RESTRICTIONS FOR 02-07-2026 ID1
Tennessee Gas Pipeline 2w ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 02/07/2026 11:05:55AM | Notice End Date/Time: 02/08/2026 9:00:00am |
| Post Date/Time: 2/7/2026 11:05:55 AM | Notice ID: 399094 |
| Reqrd Rsp: 1 | Rsp Date: 02/07/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 02-07-2026 ID1 |
Effective Intraday 1 Cycle (14:00) for the gas day of Saturday, February 07, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 FOR ZONES L, 1, 2, 3, 4, 5 AND 6 FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· GULFSTH/TGP Coastal Bend Lng Wharto Delivery Meter (Pin 49524) - through 100% of SA receipt increases due to displacement gas unavailable for backhaul; 111 Dths
· Pine PRA/TGP Pine Prairie North Rap Delivery Meter (Pin 421043) - through 100% of SOP increases due to operational concerns; 902 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 96% of SIPps increases due to nominations in excess of operational capacity; 9,636 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 25,105 Dths
· STA 47 (Segment 143 FH) - through 100% of SOP increases due to operational concerns; 90,001 Dths
· STA 63 (Segment 163 FH) - through 100% of SOP increases due to operational concerns; 106,352 Dths
· STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 25,677 Dths
· STA 847 (Segment 847 FH) - through 100% of SOP increases due to operational concerns; 30,791 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 8,592 Dths
· STA 523 West (Segment 516 FH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 4,193 Dths
· MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 17,548 Dths
· STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 40,918 Dths
· STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 532,889 Dths
· STA 219 North (Segment 219 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 11,100 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 125,200 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 296,093 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,130 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to operational concerns; 6,946 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): PIPELINE CONDITIONS | Notice Type Desc (2): CURRENT PIPELINE CONDITIONS |
| Notice Eff Date/Time: 02/07/2026 11:05:55AM | Notice End Date/Time: 02/08/2026 9:00:00am |
| Post Date/Time: 2/7/2026 11:05:55 AM | Notice ID: 399094 |
| Reqrd Rsp: 1 | Rsp Date: 02/07/2026 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: RESTRICTIONS FOR 02-07-2026 ID1 |
Effective Intraday 1 Cycle (14:00) for the gas day of Saturday, February 07, 2026 Tennessee restricted the following:
OPERATIONAL FLOW ORDERS (OFO) AND IMBALANCE WARNINGS
OFO DAILY CRITICAL DAY 1 FOR ZONES L, 1, 2, 3, 4, 5 AND 6 FOR OVER-TAKES FROM THE SYSTEM OR UNDER-DELIVERIES INTO THE SYSTEM FOR ALL BALANCING PARTIES
EXCESSIVE HOURLY TAKES WARNING SYSTEMWIDE
METER RESTRICTIONS
· GULFSTH/TGP Coastal Bend Lng Wharto Delivery Meter (Pin 49524) - through 100% of SA receipt increases due to displacement gas unavailable for backhaul; 111 Dths
· Pine PRA/TGP Pine Prairie North Rap Delivery Meter (Pin 421043) - through 100% of SOP increases due to operational concerns; 902 Dths
· AGT/TGP Mahwah New Jersey Bergen Delivery Meter (Pin 420207) - through approx 96% of SIPps increases due to nominations in excess of operational capacity; 9,636 Dths
SEGMENT RESTRICTIONS
· STA 25 (Segment 125 FH) - through 100% of SOP increases due to scheduled maintenance and nominations in excess of operational capacity; 25,105 Dths
· STA 47 (Segment 143 FH) - through 100% of SOP increases due to operational concerns; 90,001 Dths
· STA 63 (Segment 163 FH) - through 100% of SOP increases due to operational concerns; 106,352 Dths
· STA 823 Muskrat Line (Segment 509 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 25,677 Dths
· STA 847 (Segment 847 FH) - through 100% of SOP increases due to operational concerns; 30,791 Dths
· STA 860 (Segment 860 BH) - through 100% of SOP increases due to operational concerns; 8,592 Dths
· STA 523 West (Segment 516 FH) - through approx 81% of SOP increases due to nominations in excess of operational capacity; 4,193 Dths
· MLV 314 East (Segment 314 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 17,548 Dths
· STA 317 (Segment 317 BH) - through 100% of SOP increases due to nominations in excess of operational capacity; 40,918 Dths
· STA 321 (Segment 321 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 532,889 Dths
· STA 219 North (Segment 219 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 11,100 Dths
· STA 224 (Segment 224 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 125,200 Dths
· Z5hc North (Segment 299 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 296,093 Dths
· STA 245 (Segment 245 FH) - through 100% of SOP increases due to nominations in excess of operational capacity; 10,130 Dths
· STA 261 Discharge East (Segment 261 FH) - through 100% of SOP increases due to operational concerns; 6,946 Dths
LINEPACK RESTRICTIONS
Payback nominations will be evaluated at each cycle and scheduled only if operationally feasible.
STORAGE RESTRICTIONS
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-AO at the following storage fields:
o Northern MA (460018)
o Portland MA (460025)
o Portland PA (460020)
o Bear Creek PA (460017)
· Customers who elected swing on storage or storage swing options for balancing (SOS or SSO) may only swing up to their Maximum Daily Withdrawal (MDWQ) until further notice
· No Authorized Overrun Withdrawal Services under Rate Schedule FS-F at the following storage field:
o Pine Prairie Virtual (54628)
· No Interruptible Storage Withdrawal Services under Rate Schedule IS at the following storage fields:
o Northern MA (460018) IS-MA
o Bear Creek PA (460017) IS-PA
· No Loans or Park Withdrawals under Rate Schedule PAL utilizing the PAL-D or PAL-AO services system-wide
**PLEASE NOTE MAXIMUM HOURLY ENTITLEMENTS ("MHE") AND/OR ELAPSED PRO RATA SCHEDULED QUANTITIES ("EPSQ") WILL BE REVIEWED AND MAY BE ENFORCED AT ANY METER DURING INTRADAY OR HOURLY CYCLES.
**FINAL VOLUMES MAY CHANGE DUE TO SYSTEM BALANCING AND/OR CONFIRMATION REDUCTIONS.
**THE OUTAGE AND MAINTENANCE SCHEDULE IS AVAILABLE IN EXCEL SPREADSHEET AND ADOBE FORMATS WHICH MAY BE ACCESSED VIA A HYPERLINK UNDER NOTICES/PLANNED SERVICE OUTAGES.
If you have any questions, please contact your Scheduler.