IMBALANCE WARNING FOR BAMAGAS 420942
Tennessee Gas Pipeline 4mo ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
| Notice Eff Date/Time: 11/29/2025 2:48:00PM | Notice End Date/Time: 11/30/2025 9:00:00am |
| Post Date/Time: 11/29/2025 2:48:00 PM | Notice ID: 397368 |
| Reqrd Rsp: 1 | Rsp Date: 11/29/2025 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: IMBALANCE WARNING FOR BAMAGAS 420942 |
IMBALANCE WARNING FOR BAMAGAS DELIVERY METER (420942) EFFECTIVE SATURDAY, NOVEMBER 29, 2025
In an effort to manage physical imbalances, Tennessee Gas Pipeline, LLC. (“Tennessee”) requires the Bamagas Delivery Meter (420942) keep actual daily takes out of the system equal to or greater than scheduled quantities.
Tennessee requires your compliance with this notice to avoid the necessity of taking further actions including utilizing contract or meter specific Operational Flow Orders or flow control to maintain operational integrity. As a reminder, penalties for non-compliance of an OFO can range from $.2198 per dth to $15.00 plus the highest regional spot price per dth.
Please contact your Scheduler if you have any questions.
| TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
| Notice Type Desc (1): OPERATIONAL FLOW ORDER | Notice Type Desc (2): OFO |
| Notice Eff Date/Time: 11/29/2025 2:48:00PM | Notice End Date/Time: 11/30/2025 9:00:00am |
| Post Date/Time: 11/29/2025 2:48:00 PM | Notice ID: 397368 |
| Reqrd Rsp: 1 | Rsp Date: 11/29/2025 |
| Notice Stat Desc: INITIATE | Prior Notice: |
| Subject: IMBALANCE WARNING FOR BAMAGAS 420942 |
IMBALANCE WARNING FOR BAMAGAS DELIVERY METER (420942) EFFECTIVE SATURDAY, NOVEMBER 29, 2025
In an effort to manage physical imbalances, Tennessee Gas Pipeline, LLC. (“Tennessee”) requires the Bamagas Delivery Meter (420942) keep actual daily takes out of the system equal to or greater than scheduled quantities.
Tennessee requires your compliance with this notice to avoid the necessity of taking further actions including utilizing contract or meter specific Operational Flow Orders or flow control to maintain operational integrity. As a reminder, penalties for non-compliance of an OFO can range from $.2198 per dth to $15.00 plus the highest regional spot price per dth.
Please contact your Scheduler if you have any questions.