Station 50 (Job 631201) Outage 2026 Planned Outage and Maintenance Summary

Transco 2w ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 02/05/2026
Notice Eff Time: 13:09:27 CST
Notice End Date:
Notice End Time:
Notice ID: 16534796
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 02/05/2026
Post Time: 13:09:27 CST
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 50 (Job 631201) Outage 2026 Planned Outage and Maintenance Summary

Transco will be performing a necessary partial compressor station outage associated with Job #631201 on its 2026 Planned Outage and Maintenance Summary. This activity requires a partial compressor station outage with main unit 9 for an equipment upgrade that will impact the availability of primary-firm transportation services moving south to north through Compressor Station 50. The current schedule is March 3, 2026 through March 6, 2026.

 

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving through the location may not be available.

Operating Conditions resulting from this work will require Transco to manage all transportation services south to north through the location listed below. The total quantity available will be contingent on system conditions during the maintenance period, but is anticipated to be limited to the quantity indicated below. Transactions moving north to south through this location will not be impacted.

 

The receipt-based Throughput Section Boundary (TSB) at mainline MP 517.23 (Station 50 West) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.

TSB Name - Location

Location ID

Flow Direction

COMPRESSOR STATION W 50 MP 517.23

9013363

South to North

 

 

Design Capacity (MDt/d)

Total Quantity Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*

1,535

1,265

82%

0-10%

 

 

*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.

 

If you have any questions, please contact your Transportation Services Representative.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 02/05/2026
Notice Eff Time: 13:09:27 CST
Notice End Date:
Notice End Time:
Notice ID: 16534796
Notice Stat Desc: Initiate
Notice Type Desc: Maint
Post Date: 02/05/2026
Post Time: 13:09:27 CST
Prior Notice: 0
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Station 50 (Job 631201) Outage 2026 Planned Outage and Maintenance Summary

Transco will be performing a necessary partial compressor station outage associated with Job #631201 on its 2026 Planned Outage and Maintenance Summary. This activity requires a partial compressor station outage with main unit 9 for an equipment upgrade that will impact the availability of primary-firm transportation services moving south to north through Compressor Station 50. The current schedule is March 3, 2026 through March 6, 2026.

 

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving through the location may not be available.

Operating Conditions resulting from this work will require Transco to manage all transportation services south to north through the location listed below. The total quantity available will be contingent on system conditions during the maintenance period, but is anticipated to be limited to the quantity indicated below. Transactions moving north to south through this location will not be impacted.

 

The receipt-based Throughput Section Boundary (TSB) at mainline MP 517.23 (Station 50 West) will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of all transportation services during the indicated period.

TSB Name - Location

Location ID

Flow Direction

COMPRESSOR STATION W 50 MP 517.23

9013363

South to North

 

 

Design Capacity (MDt/d)

Total Quantity Available (Mdt/d)

% Available Total Primary-Firm vs Design Capacity

% Cuts (Primary) – Potential Shipper Impact (Based on Historical Utilization)*

1,535

1,265

82%

0-10%

 

 

*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.

 