Transco Icon

Station 160 (Job 1170417) 2026 Planned Outage and Maintenance Summary

Transco 2w ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 02/09/2026
Notice Eff Time: 07:08:35 CST
Notice End Date:
Notice End Time:
Notice ID: 16547111
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 02/09/2026
Post Time: 07:08:35 CST
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 160 (Job 1170417) 2026 Planned Outage and Maintenance Summary

Transco will be performing a necessary station outage associated with Job #1170417on its 2026 Planned Outage and Maintenance Summary. This maintenance activity will impact the availability of primary firm transportation services through Station 160. The current schedule for this maintenance is March 17, 2026 through March 20, 2026

 

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through the location will not be available.

 

Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving north to south through Station 160. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through this location will not be impacted.

 

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1369.45 south of Station 160 will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of primary-firm transportation services during the indicated period.

 

TSB Name - Location

Location ID

Flow Direction

MAINLINE MP 1369.45 N to S NL

9012663

North to South

 

 

Estimated Outage

Design Capacity (Mdt/d)

Total Qty Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization)   

Mar. 17 – Mar. 20, 2026

2,221

1,879

85%

10-15%

 

 

 

If you have any questions, please contact your Transportation Services Representative.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 02/09/2026
Notice Eff Time: 07:08:35 CST
Notice End Date:
Notice End Time:
Notice ID: 16547111
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 02/09/2026
Post Time: 07:08:35 CST
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 160 (Job 1170417) 2026 Planned Outage and Maintenance Summary

Transco will be performing a necessary station outage associated with Job #1170417on its 2026 Planned Outage and Maintenance Summary. This maintenance activity will impact the availability of primary firm transportation services through Station 160. The current schedule for this maintenance is March 17, 2026 through March 20, 2026

 

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through the location will not be available.

 

Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving north to south through Station 160. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through this location will not be impacted.

 

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 1369.45 south of Station 160 will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of primary-firm transportation services during the indicated period.

 

TSB Name - Location

Location ID

Flow Direction

MAINLINE MP 1369.45 N to S NL

9012663

North to South

 

 

Estimated Outage

Design Capacity (Mdt/d)

Total Qty Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary)Potential Shipper Impact (Based on Historical Utilization)   

Mar. 17 – Mar. 20, 2026

2,221

1,879

85%

10-15%

 

 

 

If you have any questions, please contact your Transportation Services Representative.