Colorado Interstate Gas Company, L.L.C. September 30, 2026 Storage Bottom Hole Pressure Surveys - Update
|
|
The week that maintenance is scheduled for each field is listed below. Each field's maximum injection and withdrawal capability is shown as well as the field's related percentage of total injections/withdrawals and the net injection/withdrawal available for that week. These numbers are based on the projection that storage inventory will be within normal guidelines at the end of September.
Update – Flank Bottom Hole Morrow Zone end date has been adjusted from September 30 to October 2 |
|
Outage Scheduled |
Field |
NNT Injection |
NNT Withdrawal |
||||
|
|
|
Field Contribution to Injection (MMcf/d) |
Field Percentage of Total Injection |
Total NNT Injection Available during Outage (MMcf/d) |
Field Contribution to Total Withdrawal (MMcf/d) |
Field Percentage of Total Withdrawal |
Total NNT Withdrawal Available during Outage (MMcf/d) |
|
September 23 – October 2 |
Flank- Morrow |
75* |
23.1 |
325 |
120 |
20.3 |
532 |
|
September 15 – September 22 |
Flank - Cherokee |
75* |
23.1 |
325 |
120 |
22.6 |
472 |
|
September 15 – September 22 |
Latigo |
65 |
20.0 |
260 |
38 |
9.3 |
370 |
|
September 23 – September 30 |
Ft. Morgan |
125 |
38.5 |
200 |
270 |
60.1 |
179 |
|
October 12 – October 19 |
Boehm |
60 |
18.5 |
265 |
10 |
2.9 |
331 |
|
*Note: Flank has two reservoirs which will be tested separately. Flank Morrow reservoir will be tested beginning September 23 through October 2, and Flank Cherokee reservoir will be tested beginning September 15 through September 22. The impact to injection capability will be minimal, and no reductions to customer's firm injection rights will be made during these separate Flank Bottom Hole Pressure Surveys. |
|
During the Bottom Hole Pressure Surveys for FT. Morgan, Latigo and Boehm firm shippers' ADIQ will be reduced by the percentage indicted above consistent with Part IV: General Terms and Conditions (GT&C) Sections 1.2(c) and 11.6 of CIG's FERC Gas Tariff Second Revised Volume No.1. For example, during Ft. Morgan maintenance, shippers will be limited to 61.5% (100-38.5) of the Standard ADIQ |
Other Impacts to Shippers:
|
1. Shippers are asked to manage flowing supplies to keep injections and withdrawals within the adjusted limits. If small injection overruns occur, they will be based on the adjusted limits and will be authorized for NNT customers. However, if operational concerns arise because of higher levels of overrun injections, a Strained Operating Condition (SOC) may need to be implemented, and overruns will not be authorized. |
|
2. During the week of the Ft. Morgan outage, injections under the High Available Daily Injection Quantity (High ADIQ) option described in GT&C Section 1.2 will not be supported. |
|
3. Injections to and withdrawals from interruptible storage accounts will not be scheduled during the period of Bottom Hole Pressure Surveys. |
|
For scheduling questions, please contact the Nominations and Scheduling Hotline 1-800-238-3764, option 2. |
|
Any comments or questions about this report should be directed to Hayden Garfield (719) 726-5311 or Mike Burleson (719) 640-1577. |
|
For contractual issues, please contact your Marketing Representative. |
|
Thank you for your assistance during this storage field maintenance. |
|
Mike Burleson |
|
Manager, CIG Gas Control Kinder Morgan Western Pipelines |
|
Colorado Interstate Gas Company, L.L.C. September 30, 2026 Storage Bottom Hole Pressure Surveys - Update
|
|
The week that maintenance is scheduled for each field is listed below. Each field's maximum injection and withdrawal capability is shown as well as the field's related percentage of total injections/withdrawals and the net injection/withdrawal available for that week. These numbers are based on the projection that storage inventory will be within normal guidelines at the end of September.
Update – Flank Bottom Hole Morrow Zone end date has been adjusted from September 30 to October 2 |
|
Outage Scheduled |
Field |
NNT Injection |
NNT Withdrawal |
||||
|
|
|
Field Contribution to Injection (MMcf/d) |
Field Percentage of Total Injection |
Total NNT Injection Available during Outage (MMcf/d) |
Field Contribution to Total Withdrawal (MMcf/d) |
Field Percentage of Total Withdrawal |
Total NNT Withdrawal Available during Outage (MMcf/d) |
|
September 23 – October 2 |
Flank- Morrow |
75* |
23.1 |
325 |
120 |
20.3 |
532 |
|
September 15 – September 22 |
Flank - Cherokee |
75* |
23.1 |
325 |
120 |
22.6 |
472 |
|
September 15 – September 22 |
Latigo |
65 |
20.0 |
260 |
38 |
9.3 |
370 |
|
September 23 – September 30 |
Ft. Morgan |
125 |
38.5 |
200 |
270 |
60.1 |
179 |
|
October 12 – October 19 |
Boehm |
60 |
18.5 |
265 |
10 |
2.9 |
331 |
|
*Note: Flank has two reservoirs which will be tested separately. Flank Morrow reservoir will be tested beginning September 23 through October 2, and Flank Cherokee reservoir will be tested beginning September 15 through September 22. The impact to injection capability will be minimal, and no reductions to customer's firm injection rights will be made during these separate Flank Bottom Hole Pressure Surveys. |
|
During the Bottom Hole Pressure Surveys for FT. Morgan, Latigo and Boehm firm shippers' ADIQ will be reduced by the percentage indicted above consistent with Part IV: General Terms and Conditions (GT&C) Sections 1.2(c) and 11.6 of CIG's FERC Gas Tariff Second Revised Volume No.1. For example, during Ft. Morgan maintenance, shippers will be limited to 61.5% (100-38.5) of the Standard ADIQ |
Other Impacts to Shippers:
|
1. Shippers are asked to manage flowing supplies to keep injections and withdrawals within the adjusted limits. If small injection overruns occur, they will be based on the adjusted limits and will be authorized for NNT customers. However, if operational concerns arise because of higher levels of overrun injections, a Strained Operating Condition (SOC) may need to be implemented, and overruns will not be authorized. |
|
2. During the week of the Ft. Morgan outage, injections under the High Available Daily Injection Quantity (High ADIQ) option described in GT&C Section 1.2 will not be supported. |
|
3. Injections to and withdrawals from interruptible storage accounts will not be scheduled during the period of Bottom Hole Pressure Surveys. |
|
For scheduling questions, please contact the Nominations and Scheduling Hotline 1-800-238-3764, option 2. |
|
Any comments or questions about this report should be directed to Hayden Garfield (719) 726-5311 or Mike Burleson (719) 640-1577. |
|
For contractual issues, please contact your Marketing Representative. |
|
Thank you for your assistance during this storage field maintenance. |
|
Mike Burleson |
|
Manager, CIG Gas Control Kinder Morgan Western Pipelines |