TSP/TSP Name:  6900518-SOUTHERN NATURAL GAS CO. Critical: Y Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE Notice Eff Date/Time:  10/08/2026 2:03:24PM Notice End Date/Time:  10/09/2026 9:00:00am Post Date/Time:  10/8/2026 2:03:24 PM Notice ID: 712502 Reqrd Rsp:  1 Rsp Date/Time:  10/8/2026 12:00:00 AM Notice Stat Desc:  INITIATE Prior Notice:  Subject:  Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

Seven Day Forecast (updated 10/08/26)

 

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

 

-No anticipated impact to transportation services.

 

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Monday (10/12)

Tuesday (10/13)

Wednesday (10/14)

Thursday (10/15)

Friday (10/16)

Saturday (10/17)

Sunday (10/18)

 

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

203

 

203

 

203

 

203

 

203

 

203

 

203

 

203

 

 

Duncanville Lateral (segment 90)

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

 

Tarrant (segment 130

 

563

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel) Proj-4152-11-13 (9/16/2026 - 10/20/2026)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel) Proj-4152-12 (10/10/2026 - 10/30/2026)

 

Pell City Station (segment 140)

 

474

 

229

(245)

 

229

(245)

 

229

(245)

 

229

(245)

 

229

(245)

 

474

 

474

North Main loop line west of Dearmanville: Scheduled Pipeline Maintenance(remediation) Proj-4165(WB) (10/12/2026 - 10/16/2026)

 

Dearmanville (segment 150)

 

346

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

Bell Mills Compressor Station: Scheduled Unit Maintenance Proj-4500-1 (10/5/2026 - 10/18/2026)

 

White Castle (segment 340)

 

760

 

760

 

355

(405)

 

355

(405)

 

355

(405)

 

700

(60)

 

700

(60)

 

700

(60)

White Castle Compressor Station: Scheduled Unit Maintenance Proj-5010-8 (10/16/2026 - 10/30/2026)

White Castle Compressor Station: Scheduled Unit Maintenance Proj-5010-8-9-10 (10/13/2026 - 10/15/2026)

 

Sesh (segment 380)

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

 

Gwinville (segment 400)

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

 

Bay Springs (segment 420)

 

1,675

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

Bay Springs Compressor Station: Scheduled Unit Maintenance Proj-52161 (7/8/2025 - 10/31/2026)

 

Enterprise (segment 430)

 

2,306

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

Enterprise Compressor Station: Scheduled Unit Maintenance Proj-5222-15 (8/3/2026 - 10/31/2026)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (5/30/2026 - 10/31/2026)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

2,305

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

York Compressor Station: Scheduled Unit Maintenance Proj-5230-1 (10/5/2026 - 10/31/2026)

 

Gallion (Segment 440)

 

2,300

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

Gallion Compressor Station: Scheduled Unit Maintenance Proj-5236-10 (9/21/2026 - 10/21/2026)

 

Elmore (segment 460)

 

2,010

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

Elmore Compressor Station: Scheduled Unit Maintenance Proj-5251-12 (10/12/2026 - 10/18/2026)

 

Ellerslie (segment 490)

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

 

South Atlanta (segment 510)

 

522

 

522

 

522

 

522

 

522

 

522

 

522

 

522

 

 

Thomaston East (segment 530)

 

849

 

849

 

849

 

849

 

849

 

849

 

849

 

849

 

 

Ocmulgee (segment 530)

 

804

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

Ocmulgee Compressor Station: Scheduled Unit Maintenance Proj-5277-6 (9/22/2026 - 10/18/2026)

 

South Georgia (segment 650)

 

127

 

127

 

127

 

127

 

127

 

127

 

127

 

127

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

October 2026 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (9/28 - 10/4)

Week 2 (10/5 - 10/11)

Week 3 (10/12 - 10/18)

Week 4 (10/19 - 10/25)

Week 5 (10/26 - 11/1)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

203

 

 

 

 

 

203

 

 

203

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

 

 

 

36

 

 

36

 

 

 

Tarrant (segment 130)

 

 

563

 

 

 

 

518

(45)

 

538

(25)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel), Proj-4152-11-13 (9/16/2026 - 10/20/2026)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel), Proj-4152-12 (10/10/2026 - 10/30/2026)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel), Proj-4152-9 (10/20/2026 -

10/31/2026)

 

Dearmanville (segment 150)

 

 

346

 

 

 

 

326

(20)

 

326

(20)

Bell Mills Compressor Station: Scheduled Unit Maintenance, Proj-4500-02 (10/19/2026 - 10/29/2026)

 

White Castle (segment 340)

