El Paso Natural Gas Notice 626592
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 8001703-EL PASO NATURAL GAS CO. L.L.C. | Critical: Y |
| Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
| Notice Eff Date/Time: 10/30/2025 10:22:34AM | Notice End Date/Time: 10/31/2025 9:00:00am |
| Post Date/Time: 10/30/2025 10:22:34 AM | Notice ID: 626592 |
| Reqrd Rsp: 1 | Rsp Date: 10/30/2025 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: SOC Declaration - Location Specific Pack |
Notice Text
STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific PACK
EFFECTIVE DATE: October 30, 2025
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following locations.
DMINDSCA (57248)
DPD HUR (300960)
DMORSMLT (330073)
DJAVELIN (54866)
OPERATING CONDITION SUMMARY: The EPNG system linepack starts Gas Day October 30, 2025, within an acceptable level at 7,952 MMcf. Continued packing by the locations listed above undermine EPNG's ability to maintain system linepack within acceptable levels and manage system integrity.
Deliveries below scheduled quantities.
Receipts in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to ensure that system integrity is maintained.
EPNG RESPONSE:
- Washington Ranch is available for maximum injection.
- Supply operators have been or will be contacted and per Section 11.2(a)(ii) of the tariff, notified that EPNG will invoke flow control if they do not reduce their deliveries into the EPNG system to match their scheduled quantities.
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at media_relations@kindermorgan.com.
| TSP/TSP Name: 8001703-EL PASO NATURAL GAS CO. L.L.C. | Critical: Y |
| Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
| Notice Eff Date/Time: 10/30/2025 10:22:34AM | Notice End Date/Time: 10/31/2025 9:00:00am |
| Post Date/Time: 10/30/2025 10:22:34 AM | Notice ID: 626592 |
| Reqrd Rsp: 1 | Rsp Date: 10/30/2025 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: SOC Declaration - Location Specific Pack |
Notice Text
STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific PACK
EFFECTIVE DATE: October 30, 2025
IMBALANCE TOLERANCE: 5%
DURATION: Until Further Notice
AFFECTED AREAS/LOCATIONS: Specific to the following locations.
DMINDSCA (57248)
DPD HUR (300960)
DMORSMLT (330073)
DJAVELIN (54866)
OPERATING CONDITION SUMMARY: The EPNG system linepack starts Gas Day October 30, 2025, within an acceptable level at 7,952 MMcf. Continued packing by the locations listed above undermine EPNG's ability to maintain system linepack within acceptable levels and manage system integrity.
Deliveries below scheduled quantities.
Receipts in excess of scheduled quantities.
CUSTOMER ACTION REQUIRED: Immediate action is required to ensure that system integrity is maintained.
EPNG RESPONSE:
- Washington Ranch is available for maximum injection.
- Supply operators have been or will be contacted and per Section 11.2(a)(ii) of the tariff, notified that EPNG will invoke flow control if they do not reduce their deliveries into the EPNG system to match their scheduled quantities.
For scheduling questions, please call your scheduling representative at (800) 238-3764.
For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.
For media inquiries, please contact media relations at media_relations@kindermorgan.com.