Update - Notice of Force Majeure Event - Unplanned Outage Station 50 Main Unit 9
Transco 1w ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| Critical: | Y |
| Notice Eff Date: | 09/29/2026 |
| Notice Eff Time: | 16:00:40 CDT |
| Notice End Date: | |
| Notice End Time: | |
| Notice ID: | 17328691 |
| Notice Stat Desc: | Supersede |
| Notice Type Desc: | Force Maj |
| Post Date: | 09/29/2026 |
| Post Time: | 16:00:40 CDT |
| Prior Notice: | 17324005 |
| Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
| Rsp Date: | |
| Rsp Time: | |
| TSP: | 007933021 |
| TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Update - Notice of Force Majeure Event - Unplanned Outage Station 50 Main Unit 9
Transco issued a Force Majeure Event on 9/28/2026 resulting in an unplanned outage at Compressor Station 50 due to the Variable Frequency Drive on Main Unit 9 failing.
Transco immediately restricted scheduled quantities moving south to north through the TSB below effective timely gas day 9/29/2026. Repairs are underway and are expected to be completed by the end of the week. Additional updates will be provided as they are available.
The receipt-based Throughput Section Boundary (TSB) at mainline MP 517 (Station 50) will be used to manage capacity availability during this outage. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name Location | Location ID | Flow Direction |
COMPRESSOR STATION W 50 MP 517.23 | 9013363 | South to North |
Estimated Outage | Design Capacity (Mdt/d) | Total Qty Available (Mdt/d) | % Available Total Primary-Firm vs Design Capacity | % Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization) |
9/29 Timely - UFN | 1,536 | 1,300 | 85% | 5-12% |
If you have any questions, please contact your Transportation Services Representative.
| Critical: | Y |
| Notice Eff Date: | 09/29/2026 |
| Notice Eff Time: | 16:00:40 CDT |
| Notice End Date: | |
| Notice End Time: | |
| Notice ID: | 17328691 |
| Notice Stat Desc: | Supersede |
| Notice Type Desc: | Force Maj |
| Post Date: | 09/29/2026 |
| Post Time: | 16:00:40 CDT |
| Prior Notice: | 17324005 |
| Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
| Rsp Date: | |
| Rsp Time: | |
| TSP: | 007933021 |
| TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Update - Notice of Force Majeure Event - Unplanned Outage Station 50 Main Unit 9
Transco issued a Force Majeure Event on 9/28/2026 resulting in an unplanned outage at Compressor Station 50 due to the Variable Frequency Drive on Main Unit 9 failing.
Transco immediately restricted scheduled quantities moving south to north through the TSB below effective timely gas day 9/29/2026. Repairs are underway and are expected to be completed by the end of the week. Additional updates will be provided as they are available.
The receipt-based Throughput Section Boundary (TSB) at mainline MP 517 (Station 50) will be used to manage capacity availability during this outage. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name Location | Location ID | Flow Direction |
COMPRESSOR STATION W 50 MP 517.23 | 9013363 | South to North |
Estimated Outage | Design Capacity (Mdt/d) | Total Qty Available (Mdt/d) | % Available Total Primary-Firm vs Design Capacity | % Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization) |
9/29 Timely - UFN | 1,536 | 1,300 | 85% | 5-12% |
If you have any questions, please contact your Transportation Services Representative.