 

 

760

 

 

 

 

700

(60)

 

700

(60)

White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-8 (10/16/2026 - 10/30/2026)

 

 

Sesh (segment 380)

 

 

507

 

 

 

 

 

460

(47)

 

 

447

(60)

SESH: Scheduled Station Maintenance (M) (10/20/2026) SESH: Scheduled Station Maintenance (M) (10/21/2026 - 10/22/2026)

SESH: Scheduled Station Maintenance (M) (10/23/2026) SESH: Scheduled Station Maintenance (M) (10/27/2026) SESH: Scheduled Station Maintenance (M) (10/28/2026) SESH: Scheduled Station Maintenance (M) (10/29/2026)

 

Gwinville (segment 400)

 

 

234

 

 

 

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,675

 

 

 

 

1595

(80)

 

1560

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027) Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-52161 (7/8/2025 - 10/31/2026)

 

 

 

Enterprise (segment 430)

 

 

 

2,306

 

 

 

 

 

2126

(180)

 

 

2051

(255)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (11/1/2026 - 11/15/2026) Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (8/3/2026 - 10/31/2026) South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027) South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (5/30/2026 - 10/31/2026)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

 

2,305

 

 

 

 

2215

(90)

 

2050

(255)

York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (10/5/2026 - 10/31/2026) York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Gallion (Segment 440)

 

 

2,300

 

 

 

 

2030

(270)

 

2145

(155)

Gallion Compressor Station: Scheduled Unit Maintenance, Proj-5236-10 (9/21/2026 - 10/21/2026) South Main loop line east of Gallion: Scheduled Pipeline Maintenance(remediation), Proj-SNG-22002 (10/26/2026 - 11/1/2026)

 

Ellerslie (segment 490)

 

 

1,547

 

 

 

 

 

1,547

 

 

1,547

 

 

Thomaston West (segment 490)

 

 

1,535

 

 

 

 

1520

(15)

 

1520

(15)

Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-1 (10/19/2026 - 10/25/2026) Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-3 (10/26/2026 - 10/29/2026)

 

South Atlanta (segment 510)

 

 

522

 

 

 

 

 

522

 

 

522

 

 

Thomaston East (segment 530)

 

 

849

 

 

 

 

 

849

 

 

849

 

 

East/South Wrens (segment 560)

 

 

680

 

 

 

 

590

(90)

 

 

680

Wrens Compressor Station: Scheduled Unit Maintenance, Proj-5288-5 (10/19/2026 - 10/23/2026)

 

South Georgia (segment 650)

 

 

127

 

 

 

 

 

127

 

 

127

 

 

Holy Trinity (segment 655)

 

 

127

 

 

 

 

 

127

 

101

(26)

Holy Trinity Compressor Station: Scheduled Unit Maintenance, Proj-58051-2 (10/26/2026 - 10/30/2026)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

November 2026 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/2 - 11/8)

Week 2 (11/9 - 11/15)

Week 3 (11/16 - 11/22)

Week 4 (11/23 - 11/29)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

2195

(255)

 

2195

(255)

 

2400

(50)

 

2400

(50)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (11/1/2026 - 11/15/2026)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

 

2,449

 

2194

(255)

 

2194

(255)

 

 

2,449

 

 

2,449

York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

December 2026 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/30 - 12/6)

Week 2 (12/7 - 12/13)

Week 3 (12/14 - 12/20)

Week 4 (12/21 - 12/27)

Week 5 (12/28 - 1/3)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

January 2027 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (1/4 - 1/10)

Week 2 (1/11 - 1/17)

Week 3 (1/18 - 1/24)

Week 4 (1/25 - 1/31)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

 

 

 

 

 

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1

Bay Springs (segment 420)

 

1,817

1702

(115)

1702

(115)

1702

(115)

1702

(115)

(11/1/2026 - 3/31/2027)

 

 

 

 

 

 

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO

Enterprise (segment 430)

 

2,450

2400

(50)

2400

(50)

2400

(50)

2400

(50)

(11/1/2026 - 3/31/2027)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

TSP/TSP Name:  6900518-SOUTHERN NATURAL GAS CO. Critical: Y Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE Notice Eff Date/Time:  10/08/2026 2:03:24PM Notice End Date/Time:  10/09/2026 9:00:00am Post Date/Time:  10/8/2026 2:03:24 PM Notice ID: 712502 Reqrd Rsp:  1 Rsp Date/Time:  10/8/2026 12:00:00 AM Notice Stat Desc:  INITIATE Prior Notice:  Subject:  Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

Seven Day Forecast (updated 10/08/26)

 

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

 

-No anticipated impact to transportation services.

