Sierrita Gas Pipeline Icon

Preliminary September 2026 Maintenance

Sierrita Gas Pipeline 1mo ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  79564952-SIERRITA GAS PIPELINE Critical: Y Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE Notice Eff Date/Time:  09/01/2026 2:30:19PM Notice End Date/Time:  09/02/2026 9:00:00am Post Date/Time:  9/1/2026 2:30:19 PM Notice ID: 629512 Reqrd Rsp:  5 Rsp Date/Time:  Notice Stat Desc:  INITIATE Prior Notice:  Subject:  Preliminary September 2026 Maintenance
Notice Text:

Sierrita Maintenance Calendar

September 2026

Seg Area

Seg Nbr

Flow Dir

Location

Base Capacity (MDth)

Tue
1

Wed
2

Thu
3

Fri
4

Sat
5

Sun
6

Mon
7

Tue
8

Wed
9

Thu
10

Fri
11

Sat
12

Sun
13

Mon
14

Tue
15

Wed
16

Thu
17

Fri
18

Sat
19

Sun
20

Mon
21

Tue
22

Wed
23

Thu
24

Fri
25

Sat
26

Sun
27

Mon
28

Tue
29

Wed
30

(blank)

(blank)

 

SEG. 10

523

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

 

 

 

% Seg Avail

523

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Start Date

End Date

Region

Scheduling Location

Maintenance List

Base Capacity Dthd

Total Reduction Dthd

PLM Reduction Dthd

FMJ Reduction Dthd

Net Dthd

Update

09/23/26

09/24/26

SGPL

SEG. 10

Sierrita Station inspection PIN 47698 GSDEAGU/SIERRITA SASABE PIMA delivery pressure during this maintenance will be below 750 PSIG. Capacity reduction shown based upon 600 PSIG delivery pressure at Sasabe. - Rescheduled

                             523,640

                                               -

                                              -

                                             -

        523,640

Update

In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.

Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.

These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.

More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the Sierrita Electronic Bulletin Board.

TSP/TSP Name:  79564952-SIERRITA GAS PIPELINE Critical: Y Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE Notice Eff Date/Time:  09/01/2026 2:30:19PM Notice End Date/Time:  09/02/2026 9:00:00am Post Date/Time:  9/1/2026 2:30:19 PM Notice ID: 629512 Reqrd Rsp:  5 Rsp Date/Time:  Notice Stat Desc:  INITIATE Prior Notice:  Subject:  Preliminary September 2026 Maintenance
Notice Text:

Sierrita Maintenance Calendar

September 2026

Seg Area

Seg Nbr

Flow Dir

Location

Base Capacity (MDth)

Tue
1

Wed
2

Thu
3

Fri
4

Sat
5

Sun
6

Mon
7

Tue
8

Wed
9

Thu
10

Fri
11

Sat
12

Sun
13

Mon
14

Tue
15

Wed
16

Thu
17

Fri
18

Sat
19

Sun
20

Mon
21

Tue
22

Wed
23

Thu
24

Fri
25

Sat
26

Sun
27

Mon
28

Tue
29

Wed
30

(blank)

(blank)

 

SEG. 10

523

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

 

 

 

% Seg Avail

523

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Start Date

End Date

Region

Scheduling Location

Maintenance List

Base Capacity Dthd

Total Reduction Dthd

PLM Reduction Dthd

FMJ Reduction Dthd

Net Dthd

Update

09/23/26

09/24/26

SGPL

SEG. 10

Sierrita Station inspection PIN 47698 GSDEAGU/SIERRITA SASABE PIMA delivery pressure during this maintenance will be below 750 PSIG. Capacity reduction shown based upon 600 PSIG delivery pressure at Sasabe. - Rescheduled

                             523,640

                                               -

                                              -

                                             -

        523,640

Update

In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.

Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.

These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.

More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the Sierrita Electronic Bulletin Board.