Transco Icon

Station 35 Tool Runs (Job 134423) 2026 Planned Outage and Maintenance Summary

Transco 5d ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 05/21/2026
Notice Eff Time: 13:06:28 CDT
Notice End Date:
Notice End Time:
Notice ID: 16881851
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 05/21/2026
Post Time: 13:06:28 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 35 Tool Runs (Job 134423) 2026 Planned Outage and Maintenance Summary

Transco will be performing necessary pipeline integrity assessments between Station 35 and Station 40 associated with Job #134423 on its 2026 Planned Outage and Maintenance Summary. This maintenance activity will impact the availability of all transportation services moving south to north through Station 35 for the dates below.

The specific dates that will be impacted during the pig runs are subject to change, but the current schedule is outlined below:

Pig Runs

Dates

Chemical Cleaner Tool

8/11

Chemical Cleaner Tool

8/13

Chemical Cleaner Tool

8/18

Cleaner Tool

8/20

HS/Combo Tool

8/25

EMAT Tool

8/27

Operating Conditions resulting from this work will require Transco to restrict scheduled quantities for all transportation priorities moving south to north through the location indicated below.

The Throughput Section Boundaries (“TSB’s”) for Station 35 at mainline milepost 327.27 S-N will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSB and the available quantity of all transportation priorities during the indicated period.

TSB Name - Location

Location ID

Flow Direction

ML S35 S to N MP 327.27

9011644

South to North

 

 

Estimated Outage

Location ID

Design Capacity (Dt/d)

Total Quantity Available (Dt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*

Aug 11, Aug 13, Aug 18

9011644

708,995

 

584,000

 

82%

5-12%

Aug 20, Aug 25, Aug 27

9011644

708,995

594,000

84%

5-10%

 

*% Cuts (Primary) is an estimate of the impact to primary firm shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.

If you have any questions, please contact your Transportation Services Representative.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 05/21/2026
Notice Eff Time: 13:06:28 CDT
Notice End Date:
Notice End Time:
Notice ID: 16881851
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 05/21/2026
Post Time: 13:06:28 CDT
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 35 Tool Runs (Job 134423) 2026 Planned Outage and Maintenance Summary

Transco will be performing necessary pipeline integrity assessments between Station 35 and Station 40 associated with Job #134423 on its 2026 Planned Outage and Maintenance Summary. This maintenance activity will impact the availability of all transportation services moving south to north through Station 35 for the dates below.

The specific dates that will be impacted during the pig runs are subject to change, but the current schedule is outlined below:

Pig Runs

Dates

Chemical Cleaner Tool

8/11

Chemical Cleaner Tool

8/13

Chemical Cleaner Tool

8/18

Cleaner Tool

8/20

HS/Combo Tool

8/25

EMAT Tool

8/27

Operating Conditions resulting from this work will require Transco to restrict scheduled quantities for all transportation priorities moving south to north through the location indicated below.

The Throughput Section Boundaries (“TSB’s”) for Station 35 at mainline milepost 327.27 S-N will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the TSB and the available quantity of all transportation priorities during the indicated period.

TSB Name - Location

Location ID

Flow Direction

ML S35 S to N MP 327.27

9011644

South to North

 

 

Estimated Outage

Location ID

Design Capacity (Dt/d)

Total Quantity Available (Dt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*

Aug 11, Aug 13, Aug 18

9011644

708,995

 

584,000

 

82%

5-12%

Aug 20, Aug 25, Aug 27

9011644

708,995

594,000

84%

5-10%

 

*% Cuts (Primary) is an estimate of the impact to primary firm shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.

If you have any questions, please contact your Transportation Services Representative.