 

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Monday (10/12)

Tuesday (10/13)

Wednesday (10/14)

Thursday (10/15)

Friday (10/16)

Saturday (10/17)

Sunday (10/18)

 

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

203

 

203

 

203

 

203

 

203

 

203

 

203

 

203

 

 

Duncanville Lateral (segment 90)

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

36

 

 

Tarrant (segment 130

 

563

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

 

518

(45)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel) Proj-4152-11-13 (9/16/2026 - 10/20/2026)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel) Proj-4152-12 (10/10/2026 - 10/30/2026)

 

Pell City Station (segment 140)

 

474

 

229

(245)

 

229

(245)

 

229

(245)

 

229

(245)

 

229

(245)

 

474

 

474

North Main loop line west of Dearmanville: Scheduled Pipeline Maintenance(remediation) Proj-4165(WB) (10/12/2026 - 10/16/2026)

 

Dearmanville (segment 150)

 

346

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

 

326

(20)

Bell Mills Compressor Station: Scheduled Unit Maintenance Proj-4500-1 (10/5/2026 - 10/18/2026)

 

White Castle (segment 340)

 

760

 

760

 

355

(405)

 

355

(405)

 

355

(405)

 

700

(60)

 

700

(60)

 

700

(60)

White Castle Compressor Station: Scheduled Unit Maintenance Proj-5010-8 (10/16/2026 - 10/30/2026)

White Castle Compressor Station: Scheduled Unit Maintenance Proj-5010-8-9-10 (10/13/2026 - 10/15/2026)

 

Sesh (segment 380)

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

507

 

 

Gwinville (segment 400)

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

234

 

 

Bay Springs (segment 420)

 

1,675

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

 

1595

(80)

Bay Springs Compressor Station: Scheduled Unit Maintenance Proj-52161 (7/8/2025 - 10/31/2026)

 

Enterprise (segment 430)

 

2,306

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

 

2126

(180)

Enterprise Compressor Station: Scheduled Unit Maintenance Proj-5222-15 (8/3/2026 - 10/31/2026)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (5/30/2026 - 10/31/2026)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

2,305

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

 

2215

(90)

York Compressor Station: Scheduled Unit Maintenance Proj-5230-1 (10/5/2026 - 10/31/2026)

 

Gallion (Segment 440)

 

2,300

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

 

2030

(270)

Gallion Compressor Station: Scheduled Unit Maintenance Proj-5236-10 (9/21/2026 - 10/21/2026)

 

Elmore (segment 460)

 

2,010

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

 

1755

(255)

Elmore Compressor Station: Scheduled Unit Maintenance Proj-5251-12 (10/12/2026 - 10/18/2026)

 

Ellerslie (segment 490)

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

1,547

 

 

South Atlanta (segment 510)

 

522

 

522

 

522

 

522

 

522

 

522

 

522

 

522

 

 

Thomaston East (segment 530)

 

849

 

849

 

849

 

849

 

849

 

849

 

849

 

849

 

 

Ocmulgee (segment 530)

 

804

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

 

659

(145)

Ocmulgee Compressor Station: Scheduled Unit Maintenance Proj-5277-6 (9/22/2026 - 10/18/2026)

 

South Georgia (segment 650)

 

127

 

127

 

127

 

127

 

127

 

127

 

127

 

127

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

October 2026 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (9/28 - 10/4)

Week 2 (10/5 - 10/11)

Week 3 (10/12 - 10/18)

Week 4 (10/19 - 10/25)

Week 5 (10/26 - 11/1)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

203

 

 

 

 

 

203

 

 

203

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

 

 

 

36

 

 

36

 

 

 

Tarrant (segment 130)

 

 

563

 

 

 

 

518

(45)

 

538

(25)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel), Proj-4152-11-13 (9/16/2026 - 10/20/2026)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel), Proj-4152-12 (10/10/2026 - 10/30/2026)

Tarrant Compressor Station: Scheduled Unit Maintenance(panel), Proj-4152-9 (10/20/2026 -

10/31/2026)

 

Dearmanville (segment 150)

 

 

346

 

 

 

 

326

(20)

 

326

(20)

Bell Mills Compressor Station: Scheduled Unit Maintenance, Proj-4500-02 (10/19/2026 - 10/29/2026)

 

White Castle (segment 340)

 

 

760

 

 

 

 

700

(60)

 

700

(60)

White Castle Compressor Station: Scheduled Unit Maintenance, Proj-5010-8 (10/16/2026 - 10/30/2026)

 

 

Sesh (segment 380)

 

 

