Transco Icon

Station 33 (Job 780583) 2026 Planned Outage and Maintenance Summary

Transco 2mo ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 08/10/2026
Notice Eff Time: 09:57:28 CDT
Notice End Date:
Notice End Time:
Notice ID: 17150942
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 08/10/2026
Post Time: 09:57:28 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 33 (Job 780583) 2026 Planned Outage and Maintenance Summary

Transco will be performing a necessary compressor station outage associated with Job #780583 on its 2026 Planned Outage and Maintenance Summary.  This outage is required to complete facility modifications at Station 33. The current schedule for this maintenance is for one day on October 27, 2026.

Operating Conditions resulting from this work will require Transco to limit scheduled quantities for all transportation priorities moving south to north through the location indicated below.

The location Throughput Section Boundaries (“TSB”) for station 33 at mainline milepost 284.5 S-N will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSBs and the available quantity of primary-firm transportation priority during the indicated period.

TSB Name - Location

Location ID

Flow Direction

Sta 33 MP 284.5 S to N

9012003

South to North

 

 

Estimated Outage

Design Capacity (Mdt/d)

Total Qty Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization)   

Oct. 27

709

574

81%

12-15%

 

 

If you have any questions, please contact your Transportation Services Representative.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 08/10/2026
Notice Eff Time: 09:57:28 CDT
Notice End Date:
Notice End Time:
Notice ID: 17150942
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 08/10/2026
Post Time: 09:57:28 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 33 (Job 780583) 2026 Planned Outage and Maintenance Summary

Transco will be performing a necessary compressor station outage associated with Job #780583 on its 2026 Planned Outage and Maintenance Summary.  This outage is required to complete facility modifications at Station 33. The current schedule for this maintenance is for one day on October 27, 2026.

Operating Conditions resulting from this work will require Transco to limit scheduled quantities for all transportation priorities moving south to north through the location indicated below.

The location Throughput Section Boundaries (“TSB”) for station 33 at mainline milepost 284.5 S-N will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSBs and the available quantity of primary-firm transportation priority during the indicated period.

TSB Name - Location

Location ID

Flow Direction

Sta 33 MP 284.5 S to N

9012003

South to North

 

 

Estimated Outage

Design Capacity (Mdt/d)

Total Qty Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization)   

Oct. 27

709

574

81%

12-15%

 

 

If you have any questions, please contact your Transportation Services Representative.