Station 60 Mainline C (Job 808136) 2026 Planned Outage and Maintenance Summary
Transco 3w ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| Critical: | Y |
| Notice Eff Date: | 09/18/2026 |
| Notice Eff Time: | 10:26:06 CDT |
| Notice End Date: | |
| Notice End Time: | |
| Notice ID: | 17285443 |
| Notice Stat Desc: | Initiate |
| Notice Type Desc: | Maint |
| Post Date: | 09/18/2026 |
| Post Time: | 10:26:06 CDT |
| Prior Notice: | |
| Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
| Rsp Date: | |
| Rsp Time: | |
| TSP: | 007933021 |
| TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Station 60 Mainline C (Job 808136) 2026 Planned Outage and Maintenance Summary
Transco will be performing a necessary line outage for integrity assessments between the 60C0 valve and 60C10 on Transco’s Mainline C associated with Job # 808136 on its 2026 Planned Outage and Maintenance Summary. The current schedule for this maintenance is October 20, 2026 through November 4, 2026.
The Throughput Section Boundary (TSB) at mainline MP 588.62 (Station 60) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name Location | Location ID | Flow Direction |
Compressor Station 60 MP 588.62 | 9000000 | South to North |
Date | Design Capacity (Mdt/d) | Total Qty Available (Mdt/d) | % Available Total Primary-Firm vs Design Capacity | % Cuts (Primary) Potential Shipper Impact (Based on Historical Utilization)* |
Oct 20 -Nov 4 | 2,133 | 1,603 | 75% | 5-10% |
*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
| Critical: | Y |
| Notice Eff Date: | 09/18/2026 |
| Notice Eff Time: | 10:26:06 CDT |
| Notice End Date: | |
| Notice End Time: | |
| Notice ID: | 17285443 |
| Notice Stat Desc: | Initiate |
| Notice Type Desc: | Maint |
| Post Date: | 09/18/2026 |
| Post Time: | 10:26:06 CDT |
| Prior Notice: | |
| Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
| Rsp Date: | |
| Rsp Time: | |
| TSP: | 007933021 |
| TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Station 60 Mainline C (Job 808136) 2026 Planned Outage and Maintenance Summary
Transco will be performing a necessary line outage for integrity assessments between the 60C0 valve and 60C10 on Transco’s Mainline C associated with Job # 808136 on its 2026 Planned Outage and Maintenance Summary. The current schedule for this maintenance is October 20, 2026 through November 4, 2026.
The Throughput Section Boundary (TSB) at mainline MP 588.62 (Station 60) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.
TSB Name Location | Location ID | Flow Direction |
Compressor Station 60 MP 588.62 | 9000000 | South to North |
Date | Design Capacity (Mdt/d) | Total Qty Available (Mdt/d) | % Available Total Primary-Firm vs Design Capacity | % Cuts (Primary) Potential Shipper Impact (Based on Historical Utilization)* |
Oct 20 -Nov 4 | 2,133 | 1,603 | 75% | 5-10% |
*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.