507

 

 

 

 

 

460

(47)

 

 

447

(60)

SESH: Scheduled Station Maintenance (M) (10/20/2026) SESH: Scheduled Station Maintenance (M) (10/21/2026 - 10/22/2026)

SESH: Scheduled Station Maintenance (M) (10/23/2026) SESH: Scheduled Station Maintenance (M) (10/27/2026) SESH: Scheduled Station Maintenance (M) (10/28/2026) SESH: Scheduled Station Maintenance (M) (10/29/2026)

 

Gwinville (segment 400)

 

 

234

 

 

 

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,675

 

 

 

 

1595

(80)

 

1560

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027) Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-52161 (7/8/2025 - 10/31/2026)

 

 

 

Enterprise (segment 430)

 

 

 

2,306

 

 

 

 

 

2126

(180)

 

 

2051

(255)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (11/1/2026 - 11/15/2026) Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (8/3/2026 - 10/31/2026) South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027) South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (5/30/2026 - 10/31/2026)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

 

2,305

 

 

 

 

2215

(90)

 

2050

(255)

York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (10/5/2026 - 10/31/2026) York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Gallion (Segment 440)

 

 

2,300

 

 

 

 

2030

(270)

 

2145

(155)

Gallion Compressor Station: Scheduled Unit Maintenance, Proj-5236-10 (9/21/2026 - 10/21/2026) South Main loop line east of Gallion: Scheduled Pipeline Maintenance(remediation), Proj-SNG-22002 (10/26/2026 - 11/1/2026)

 

Ellerslie (segment 490)

 

 

1,547

 

 

 

 

 

1,547

 

 

1,547

 

 

Thomaston West (segment 490)

 

 

1,535

 

 

 

 

1520

(15)

 

1520

(15)

Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-1 (10/19/2026 - 10/25/2026) Thomaston Compressor Station: Scheduled Unit Maintenance, Proj-5272-3 (10/26/2026 - 10/29/2026)

 

South Atlanta (segment 510)

 

 

522

 

 

 

 

 

522

 

 

522

 

 

Thomaston East (segment 530)

 

 

849

 

 

 

 

 

849

 

 

849

 

 

East/South Wrens (segment 560)

 

 

680

 

 

 

 

590

(90)

 

 

680

Wrens Compressor Station: Scheduled Unit Maintenance, Proj-5288-5 (10/19/2026 - 10/23/2026)

 

South Georgia (segment 650)

 

 

127

 

 

 

 

 

127

 

 

127

 

 

Holy Trinity (segment 655)

 

 

127

 

 

 

 

 

127

 

101

(26)

Holy Trinity Compressor Station: Scheduled Unit Maintenance, Proj-58051-2 (10/26/2026 - 10/30/2026)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

November 2026 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/2 - 11/8)

Week 2 (11/9 - 11/15)

Week 3 (11/16 - 11/22)

Week 4 (11/23 - 11/29)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

2195

(255)

 

2195

(255)

 

2400

(50)

 

2400

(50)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-5222-15 (11/1/2026 - 11/15/2026)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

York

'ZONE 1/2 BOUNDARY'

(segment 440)

 

 

2,449

 

2194

(255)

 

2194

(255)

 

 

2,449

 

 

2,449

York Compressor Station: Scheduled Unit Maintenance, Proj-5230-1 (11/1/2026 - 11/15/2026)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

December 2026 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (11/30 - 12/6)

Week 2 (12/7 - 12/13)

Week 3 (12/14 - 12/20)

Week 4 (12/21 - 12/27)

Week 5 (12/28 - 1/3)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Bay Springs (segment 420)

 

 

1,817

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

 

1702

(115)

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1 (11/1/2026 - 3/31/2027)

 

Enterprise (segment 430)

 

 

2,450

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

 

2400

(50)

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO (11/1/2026 - 3/31/2027)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

January 2027 (updated 10/08/26)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (1/4 - 1/10)

Week 2 (1/11 - 1/17)

Week 3 (1/18 - 1/24)

Week 4 (1/25 - 1/31)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

 

 

 

 

 

Bay Springs Compressor Station: Scheduled Unit Maintenance, Proj-5216-1

Bay Springs (segment 420)

 

1,817

1702

(115)

1702

(115)

1702

(115)

1702

(115)

(11/1/2026 - 3/31/2027)

 

 

 

 

 

 

South Main line east of Enterprise: Unscheduled Pipeline Maintenance - CAO

Enterprise (segment 430)

 

2,450

2400

(50)

2400

(50)

2400

(50)

2400

(50)

(11/1/2026 - 3/31/2027)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.