El Paso Natural Gas Notice 625209

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  OPERATIONAL ALERT Notice Type Desc (2):  ADVISORY/DIRECTIONAL NOTICE
Notice Eff Date/Time:  06/13/2025 8:05:56AM Notice End Date/Time:  06/14/2025 9:00:00am
Post Date/Time:  6/13/2025 8:05:56 AM Notice ID: 625209
Reqrd Rsp:  2 Rsp Date:  06/13/2025
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SOC Warning - Location Specific Pack
Notice Text:

WARNING OF STRAINED OPERATING CONDITION (SOC) – Location Specific PACK 

 

The EPNG system linepack level starts Gas Day June 13, 2025 above 8,190 MMcf, which is an increase of approximately 167 MMcf compared to the start of Gas Day June 12, 2025. The location(s) listed below continue to pack the system and undermine our ability to maintain linepack within acceptable levels. 

 

Washington Ranch is available for injection. 

 

The following locations have been contacted regarding their actual takes versus their scheduled volumes and the potential for being placed in a location specific SOC: 

 

DTEP S78 (301149)

IMSQUITE (398670)

 

Delivery point operators are encouraged to continue to take gas according to their scheduled quantities.  If the situation fails to improve EPNG will declare an SOC for a PACK condition. 

   

For scheduling questions, please call your scheduling representative at (800) 238-3764. 

 

For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.  

 

For media inquiries, please contact media relations at media_relations@kindermorgan.com. 

 

Dan English

EPNG Lead Controller

719-520-4722

 

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  OPERATIONAL ALERT Notice Type Desc (2):  ADVISORY/DIRECTIONAL NOTICE
Notice Eff Date/Time:  06/13/2025 8:05:56AM Notice End Date/Time:  06/14/2025 9:00:00am
Post Date/Time:  6/13/2025 8:05:56 AM Notice ID: 625209
Reqrd Rsp:  2 Rsp Date:  06/13/2025
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SOC Warning - Location Specific Pack
Notice Text:

WARNING OF STRAINED OPERATING CONDITION (SOC) – Location Specific PACK 

 

The EPNG system linepack level starts Gas Day June 13, 2025 above 8,190 MMcf, which is an increase of approximately 167 MMcf compared to the start of Gas Day June 12, 2025. The location(s) listed below continue to pack the system and undermine our ability to maintain linepack within acceptable levels. 

 

Washington Ranch is available for injection. 

 

The following locations have been contacted regarding their actual takes versus their scheduled volumes and the potential for being placed in a location specific SOC: 

 

DTEP S78 (301149)

IMSQUITE (398670)

 

Delivery point operators are encouraged to continue to take gas according to their scheduled quantities.  If the situation fails to improve EPNG will declare an SOC for a PACK condition. 

   

For scheduling questions, please call your scheduling representative at (800) 238-3764. 

 

For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.  

 

For media inquiries, please contact media relations at media_relations@kindermorgan.com. 

 

Dan English

EPNG Lead Controller

719-520-4722