 

 

2015

(13)

 

 

1575

(453)

 

 

2015

(13)

MLV 560-1 to MLV 563-1: HDD River Crossing & MLV 561-1 & MLV 562-1

Replacement (11/17/2025 - 11/21/2025)

Sta 563: Unit 1A - Lube Oil Varnish Installation (11/19/2025 - 11/21/2025) Sta 563: Unit 2A - Lube Oil Varnish Installation (11/17/2025 - 11/19/2025)

Sta 860: Unit 1A - Aftercooler Jacket Water Inspection (6/17/2024 - 12/31/2025)

 

 

 

 

Station 110

(segment 187 BH)

(south thru Kentucky)

 

 

 

 

 

 

 

2,775

 

 

 

 

 

 

2395

(380)

 

 

 

 

 

 

2395

(380)

 

 

 

 

 

 

2580

(195)

 

 

 

 

 

 

2580

(195)

MLV 108-2 to MLV 109-2: Special Permit Pipe Replacement (M) (11/1/2025 - 11/30/2025)

MLV 871-2A to MLV 872-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 871-2L to MLV 871-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 872-2 to MLV 873-2: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 873-2 to MLV 873-2A: Anomaly Remediation (10/26/2025 - 11/26/2025) MLV 87-4 to MLV 96-4: Pig Runs - AFD Combo 11/11/25 (11/11/2025)

MLV 87-4 to MLV 96-4: Pig Runs - Caliper 11/6/25 (11/6/2025) MLV 87-4 to MLV 96-4: Pig Runs - Cleaning / Gauge 11/4/25 (11/4/2025)

MLV 87-4 to MLV 96-4: Pig Runs - EMAT 11/13/25 (11/13/2025)

Sta 87: Unit 2E - Turbocharger Replacement (10/13/2025 - 11/26/2025)

Station 114

(segment 114 BH)

 

948

 

948

 

948

 

948

 

948

 

 

 

Station 204

(Segment 204 BH)

 

 

 

1,895

 

 

1463

(432)

 

 

1419

(476)

 

 

1419

(476)

 

 

 

1,895

MLV 209-4 to MLV 204-4: Pig Runs - Cal & IMU 11/04/25 (11/4/2025) MLV 209-4 to MLV 204-4: Pig Runs - MFL-A 11/06/25 (11/6/2025)

MLV 219-4 to MLV 214-4: Pig Run - Cleaning/Gauge 11/11/25 (M) (11/11/2025) MLV 219-4 to MLV 214-4: Pig Run - EMAT 11/20/25 (M) (11/20/2025)

MLV 219-4 to MLV 214-4: Pig Run - IMU/Caliper 11/13/25 (M) (11/13/2025) MLV 219-4 to MLV 214-4: Pig Run - MFL-C 11/18/25 (M) (11/18/2025)

Station 245

(segment 245 FH)

 

1,063

 

1,063

 

1,063

 

1,063

 

1,063

 

Station 261 Discharge East (segment 261

FH)

 

1,045

 

1,045

 

1,045

 

1,045

 

1,045

 


 

TGP - Outage Impact Report November 2025 (updated 09/04/25)

-Primary impact restrictions may be necessary

-Major impact restrictions may be necessary

-Minor impact restrictions may be necessary depending on flow conditions

-Little to no impact, though minor outages may cause incremental reductions

 

Station # / Lateral

Est Nominal Operating Capacity (Thousand Dth)

Week 1

(11/3 - 11/9)

Week 2

(11/10 - 11/16)

Week 3

(11/17 - 11/23)

Week 4

(11/24 - 11/30)

 

Primary Outage(s)

 

Est. Operational Capacity (Operational Impact) - Thousand Dth

Station 267 South (segment 266

FH)

 

503

 

346

(157)

 

346

(157)

 

346

(157)

 

346

(157)

Sta. 267: Bldg A Controls Upgrade (9/2/2025 - 11/26/2025)

Station 307

(segment 307 BH)

 

1,202

 

1,202

 

1,202

 

1,202

 

1,202

 

Station 315

(segment 315 BH)

 

1,915

 

1,915

 

1,915

 

1,915

 

1,915

 

MLV 324

(segment 324 FH)

 

1,885

 

1,885

 

1,885

 

1,885

 

1,885

 

Station 405 HC Line (segment 299

FH)

 

827

 

827

 

827

 

827

 

827

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.