RESTRICTIONS FOR 03-03-2026 EC
Tennessee Gas Pipeline 1mo ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 03/02/2026 7:23:55PM | Notice End Date/Time: 03/03/2026 9:00:00am |
| Post Date/Time: 3/2/2026 7:23:55 PM | Notice ID: 399678 |
| Reqrd Rsp: 1 | Rsp Date: 03/02/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 03-03-2026 EC |
Effective Evening Cycle (9:00) for the gas day of Tuesday, March 03, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 for all areas east of Sta 245 on the 200 Line and ALL AREAS EAST OF STA 321 ON the 300 Line for over-takes from the system or under-deliveries into the system for all Balancing Parties
METER RESTRICTIONS
· GULFSTH/TGP Kiln Miss Exchange Hanc Delivery Meter (Pin 420383) - through 100% of SA receipt increases due to displacement gas unavailable for backhaul; 4,169 Dths
· TGP/MEP Jasper Receipt Meter (Pin 44577) - through 100% of SIPps delivery increases due to displacement gas unavailable for backhaul; 10,001 Dths
· TGP/SNG Pugh Mississippi Exch Lownd Receipt Meter (Pin 420294) - through 100% of SOP increases due to operational concerns; 5,000 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 78% of SIPps increases due to nominations in excess of operational capacity; 93,884 Dths
· Wright Receipt Meter (Pin 412181) - through approx 48% of SOP increases due to nominations in excess of operational capacity; 111,774 Dths
SEGMENT RESTRICTIONS
· STA 1 (Segment 101 BH) - through approx 88% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 31,190 Dths
· STA 25 (Segment 125 FH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 83,578 Dths
· STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 11,160 Dths
· STA 860 (Segment 860 BH) - through PIP increases due to scheduled maintenance and nominations in excess of operational capacity
· STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 345,632 Dths
· MLV 314 East (Segment 314 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 223,218 Dths
· STA 315 (Segment 315 BH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 173,356 Dths
· STA 317 (Segment 317 BH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 55,389 Dths
· STA 321 (Segment 321 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 663,014 Dths
· MLV 330 (Segment 324 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 213,277 Dths
· STA 219 North (Segment 219 FH) - through 100% of SOP increases due to operational concerns; 11,000 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 125,200 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 295,082 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 380,018 Dths
· STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 362,089 Dths
· STA 254 (Segment 249 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 149,207 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 189,522 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 03/02/2026 7:23:55PM | Notice End Date/Time: 03/03/2026 9:00:00am |
| Post Date/Time: 3/2/2026 7:23:55 PM | Notice ID: 399678 |
| Reqrd Rsp: 1 | Rsp Date: 03/02/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 03-03-2026 EC |
Effective Evening Cycle (9:00) for the gas day of Tuesday, March 03, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 for all areas east of Sta 245 on the 200 Line and ALL AREAS EAST OF STA 321 ON the 300 Line for over-takes from the system or under-deliveries into the system for all Balancing Parties
METER RESTRICTIONS
· GULFSTH/TGP Kiln Miss Exchange Hanc Delivery Meter (Pin 420383) - through 100% of SA receipt increases due to displacement gas unavailable for backhaul; 4,169 Dths
· TGP/MEP Jasper Receipt Meter (Pin 44577) - through 100% of SIPps delivery increases due to displacement gas unavailable for backhaul; 10,001 Dths
· TGP/SNG Pugh Mississippi Exch Lownd Receipt Meter (Pin 420294) - through 100% of SOP increases due to operational concerns; 5,000 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 78% of SIPps increases due to nominations in excess of operational capacity; 93,884 Dths
· Wright Receipt Meter (Pin 412181) - through approx 48% of SOP increases due to nominations in excess of operational capacity; 111,774 Dths
SEGMENT RESTRICTIONS
· STA 1 (Segment 101 BH) - through approx 88% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 31,190 Dths
· STA 25 (Segment 125 FH) - through approx 72% of SOP increases due to nominations in excess of operational capacity; 83,578 Dths
· STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 11,160 Dths
· STA 860 (Segment 860 BH) - through PIP increases due to scheduled maintenance and nominations in excess of operational capacity
· STA 307 (Segment 307 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 345,632 Dths
· MLV 314 East (Segment 314 BH) - through approx 91% of SOP increases due to nominations in excess of operational capacity; 223,218 Dths
· STA 315 (Segment 315 BH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 173,356 Dths
· STA 317 (Segment 317 BH) - through approx 67% of SOP increases due to nominations in excess of operational capacity; 55,389 Dths
· STA 321 (Segment 321 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 663,014 Dths
· MLV 330 (Segment 324 FH) - through approx 94% of SOP increases due to nominations in excess of operational capacity; 213,277 Dths
· STA 219 North (Segment 219 FH) - through 100% of SOP increases due to operational concerns; 11,000 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 125,200 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 295,082 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 380,018 Dths
· STA 249 (Segment 249 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 362,089 Dths
· STA 254 (Segment 249 FH) - through approx 95% of SOP increases due to nominations in excess of operational capacity; 149,207 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 189,522 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.