Job 249566 Station 70 Planned Outage and Maintenance Summary
Transco 1w ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Critical: | Y |
Notice Eff Date: | 08/14/2025 |
Notice Eff Time: | 14:23:49 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 15956901 |
Notice Stat Desc: | Initiate |
Notice Type Desc: | Maint |
Post Date: | 08/14/2025 |
Post Time: | 14:23:49 CDT |
Prior Notice: | 0 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Job 249566 Station 70 Planned Outage and Maintenance Summary
Transco will require a Compressor Station outage associated with Job #249566 on its 2025 Planned Outage and Maintenance Summary. This outage is necessary for electrical maintenance and new unit installation at Station 70. The current schedule for this maintenance is September 16, 2025 through September 21, 2025.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving south to north through the location may not be available.
Operating conditions resulting from this work will require Transco to manage all transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions during the maintenance period. Transactions moving north to south through this location will not be impacted.
The receipt-based Throughput Section Boundary (TSB) at mainline milepost 662 (Station 70) will be used to manage the available capacity during this planned work. An updated Market and Production Area constraint notice will include the TSB location and the available quantity of all transportation services during the Maintenance Period.
TSB Name - Location |
Location ID |
Flow Direction |
Station 70 MP 662 |
9011500 |
South to North |
Estimated Outage |
Design Capacity (Mdt/d) |
Total Primary-Firm Qty Available (Mdt/d) |
% Available Total Primary-Firm vs Design Capacity |
% Cuts (Primary) - Potential Shipper Impact (Based on Historical Utilization)* |
Sept 16-21 |
3,344 |
2,000 |
60% |
5-20% |
*% Cuts (Primary) is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.
Critical: | Y |
Notice Eff Date: | 08/14/2025 |
Notice Eff Time: | 14:23:49 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 15956901 |
Notice Stat Desc: | Initiate |
Notice Type Desc: | Maint |
Post Date: | 08/14/2025 |
Post Time: | 14:23:49 CDT |
Prior Notice: | 0 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: Job 249566 Station 70 Planned Outage and Maintenance Summary
Transco will require a Compressor Station outage associated with Job #249566 on its 2025 Planned Outage and Maintenance Summary. This outage is necessary for electrical maintenance and new unit installation at Station 70. The current schedule for this maintenance is September 16, 2025 through September 21, 2025.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving south to north through the location may not be available.
Operating conditions resulting from this work will require Transco to manage all transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions during the maintenance period. Transactions moving north to south through this location will not be impacted.
The receipt-based Throughput Section Boundary (TSB) at mainline milepost 662 (Station 70) will be used to manage the available capacity during this planned work. An updated Market and Production Area constraint notice will include the TSB location and the available quantity of all transportation services during the Maintenance Period.
TSB Name - Location |
Location ID |
Flow Direction |
Station 70 MP 662 |
9011500 |
South to North |
Estimated Outage |
Design Capacity (Mdt/d) |
Total Primary-Firm Qty Available (Mdt/d) |
% Available Total Primary-Firm vs Design Capacity |
% Cuts (Primary) - Potential Shipper Impact (Based on Historical Utilization)* |
Sept 16-21 |
3,344 |
2,000 |
60% |
5-20% |
*% Cuts (Primary) is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.