El Paso Natural Gas Icon

SOC Declaration-Location Specific Draft

El Paso Natural Gas 2w ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER Notice Type Desc (2):  OFO
Notice Eff Date/Time:  05/08/2026 8:42:22AM Notice End Date/Time:  05/09/2026 9:00:00am
Post Date/Time:  5/8/2026 8:42:22 AM Notice ID: 628303
Reqrd Rsp:  1 Rsp Date:  05/08/2026
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SOC Declaration-Location Specific Draft
Notice Text:

STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT

 

EFFECTIVE DATE: May 8, 2026

IMBALANCE TOLERANCE: 5%

 

DURATION:  Until Further Notice

 

AFFECTED AREAS/LOCATIONS:  Specific to the following location.

 

DTEP S78 (301149)

 

OPERATING CONDITION SUMMARY:   The EPNG system linepack level starts Gas Day May 8. 2026, at an acceptable level.  The location listed above continues to draft the system and undermines our ability to maintain linepack within acceptable levels.

 

Deliveries in excess of scheduled quantities.

 

CUSTOMER ACTION REQUIRED:  Immediate action is required to ensure that system pressure remain at a level capable of meeting scheduled deliveries off the system.

 

EPNG RESPONSE:

- Washington Ranch is available for withdrawal.

- IHSW Service will be suspended.

 

REFERENCE INFORMATION:

 

For scheduling questions, please call your scheduling representative at (800) 238-3764.

 

For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.

 

For media inquiries, please contact media relations at newsroom@kindermorgan.com.

 

 

TSP/TSP Name:  8001703-EL PASO NATURAL GAS CO. L.L.C. Critical: Y
Notice Type Desc (1):  OPERATIONAL FLOW ORDER Notice Type Desc (2):  OFO
Notice Eff Date/Time:  05/08/2026 8:42:22AM Notice End Date/Time:  05/09/2026 9:00:00am
Post Date/Time:  5/8/2026 8:42:22 AM Notice ID: 628303
Reqrd Rsp:  1 Rsp Date:  05/08/2026
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SOC Declaration-Location Specific Draft
Notice Text:

STRAINED OPERATING CONDITION (SOC) Declaration – Location Specific DRAFT

 

EFFECTIVE DATE: May 8, 2026

IMBALANCE TOLERANCE: 5%

 

DURATION:  Until Further Notice

 

AFFECTED AREAS/LOCATIONS:  Specific to the following location.

 

DTEP S78 (301149)

 

OPERATING CONDITION SUMMARY:   The EPNG system linepack level starts Gas Day May 8. 2026, at an acceptable level.  The location listed above continues to draft the system and undermines our ability to maintain linepack within acceptable levels.

 

Deliveries in excess of scheduled quantities.

 

CUSTOMER ACTION REQUIRED:  Immediate action is required to ensure that system pressure remain at a level capable of meeting scheduled deliveries off the system.

 

EPNG RESPONSE:

- Washington Ranch is available for withdrawal.

- IHSW Service will be suspended.

 

REFERENCE INFORMATION:

 

For scheduling questions, please call your scheduling representative at (800) 238-3764.

 

For operational and capacity questions, please call Russ Pyeatt at (719) 520-3729, Dan English at (719) 520-4722, Morgan McCasland at (719) 520-4339, or John Althoff at (719) 667-7750.

 

For media inquiries, please contact media relations at newsroom@kindermorgan.com.