Kinetica Deep Water Express Notice 5115

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

July 6, 2020

August 2020 Patterson 30” Maintenance


Kinetica Deepwater Express (KDE) will be undergoing planned maintenance to repair valves at the Patterson facility.
The repair effort will commence in two stages: the first stage begins Tuesday, August 18th, and will require a shut-in of
production on the meters listed below, lasting approximately 10 days. The second stage begins Friday, August 21st, and
will require a shut-in of production on the remaining meter listed below, lasting approximately 7 days.

Operators should plan to have production offline on, or before, 9:00 AM CST, on the gas day of their respective shut-in
based on the schedules below.

Kinetica anticipates that production can resume flow on or before Saturday, August 29th, 2020, and will post the
effective date that nominations will be accepted as the repairs progress.

Revisions to the schedule may be necessary to accommodate variations in the shut-in dates.

Shut-In on August 18th – August 28th

Meter
Number

Description

Meter
Number

Description

Meter
Number

Description

310002

VR 380 (Rec)

312166

SS 219

312544

SS 207/Manta Ray

310012

SMI 288 SSV

312168

SS 105

313009

SMI 149C

310014

EI 341 SSV

312178

EI 327

313055

SS 207/Enbridge

312106

SS 204/205

312184

SS 300 (SS 326)

313056

EI 275

312108

SS 207/216

312204

SS 80 at EI 125

313073

Contango (EI 63/11)

312112

EI 208 BEGH&K

312222

EI 238 MTR

313074

EI 246 A

312124

SS 277/299

312232

EI 346

313097

EI 342

312152

EI 188/189

312234

VR 356

313102

Belle Isle West

312156

SMI 7/10

312508

SS 178

313125

GB 426/VR 397

312162

EI 255/259

312518

SS 152 (EI 211/212)




Shut-In on August 21st – August 28th

Meter
Number

Description

312484

SMI 76/Garden Banks



For questions during business hours, please contact the Gas Scheduling Team at (713) 228-3347 X 420 or
scheduling@kineticallc.com. After hours, please contact the on call scheduler (posted on the EBB).

Questions for Operations should be directed to Rae Donaldson at (985) 209-5816 or Kurt Cheramie (985) 209-2283.

July 6, 2020

August 2020 Patterson 30” Maintenance

Kinetica Deepwater Express (KDE) will be undergoing planned maintenance to repair valves at the Patterson facility.
The repair effort will commence in two stages: the first stage begins Tuesday, August 18th, and will require a shut-in of
production on the meters listed below, lasting approximately 10 days. The second stage begins Friday, August 21st, and
will require a shut-in of production on the remaining meter listed below, lasting approximately 7 days.
Operators should plan to have production offline on, or before, 9:00 AM CST, on the gas day of their respective shut-in
based on the schedules below.
Kinetica anticipates that production can resume flow on or before Saturday, August 29th, 2020, and will post the
effective date that nominations will be accepted as the repairs progress.
Revisions to the schedule may be necessary to accommodate variations in the shut-in dates.

Shut-In on August 18th – August 28th

Meter
Meter
Meter
Number
Description
Number
Description
Number
Description
310002
VR 380 (Rec)
312166
SS 219
312544
SS 207/Manta Ray
310012
SMI 288 SSV
312168
SS 105
313009
SMI 149C
310014
EI 341 SSV
312178
EI 327
313055
SS 207/Enbridge
312106
SS 204/205
312184
SS 300 (SS 326)
313056
EI 275
312108
SS 207/216
312204
SS 80 at EI 125
313073
Contango (EI 63/11)
312112
EI 208 BEGH&K
312222
EI 238 MTR
313074
EI 246 A
312124
SS 277/299
312232
EI 346
313097
EI 342
312152
EI 188/189
312234
VR 356
313102
Belle Isle West
312156
SMI 7/10
312508
SS 178
313125
GB 426/VR 397
312162
EI 255/259
312518
SS 152 (EI 211/212)





Shut-In on August 21st – August 28th

Meter
Number

Description
312484
SMI 76/Garden Banks


For questions during business hours, please contact the Gas Scheduling Team at (713) 228-3347 X 420 or
scheduling@kineticallc.com. After hours, please contact the on call scheduler (posted on the EBB).

Questions for Operations should be directed to Rae Donaldson at (985) 209-5816 or Kurt Cheramie (985) 209-2283.