El Paso Natural Gas Notice 628303
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 8001703-EL PASO NATURAL GAS CO. L.L.C. | Critical: Y |
| Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
| Notice Eff Date/Time: 05/08/2026 8:42:22AM | Notice End Date/Time: 05/09/2026 9:00:00am |
| Post Date/Time: 5/8/2026 8:42:22 AM | Notice ID: 628303 |
| Reqrd Rsp: 1 | Rsp Date: 05/08/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: SOC Declaration-Location Specific Draft |
STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT
EFFECTIVE DATE: May 8, 2026
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following location.
DTEP S78 (301149)
OPERATING CONDITION SUMMARY: The EPNG system linepack level starts Gas Day May 8. 2026, at an acceptable level. The location listed above continues to draft the system and undermines our ability to maintain linepack within acceptable levels.
Deliveries in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to ensure that system pressure remain at a level capable of meeting scheduled deliveries off the system.
EPNG RESPONSE:
- Washington Ranch is available for withdrawal.
- IHSW Service will be suspended.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at newsroom@kindermorgan.com.
| TSP/TSP Name: 8001703-EL PASO NATURAL GAS CO. L.L.C. | Critical: Y |
| Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
| Notice Eff Date/Time: 05/08/2026 8:42:22AM | Notice End Date/Time: 05/09/2026 9:00:00am |
| Post Date/Time: 5/8/2026 8:42:22 AM | Notice ID: 628303 |
| Reqrd Rsp: 1 | Rsp Date: 05/08/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: SOC Declaration-Location Specific Draft |
STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT
EFFECTIVE DATE: May 8, 2026
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following location.
DTEP S78 (301149)
OPERATING CONDITION SUMMARY: The EPNG system linepack level starts Gas Day May 8. 2026, at an acceptable level. The location listed above continues to draft the system and undermines our ability to maintain linepack within acceptable levels.
Deliveries in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to ensure that system pressure remain at a level capable of meeting scheduled deliveries off the system.
EPNG RESPONSE:
- Washington Ranch is available for withdrawal.
- IHSW Service will be suspended.
REFERENCE INFORMATION:
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at newsroom@kindermorgan.com.