Sierrita Gas Pipeline Icon

Preliminary March 2026 Maintenance

Sierrita Gas Pipeline 6d ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  79564952-SIERRITA GAS PIPELINE Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  02/17/2026 5:01:30PM Notice End Date/Time:  02/18/2026 9:00:00am
Post Date/Time:  2/17/2026 5:01:30 PM Notice ID: 627575
Reqrd Rsp:  5 Rsp Date: 
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  Preliminary March 2026 Maintenance
Notice Text:

Start Date

End Date

Region

Scheduling Location

Maintenance List

Base Capacity Dthd

Total Reduction Dthd

PLM Reduction Dthd

FMJ Reduction Dthd

Net Dthd

Update

3/10/2026

3/11/2026

SGPL

SEG. 10

Sierrita Station inspection PIN 47698 GSDEAGU/SIERRITA SASABE PIMA delivery pressure during this maintenance will be below 750 PSIG. Capacity reduction shown based upon 600 PSIG delivery pressure at Sasabe.

523,640

360,640

360,640

163,000

 

In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.

Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.

These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.

More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the SIERRITA Electronic Bulletin Board.

 

TSP/TSP Name:  79564952-SIERRITA GAS PIPELINE Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  02/17/2026 5:01:30PM Notice End Date/Time:  02/18/2026 9:00:00am
Post Date/Time:  2/17/2026 5:01:30 PM Notice ID: 627575
Reqrd Rsp:  5 Rsp Date: 
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  Preliminary March 2026 Maintenance
Notice Text:

Start Date

End Date

Region

Scheduling Location

Maintenance List

Base Capacity Dthd

Total Reduction Dthd

PLM Reduction Dthd

FMJ Reduction Dthd

Net Dthd

Update

3/10/2026

3/11/2026

SGPL

SEG. 10

Sierrita Station inspection PIN 47698 GSDEAGU/SIERRITA SASABE PIMA delivery pressure during this maintenance will be below 750 PSIG. Capacity reduction shown based upon 600 PSIG delivery pressure at Sasabe.

523,640

360,640

360,640

163,000

 

In addition to planned outages, this report reflects the repairs and maintenance being performed related to Force Majeure events.

Due to the nature of such events, the dates for the associated repairs and maintenance of those events are assumed to extend until the end of the month.

These repairs and maintenance, however, may extend beyond the end of the month including beyond the current year.

More information on these repairs and maintenance will be posted as a Critical Notice under the Notices section of the Informational Postings tab on the SIERRITA Electronic Bulletin Board.