Critical Notice:
Yes
Notice Type:
Pipeline Conditions
Mode: Critical
Affected Locations: System Wide
Subject:
Unplanned Outage – Holbrook C/S
Cameron Interstate Pipeline (CIP) provided notice of an unplanned outage at its Holbrook Compressor
Station due to mechanical failure (notice ID# 227), and subsequently posted a notice of reduced capacity,
as a result of the outage (notice ID# 229).
A significant portion of the work required to return the facility to full operational strength has been
completed. The remaining repairs, based on vendor schedules and best available data, are estimated to
be complete on or before 4/3/2022.
Effective immediately, Holbrook Station capacity increases to 1,559,730 Dth/d. However, restrictions may
again become necessary with short or no notice for the duration of the unplanned outage.
Updates will be provided via informational postings to Pipeline’s EBB: CIP Informational Postings
Please contact a scheduling representative if you have any questions.
Team: FrontOffice@SempraGlobal.com
Day (M-F)
Evening (M-F)
Weekend
Secondary
Name:
Eric Perez
Shawnna Sallee
Katherine Silva
Guy Ross
Office:
281.423.2704
281.423.2715
Mobile:
832.835.7726
832.819.7292
832.492.3433
832.415.6407
Email: EPerez@SempraGlobal.com SSallee@SempraGlobal.com KSilva@SempraGlobal.com GuyRoss@SempraGlobal.com
ICE Chat:
eperez7
ssallee
ksilva2
gross5
March 27, 2022
Critical Notice:
Yes
Notice Type:
Pipeline Conditions
Mode: Critical
Affected Locations: System Wide
Subject:
Unplanned Outage – Holbrook C/S
Cameron Interstate Pipeline (CIP) provided notice of an unplanned outage at its Holbrook Compressor
Station due to mechanical failure (notice ID# 227), and subsequently posted a notice of reduced capacity,
as a result of the outage (notice ID# 229).
A significant portion of the work required to return the facility to full operational strength has been
completed. The remaining repairs, based on vendor schedules and best available data, are estimated to
be complete on or before 4/3/2022.
Effective immediately, Holbrook Station capacity increases to 1,559,730 Dth/d. However, restrictions may
again become necessary with short or no notice for the duration of the unplanned outage.
Updates will be provided via informational postings to Pipeline’s EBB: CIP Informational Postings
Please contact a scheduling representative if you have any questions.
Team: FrontOffice@SempraGlobal.com
Day (M-F)
Evening (M-F)
Weekend
Secondary
Name:
Eric Perez
Shawnna Sallee
Katherine Silva
Guy Ross
Office:
281.423.2704
281.423.2715
Mobile:
832.835.7726
832.819.7292
832.492.3433
832.415.6407
Email: EPerez@SempraGlobal.com SSallee@SempraGlobal.com KSilva@SempraGlobal.com GuyRoss@SempraGlobal.com
ICE Chat:
eperez7
ssallee
ksilva2
gross5