Equitrans Gathering Icon

Zink Compressor Station Maintenance [08-09-26]

Equitrans Gathering 1d ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

07-09-2026 13:35:00

Page 1 of 1

System Wide Notice Detail

TSP Name:

EUREKA

TSP:
Post Date/Time:

Thu Jul 09 13:35:00 GMT 2026

Subject:

Zink Compressor Station Maintenance [08-09-26]

Notice Type:

CRITICAL

Notice ID:

43849

Notice Status Desc:

Initiate

Critical Desc:

Critical Notice

Notice Eff Date:

07-09-2026

Notice Eff Time:

13:35:00

Notice End Date:

11-30-2026

Notice End Time:

23:59:59

Required Response Indicator Description:

Notice Text:

Eureka Midstream LLC is providing notice of planned maintenance at Zink Compressor Station impacting deliveries to its downstream interconnects on the
August 09 through August 13, 2026, Gas Days.

In conjunction with this maintenance, Operationally Available Capacity is reduced to nomination total of 305,000 DTH at the REX Interconnect, Meter
#60059 (Eureka Cameron) for the August 09 through August 13, 2026, Gas Days. Additionally, physical flow from Eureka Zink Compressor Station to the
LXP Interconnect, Meter #743103 (Eureka) will be restricted to 0 DTHS for the August 09 through August 13, 2026, Gas Days.

All operators with production flowing to Zink Compressor Station should expect to see higher than normal line pressure and a possible reduction in flow to
receipts. Nominations should be adjusted accordingly.

Nominations at Delivery Meter # 743103 (LXP-Eureka) from the EM-ORS Receipt IC (Meter # 10057) will not be impacted by this maintenance.

Nominations will be scheduled to not exceed the aforementioned amounts. These amounts are based on projected operating conditions and are subject to
change.

Should specific shut-ins be required, EQT Midstream will notify impacted parties.

Customers should monitor EQT Midstream customer portal - Gathering Informational Postings Website for updates to this notice.
*For production operations, Zink Compressor Station throughput will be reduced to 290 MMCFD for the August 09 through August 13, 2026, Gas Days.

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.


System Wide Notice Detail
TSP Name:
EUREKA
TSP:
Post Date/Time:

Thu Jul 09 13:35:00 GMT 2026
Subject:
Zink Compressor Station Maintenance [08-09-26]
Notice Type:
CRITICAL
Notice ID:
43849
Notice Status Desc:
Initiate
Critical Desc:
Critical Notice
Notice Eff Date:
07-09-2026
Notice Eff Time:
13:35:00
Notice End Date:
11-30-2026
Notice End Time:
23:59:59
Required Response Indicator Description:
Eureka Midstream LLC is providing notice of planned maintenance at Zink Compressor Station impacting deliveries to its downstream interconnects on the
August 09 through August 13, 2026, Gas Days.
In conjunction with this maintenance, Operationally Available Capacity is reduced to nomination total of 305,000 DTH at the REX Interconnect, Meter
#60059 (Eureka Cameron) for the August 09 through August 13, 2026, Gas Days. Additionally, physical flow from Eureka Zink Compressor Station to the
LXP Interconnect, Meter #743103 (Eureka) will be restricted to 0 DTHS for the August 09 through August 13, 2026, Gas Days.
All operators with production flowing to Zink Compressor Station should expect to see higher than normal line pressure and a possible reduction in flow to
receipts. Nominations should be adjusted accordingly.
Notice Text:
Nominations at Delivery Meter # 743103 (LXP-Eureka) from the EM-ORS Receipt IC (Meter # 10057) will not be impacted by this maintenance.
Nominations will be scheduled to not exceed the aforementioned amounts. These amounts are based on projected operating conditions and are subject to
change.
Should specific shut-ins be required, EQT Midstream will notify impacted parties.
Customers should monitor EQT Midstream customer portal - Gathering Informational Postings Website for updates to this notice.
*For production operations, Zink Compressor Station throughput will be reduced to 290 MMCFD for the August 09 through August 13, 2026, Gas Days.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
07-09-2026 13:35:00
Page 1 of 1