Tennessee Gas Pipeline Notice 394491
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
Notice Eff Date/Time: 05/04/2025 3:37:47PM | Notice End Date/Time: 05/05/2025 9:00:00am |
Post Date/Time: 5/4/2025 3:37:47 PM | Notice ID: 394491 |
Reqrd Rsp: 1 | Rsp Date: 05/04/2025 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: RESTRICTIONS FOR 05-04-2025 ID2 |
Effective Intraday 2 Cycle (18:00) for the gas day of Sunday, May 04, 2025 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 SYSTEM WIDE (EXCLUDING ALL AREAS SOUTH OF STA 1) FOR UNDER-TAKES FROM THE SYSTEM OR OVER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
METER RESTRICTIONS
NONE
SEGMENT RESTRICTIONS
· STA 860 (Segment 860 BH) - through approx 100 % of PIP increases due to force majeure at STA 860; 1,477 Dths
· STA 860 South 500 Line (Segment 548 BH) - through approx 100 % of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 817 Dths
· STA 307 (Segment 307 BH) - through approx 100 % of SOP increases due to nominations in excess of operational capacity; 10,000 Dths
· MLV 314 East (Segment 314 BH) - through approx 100 % of SOP increases due to nominations in excess of operational capacity; 290,157 Dths
· STA 315 (Segment 315 BH) - through approx 100 % of SOP increases due to nominations in excess of operational capacity; 318,465 Dths
· STA 321 (Segment 321 FH) - through approx 63 % of SOP increases due to emergent repair at STA 321 UNIT 5B; 108,259 Dths
· Z5hc North (Segment 299 FH) - through approx 99 % of SOP increases due to nominations in excess of operational capacity; 288,020 Dths
· STA 245 (Segment 245 FH) - through approx 76 % of SOP increases due to nominations in excess of operational capacity; 234,926 Dths
· STA 249 (Segment 249 FH) - through approx 59 % of SOP increases due to nominations in excess of operational capacity; 83,652 Dths
LINEPACK RESTRICTIONS
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PALD service
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PAL-AO service
· Paybacks will be evaluated at each cycle and scheduled only if operationally feasible
STORAGE RESTRICTIONS
· No Authorized Overrun Injections Services under Rate Schedule FS-AO as well as No Authorized Overrun Injections in excess of Maximum Daily Injection Quantity (MDIQ) but below Maximum Daily Withdrawal Quantity (MDWQ) at the following storage fields:
· Northern MA (460018) storage field
· Portland MA (460025) storage field
· Portland PA (460020) storage field
· Bear Creek PA (460017) storage field
· No Interruptible Storage Injection Services under Rate Schedule IS at the following storage fields:
· Northern MA (460018) storage field (IS-MA)
· Bear Creek PA (460017) storage field (IS-PA)
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
Notice Eff Date/Time: 05/04/2025 3:37:47PM | Notice End Date/Time: 05/05/2025 9:00:00am |
Post Date/Time: 5/4/2025 3:37:47 PM | Notice ID: 394491 |
Reqrd Rsp: 1 | Rsp Date: 05/04/2025 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: RESTRICTIONS FOR 05-04-2025 ID2 |
Effective Intraday 2 Cycle (18:00) for the gas day of Sunday, May 04, 2025 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 SYSTEM WIDE (EXCLUDING ALL AREAS SOUTH OF STA 1) FOR UNDER-TAKES FROM THE SYSTEM OR OVER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
METER RESTRICTIONS
NONE
SEGMENT RESTRICTIONS
· STA 860 (Segment 860 BH) - through approx 100 % of PIP increases due to force majeure at STA 860; 1,477 Dths
· STA 860 South 500 Line (Segment 548 BH) - through approx 100 % of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 817 Dths
· STA 307 (Segment 307 BH) - through approx 100 % of SOP increases due to nominations in excess of operational capacity; 10,000 Dths
· MLV 314 East (Segment 314 BH) - through approx 100 % of SOP increases due to nominations in excess of operational capacity; 290,157 Dths
· STA 315 (Segment 315 BH) - through approx 100 % of SOP increases due to nominations in excess of operational capacity; 318,465 Dths
· STA 321 (Segment 321 FH) - through approx 63 % of SOP increases due to emergent repair at STA 321 UNIT 5B; 108,259 Dths
· Z5hc North (Segment 299 FH) - through approx 99 % of SOP increases due to nominations in excess of operational capacity; 288,020 Dths
· STA 245 (Segment 245 FH) - through approx 76 % of SOP increases due to nominations in excess of operational capacity; 234,926 Dths
· STA 249 (Segment 249 FH) - through approx 59 % of SOP increases due to nominations in excess of operational capacity; 83,652 Dths
LINEPACK RESTRICTIONS
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PALD service
· No Parks or Loan Paybacks under Rate Schedule PAL utilizing the PAL-AO service
· Paybacks will be evaluated at each cycle and scheduled only if operationally feasible
STORAGE RESTRICTIONS
· No Authorized Overrun Injections Services under Rate Schedule FS-AO as well as No Authorized Overrun Injections in excess of Maximum Daily Injection Quantity (MDIQ) but below Maximum Daily Withdrawal Quantity (MDWQ) at the following storage fields:
· Northern MA (460018) storage field
· Portland MA (460025) storage field
· Portland PA (460020) storage field
· Bear Creek PA (460017) storage field
· No Interruptible Storage Injection Services under Rate Schedule IS at the following storage fields:
· Northern MA (460018) storage field (IS-MA)
· Bear Creek PA (460017) storage field (IS-PA)
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.